My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
210 W 19th St - Plan
PBA
>
Building
>
ProjectDox
>
N
>
Nineteenth St
>
210 W Nineteenth St
>
210 W 19th St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:02:00 PM
Creation date
6/1/2025 12:01:21 PM
Metadata
Fields
Template:
Plan
Permit Number
20182849
30147263
40139112
101119348
101119349
Full Address
210 W Nineteenth St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3' <br /> <br />- <br /> <br />0 <br />" <br />9' <br /> <br />- <br /> <br />0 <br />" <br />4' <br /> <br />- <br /> <br />0 <br />" <br />9' <br /> <br />- <br /> <br />0 <br />" <br />7' <br /> <br />- <br /> <br />4 <br />" <br />12 <br />' <br /> <br />- <br /> <br />0 <br />" <br />13 <br />' <br /> <br />- <br /> <br />0 <br />" <br />8" <br />33 <br />' <br /> <br />- <br /> <br />0 <br />" <br />FINISH FLOOR <br />CEILING HEIGHT <br />FINISH FLOOR <br />TOP OF PLATE <br />BUILDING HEIGHT <br />CEILING HEIGHT <br />25' - 11" <br />4" <br />12" <br />6" <br />12" <br />4" <br />12" <br />4" <br />12" <br />11 11 1866 6 66 6 11 6 <br />6 6 517 2 <br />3 171877 <br />4 14 13 91513157 <br />15 138888 8 88 <br />8 8 <br />113 5 <br />16 <br />19 <br />FINISH GROUND <br />1' - 10" <br />98 <br />" <br /> <br />M <br />I <br />N <br />. <br />8' <br /> <br />- <br /> <br />2 <br />" <br />FINISH FLOOR <br />CEILING HEIGHT <br />FINISH FLOOR <br />CEILING HEIGHT <br />TOP OF PLATE <br />BUILDING HEIGHT <br />3' <br /> <br />- <br /> <br />0 <br />" <br />9' <br /> <br />- <br /> <br />0 <br />" <br />4' <br /> <br />- <br /> <br />0 <br />" <br />9' <br /> <br />- <br /> <br />0 <br />" <br />7' <br /> <br />- <br /> <br />4 <br />" <br />12 <br />' <br /> <br />- <br /> <br />0 <br />" <br />13 <br />' <br /> <br />- <br /> <br />0 <br />" <br />8" <br />33 <br />' <br /> <br />- <br /> <br />0 <br />" <br />4" <br />12" <br />18 186 6 6 3518 <br />2 5 66 10 144914159 91515 <br />131515 <br />13 <br />688 51 1 <br />17 <br />19 <br />FINISH GROUND <br />1 <br />(N) DOOR/WINDOW, SEE DOOR/WINDOW SCHEDULE ON SHEET A2.2 <br />2 <br />3 <br />4 <br />(N) ASPHALT SHINGLE ROOF COVERING SYSTEM PER ICC-ESR-1389, <br />COLOR: MOIRE BLACK, CLASS "A" OR BETTER. ROOF COVERING OVER FLASHING <br />OVER 2 LAYERS OF #15 ROOF FELT OVER 1/2" CDX PLYWOOD SHEATHING. <br />5 <br />(N) 7/8" THICK SCRATCH & MARQUEE COAT STUCCO - STUDIO CLAY MQ2-27 <br />OVER WIRE MESH AND COVERING OVER WEATHER-RESISTIVE BARRIER <br />(2 LAYERS OF BUILDING PAPER TYPE "D" AT PLYWOOD SHEAR WALL) <br />6 <br />(N) 2x6 FASCIA BOARD <br />8 <br />(N) 6" JAMES HARDIE PLANK BOARD <br />9 <br />(N) TRASH ENCLOSURE DOOR10 <br />(N) GALVANIZED ATTIC VENT11 <br />(N) DOOR/WINDOW TRIM <br />7 <br />(N) 9" JAMES HARDIE PLANK BOARD <br />(N) WOOD SHINGLE SIDING <br />12 (N) BUILDING ADRESS 6" HIGH CHARACTER & 1" STROKE <br />12" WOOD TRIM13 <br />8" WOOD TRIM14 <br />6" WOOD TRIM15 <br />2" WALL REVEAL <br />(N) STONE VENEER16 <br />(N) COLUMN, REFER TO STRUCTURAL DWG.17 <br />18 (N) 2x12 FASCIA BOARD <br />19 (N) WOOD MOLDING <br />JOB# <br />DATE <br />DRAWN <br />SCALE <br />Th <br />i <br />s <br /> <br />D <br />u <br />c <br />o <br />u <br />m <br />e <br />n <br />t <br /> <br />i <br />s <br /> <br />t <br />h <br />e <br /> <br />p <br />r <br />o <br />p <br />e <br />r <br />t <br />y <br /> <br />o <br />f <br /> <br />Y <br />N <br /> <br />A <br />R <br />C <br />H <br />I <br />T <br />E <br />C <br />T <br />S <br />, <br /> <br />I <br />N <br />C <br />. <br />, <br /> <br />a <br />n <br />d <br /> <br />s <br />h <br />a <br />l <br />l <br />n <br />o <br />t <br /> <br />be <br /> <br />r <br />e <br />p <br />o <br />r <br />d <br />u <br />c <br />e <br />d <br /> <br />w <br />i <br />t <br />h <br />o <br />u <br />t <br /> <br />t <br />h <br />e <br /> <br />w <br />r <br />i <br />t <br />t <br />e <br />n <br /> <br />c <br />o <br />n <br />s <br />e <br />n <br />t <br /> <br />o <br />f <br /> <br />Y <br />N <br />G <br /> <br />A <br />R <br />C <br />H <br />I <br />T <br />E <br />C <br />T <br />S <br />, <br /> <br />I <br />N <br />C. <br />© <br />C <br />O <br />P <br />Y <br />R <br />I <br />G <br />H <br />T <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />S <br />No. C-32798 <br />HC <br />F <br />RADSEN <br />E <br />S <br />TAT <br />LCAIOF <br />EILC <br />A <br />ORNI <br />TC <br />ITEYENNY NG <br />DATERENEWAL <br />03-31-25 <br /> 1/4" = 1'-0" <br />A4.2 <br />PR <br />O <br />P <br />O <br />S <br />E <br />D <br /> <br />E <br />L <br />E <br />V <br />A <br />T <br />I <br />O <br />N <br />S <br />YC23005 <br />AN <br />C <br />E <br />N <br />A <br />Y <br /> <br />C <br />O <br />M <br />M <br />E <br />R <br />C <br />I <br />A <br />L <br /> <br />O <br />F <br />F <br />I <br />C <br />E <br />JAN 2024 <br />T.N. <br />21 <br />0 <br /> <br />W <br />. <br /> <br />1 <br />9 <br />T <br />H <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />6 <br />SCALE <br /> 1/4" = 1'-0"1PROPOSED WEST ELEVATION <br />• <br />• <br />(TABLE 705.8) ALLOWABLE OPENNING (TABLE 705.8) ALLOWABLE OPENNING <br />WEST WALL:WEST WALL: (SPRINKLER) <br />WINDOW AREA OPENING: <br />3'-6" x 6'-0"= 21 SF <br />3'-0" x 6'-0"= 18 SF <br />1ST FLOOR:1,195 SF <br />25% ALLOWABLE AREA = 298.8 SF <br />PROVIDED 02 WINDOWS: 36 SF <br />DOORS: 48 SF <br />OPENING @ PARKING: 211 SF <br />TOTAL PROVIDED: 295 SF <br />2ND FLOOR: 1,152 SF <br />25% ALLOWABLE AREA = 288 SF <br />PROVIDED 06 WINDOWS: 99 SF <br />• <br />(TABLE 705.8) ALLOWABLE OPENNING (TABLE 705.8) ALLOWABLE OPENNING <br />SOUTH WALL:SOUTH WALL: (SPRINKLER) <br />WINDOW AREA OPENING: <br />3'-6" x 6'-0"= 21 SF <br />2ND FLOOR: 505 SF <br />45% ALLOWABLE AREA = 227.3 SF <br />PROVIDED 04 WINDOWS 84 SF <br />SCALE <br /> 1/4" = 1'-0"2PROPOSED SOUTH ELEVATION <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br />07 <br />/ <br />3 <br />1 <br />/ <br />2 <br />0 <br />2 <br />4 <br />2N <br />D <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br />2 <br />9/ <br />1 <br />6 <br />/ <br />2 <br />0 <br />2 <br />4 <br />3R <br />D <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br />3 <br />10 <br />/ <br />0 <br />1 <br />/ <br />2 <br />0 <br />2 <br />4 <br />OC <br />F <br />A <br /> <br />R <br />E <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br />5 <br />11 <br />/ <br />0 <br />3 <br />/ <br />2 <br />0 <br />2 <br />4 <br />5T <br />H <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br />ELEVATION KEYNOTES <br />5 <br />5 <br />5 <br />210 W 19th St <br />4/14/2025
The URL can be used to link to this page
Your browser does not support the video tag.