My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2029 S Cedar - Plan
PBA
>
Building
>
ProjectDox
>
B
>
Bamdal St
>
1823 S Bamdal St
>
2029 S Cedar - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:00:35 PM
Creation date
6/1/2025 12:00:24 PM
Metadata
Fields
Template:
Plan
Permit Number
20178016
101112853
Full Address
1823 S Bamdal St
2029 S Cedar St
Document Relationships
20178016 - Permit
(Permit - Plan)
Path:
\Building\Permits\B\Bamdal St\1823 S Bamdal St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3' <br />3' <br />N <br />1'-6" <br />SCALE: 3/32" = 1'-0" <br />PV SYSTEM SITE PLAN <br />PV SYSTEM SIZE: <br />5.46 kW DC <br />LOCATION OF METER MAIN COMBO <br /> LEGEND <br />M <br />CONSTRUCTION NOTES <br />M <br />PV INTERCONNECTION POINT. LOCATION OF <br />SUB SERVICE PANEL, AC DISCONNECT & PV <br />LOAD CENTER MOUNTED ON EXTERIOR WALL <br />OF A SINGLE FAMILY RESIDENCE. <br />NEW SOLAR PANELS <br />DRIVEWAY <br />(12) SOLAREVER SE-166*83-455M-144 (455W) WITH <br />(6) AP SYSTEM DS3-L MICRO-INVERTERS <br />MOUNTED TO THE BACK OF MODULES MOUNTED <br />ON COMP SHINGLE ROOF <br />2029 CEDAR ST <br />ROOF OBSTRUCTIONS <br />SHEET <br />CONTRACTOR <br />SOLGEN CONSTRUCTION LLC. <br />MARTINEZ <br />RESIDENCE <br />License#: C-10 1053344 <br />ADDRESS: 2072 N MAIN ST <br />FL 2, LOGAN <br /> UT 84341-1993 <br />CSLB#: 1053344 <br />DESIGNER: ORG <br />CORE ENERGY GROUP. <br />2029 CEDAR ST, <br /> SANTA ANA, <br /> CA 92707 <br /> APN: 01411247 <br /> DATE:10/18/2022 <br />PV-1 <br />(E) SERVICE DROP <br />Roof Azimuth: 180° <br />Roof Tilt: 27° <br />Roof Section 1 <br />ACD AC DISCONNECT <br />LC PV LOAD CENTER <br />1. SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON <br />RESIDENTIAL STRUCTURE. <br />2. THIS PROJECT HAS BEEN DESIGNED IN COMPLIANCE <br />WITH THE CBC SECTION 1609 TO WITHSTAND A BASIC <br />WIND SPEED OF 110 MPH (3 SECOND GUST), WIND <br />EXPOSURE C. <br />3. THE ROOF MEMBERS ARE 2 "X 4" TRUSSES AT 24" ON <br />CENTER. CONNECTION TO STRUCTURE SHALL NOT BE <br />WITHIN 11" OF NAILING PLATES. <br />4. THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT <br />OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING <br />ROOF VENTS. <br />5. ALL CONDUCTORS AND CONDUITS MOUNTED ON ROOF <br />SHALL BE MINIMUM 7/8" ABOVE ROOF SURFACE <br />(INCLUDING CABLES UNDERNEATH MODULES AND <br />RACKING). <br />6. ROOF ACCESS POINTS SHALL BE PROVIDED PER THE <br />FOLLOWING (CRC R324.7.1, CBC 3111.2.1) <br />6.1. LOCATED IN AREAS NOT REQUIRING PLACEMENT <br />OF GROUND LADDERS OVER OPENINGS SUCH AS <br />DOORS OR WINDOWS. <br />6.2. LOCATED AT STRONG POINTS OF CONSTRUCTION IN <br />LOCATIONS WHERE ACCESS POINT DOES NOT <br />CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH <br />AS: TREES, WIRES, OR SIGNS. <br />7. SETBACKS AT RIDGES CAN BE REDUCED TO 18 INCHES <br />IN COMPLIANCE WITH 2019 CFC/2018 IFC 1204.2.1.2 <br />TOTAL PLAN VIEW AREA = 1834 SQFT TOTAL PV <br />AREA = 12(82.44 IN)(40.86 IN)/(144 IN^2) = 280.71 SQFT <br />(280.71 SQFT/ 1834 SQFT)100 = 15.31 % TOTAL PV <br /> AREA POPULATES 15.31 % OF TOTAL PLAN VIEW <br /> AREA AND IS WITHIN THE 33% REQUIREMENT. <br />LC <br />LOCATION OF "RAPID SHUTDOWN" <br />AC DISCONNECT NEC 690.12 <br />METER MAIN COMBO <br />CAL-FIRE ROOF LADDER <br />ACCESS POINT <br />SS <br />P <br />SSP SUB SERVICE PANEL <br />PROPERTY LINEPROPERTY LINE <br />PR <br />O <br />P <br />E <br />R <br />T <br />Y <br /> <br />L <br />I <br />N <br />E <br />PR <br />O <br />P <br />E <br />R <br />T <br />Y <br /> <br />L <br />I <br />N <br />E <br />PR <br />O <br />P <br />E <br />R <br />T <br />Y <br /> <br />L <br />I <br />N <br />E <br />PR <br />O <br />P <br />E <br />R <br />T <br />Y <br /> <br />L <br />I <br />N <br />E <br />CAL-FIRE ROOF LADDER <br />ACCESS POINT <br />(E) STRUCTURE ON <br />PROPERTY <br />AC <br />D <br />Structural <br />Only <br />BLDG# 101112853 ISS. 12/07/2022 <br />ELEC# 20178018 ISS. 12/07/2022 <br /> <br />The scope of the plans is for the installation of the solar <br />photovoltaic system only and the approval is subject to compliance <br />with all applicable city and state codes and regulations regarding <br />construction. The approval of the plans does not constitute any <br />certification of the accuracy, completeness, or building permit <br />status of the existing buildings and structures as shown. <br />2029 S Cedar <br />12/07/22
The URL can be used to link to this page
Your browser does not support the video tag.