Laserfiche WebLink
RO <br />O <br />F <br />T <br />OP <br />GR <br />O <br />UN <br />D <br /> <br />LE <br />V <br />E <br />L <br /> <br />- <br />HO <br />U <br />SE EX <br />T <br />ER <br />IOR <br />20A <br />N <br />2 (N) JUNCTION BOX <br />WITH IRREVERSIBLE <br />GROUND SPLICE <br />NOTE: IN BETWEEN EACH ARRAY THE EMT IS USED AS THE <br />GROUNDING / BONDING, GROUND CLAMPS ARE AT EACH <br />END OF THE EMT CONDUIT WITH THE WIRE THEN FREE <br />AIR'D TO THE GROUND CLAMP ON THE RACKING RAIL <br />(N) 100A PV LOAD <br />CENTER <br />112 <br />112 6 5 <br />(N) (12) SOLAREVER SE-166*83-455M-144 (455W) MODULES <br /> WITH (6) AP SYSTEM DS3-L 2 IN 1 MICRO-INVERTER <br />ATTACHED TO THE BACK OF MODULES. <br />PV CIRCUIT 2: 6 MODULES/PARALLEL [(3) AP SYSTEM DS3-L 2 IN 1] <br />PV CIRCUIT 1: 6 MODULES/PARALLEL [(3) AP SYSTEM DS3-L 2 IN 1] <br />1 <br />1 <br />20A <br />100A30A <br />BACKFEED <br />BREAKER <br />ALL EXISTING LOADS <br />RELOCATED FROM MAIN <br />SERVICE PANEL TO NEW <br />SUB SERVICE PANEL <br />(N) 240V/125A <br />SUB SERVICE PANEL <br />SINGLE PHASE <br />M <br />POINT OF <br /> DELIVERY AND <br />INTERCONNECTION <br />100A <br />N <br />(E) GROUNDING <br />ELECTRODE OR <br />(UFER) <br />EXISTING <br />240V/100A <br />MAIN SERVICE PANEL <br />SINGLE PHASE <br />4 3 <br />N <br />6 5 <br />AC <br />DISCONNECT <br />TO BE LOCATED <br />WITHIN 10' OF <br />METER <br />(N) VISIBLE <br />LOCKABLE <br />2 POLE 60A <br />'KNIFE' A/C <br />DISCONNECT <br />3 SHEET <br />CONTRACTOR <br />SOLGEN CONSTRUCTION LLC. <br />MARTINEZ <br />RESIDENCE <br />License#: C-10 1053344 <br />ADDRESS: 2072 N MAIN ST <br />FL 2, LOGAN <br /> UT 84341-1993 <br />CSLB#: 1053344 <br />DESIGNER: ORG <br />CORE ENERGY GROUP. <br />2029 CEDAR ST, <br /> SANTA ANA, <br /> CA 92707 <br /> APN: 01411247 <br /> DATE:10/18/2022 <br />E-1 <br />METER # 222013159246 <br />SYSTEM SUMMARY <br />BRANCH #1 <br />INVERTERS PER BRANCH 3 <br />MAX AC CURRENT 9.6A <br />MAX AC OUTPUT POWER 2304W <br />ARRAY STC POWER 5460W <br />ARRAY PTC POWER 5096.40W <br />MAX AC CURRENT 19.20A <br />MAX AC POWER 4608W <br />DERATED (CEC) AC POWER <br />BRANCH #2 <br />3 <br />9.6A <br />2304W <br />Inverter Ratings <br />Inverter Make/Model AP SYSTEM DS3-L <br />Max DC Volt Rating 60V <br />Peak Output Power 768W <br />Max Nominal Voltage 240V <br />Max AC Current 3.20A <br />Max OCPD Rating 20A <br />DESIGN TEMPERATURES <br />ASHRAE EXTREME LOW 2°C <br />ASHRAE 2% HIGH 31 °C <br />PV Module Ratings @ STC <br />Module Make/Model <br />SOLAREVER <br />SE-166*83-455M-144 (455W) <br />MODULE <br />Max Power-Point Current (Imp)10.96A <br />Max Power-Point Voltage (Vmp)41.51 V <br />Open-Circuit Voltage (Voc)49.35V <br />Short-Circuit Current (Isc)11.41 A <br />Max Series Fuse (OCPD)20A <br />Nominal Maximum Power at STC <br />(Pmax)455W <br />Maximum System Voltage 1500V <br />Voc Temperature Coefficient -0.29%/°C <br />NOTE:TOTAL AMPERAGE RATING OF <br />ALL OVERCURRENT DEVICES SUMMED <br />UP IN THE MAIN PANEL EXCLUDING <br />MAIN SUPPLY OVERCURRENT DEVICE, <br />SHALL NOT EXCEED AMPACITY OF BUS <br />BAR NEC 2017 705.12(D)(2)(3)(c) <br />Conduit and Conductor Schedule <br />Tag Description Wire Gauge # of Conductors Conduit Type Conduit Size <br />1 PV WIRES 10 AWG 2 N/A - Free Air N/A - Free Air <br />1 Bare Copper Ground (EGC/GEC) 6 AWG 1 N/A - Free Air N/A - Free Air <br />2 THWN-2 10 AWG 4 EMT 3/4" <br />2 THWN-2 - Ground 8 AWG 1 EMT 3/4" <br />3 THWN-2 10 AWG 3 EMT <br />3 THWN-2 - Ground 8 AWG 1 EMT <br />SUB SERVICE PANEL <br />240/120V 1Ø, 3W <br />MAIN BUSS: 125A <br />MAX BREAKER SIZE: <br />(125A X 1.2) - 100A = 50A <br />4 THWN-2 3 AWG 3 EMT <br />THWN-2 - Ground 6 AWG 1 EMT 1-1/4" <br />1-1/4" <br />4 <br />3/4" <br />3/4" <br />4918W <br />2029 S Cedar <br />12/07/22