Laserfiche WebLink
RESTRICTIVE NOTICE <br />DATE REVISIONS <br />SHEET DESCRIPTION <br />PROJECT OWNER <br />PROJECT ADDRESS <br />STAMP <br />NO: <br />REVISIONS <br />THESE DESIGNS, DRAWINGS, AND <br />SPECIFICATIONS ARE THE EXCLUSIVE <br />PROPERTY OF DONG ENGINEERING. <br />THESE DRAWINGS CANNOT BE COPIED, <br />TRANSFERRED, OR REPRODUCED NOR <br />CAN ANY OTHER STRUCTURES BE BUILT <br />FROM THEM WITHOUT WRITTEN CONSENT. <br />SHEET <br />DE#: <br />TEL- 714-617-5979 <br />GARDEN GROVE, CA 92841 <br />7661 GARDEN GROVE BLVD., <br />DONG ENGINEERING, INC. <br />INFO@DONGENGINEERING.COM <br />230520 <br />AD <br />D <br />I <br />T <br />I <br />O <br />N <br />- <br />A <br />D <br />U <br />21 <br />0 <br />2 <br /> <br />N <br />. <br />W <br />R <br />I <br />G <br />H <br />T <br /> <br />S <br />T <br />, <br /> S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />04/09/2024 PLAN CHECK1. <br />SD2 <br />STRUCTURAL DETAILS <br />22X CEILING JOIST PER PLAN.Roof~3 <br />32X STUD PER PLAN.Wall~1 <br />42X BEVELED BLK'G.Roof~4 <br />5ROOF SHEATHING AND NAILING PER NAILING SCHDL.Roof~1 <br />6SHEARWALL PER PLAN.Wall~2 <br />7FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_L~4 <br />8FRAMING CLIP @ ALT. LOCATION.A-A35_L~3 <br />9BOUNDARY NAILS.N-10d~ <br />106-16d COMMON NAILS @ EA. RAFTER AND CEILING JOIST.ROOF~11 <br />11DBL. TOP PLATE OR DROP BM. PER PLAN.WALL~6 <br />12X ROOF RAFTER PER PLAN.ROOF~2 <br />1. 2X ROOF RAFTER PER PLAN. <br />2. 2X CEILING JOIST PER PLAN. <br />3. 2X STUD PER PLAN. <br />4. 2X BEVELED BLK'G. <br />5. ROOF SHEATHING AND NAILING <br />PER NAILING SCHDL. <br />6. SHEARWALL PER PLAN. <br />7. FRAMING CLIP LTP4 PER <br />SHEARWALL SCHDL. @ 48" O.C. MAX. <br />8. FRAMING CLIP @ ALT. LOCATION. <br />9. BOUNDARY NAILS. <br />10. 6-16d COMMON NAILS @ EA. <br />RAFTER AND CEILING JOIST. <br />11. DBL. TOP PLATE OR DROP BM. <br />PER PLAN. <br />111 <br />SHEAR TRANSFER <br />12X ROOF RAFTER PER PLAN.ROOF~2 <br />22X CEILING JOIST PER PLAN.ROOF~3 <br />32X CEILING JOIST OR BLK'G <br />42X STUD WALL PER PLAN.WALL~1 <br />5SHEARWALL PER PLAN.WALL~2 <br />6FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~1 <br />6FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_L~4 <br />7PROVIDE 2X STRUT @ 48" O.C. W/ A35 @ EA. END. <br />82X LEDGER W/ 2-16d @ 6" O.C. TO 2X BLK'G.MISC~2 <br />82X LEDGER W/ 2-16d @ 6" O.C. TO 2X BLK'G.MISC~292X BLK'G @ 4'-0" O.C. <br />102 x 4 FLAT SPAN ACROSS MIN. 6 C.J. @ 8'-0" MAX. <br />11DBL. TOP PLATE.W-22X4~ <br />12ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />13CONT. PLYWOOD <br />1. 2X ROOF RAFTER PER PLAN. <br />2. 2X CEILING JOIST PER PLAN. <br />3. 2X RIM OR BLK'G. <br />4. 2X STUD WALL PER PLAN. <br />5. SHEARWALL PER PLAN. <br />6. FRAMING CLIP LTP4 PER <br />SHEARWALL SCHDL. <br />@ 48" O.C. MAX. <br />7. PROVIDE 2X STRUT <br />@ 48" O.C. W/ A35 @ EA. END. <br />8. 2X LEDGER W/ 2-16d @ 6" <br />O.C. TO 2X BLK'G. <br />9. 2X BLK'G @ 4'-0" O.C. <br />10. 2 x 4 FLAT SPAN ACROSS <br />MIN. 6 C.J. @ 8'-0" MAX. <br />11. DBL. TOP PLATE. <br />12. ROOF SHEATHING AND <br />NAILING PER NAILING SCHDL. <br />13. CONT. PLYWOOD <br />111 <br />SHEAR TRANSFER <br />1ROOF TRUSS BY MFR., SEE PLAN.ROOF~13 <br />22X BLK'G @ 48" O.C.WALL~73SIMPSON "DTC" @ 48" O.C. MAX.H-DTC~ <br />4JOIST OR TRUSS BOTT. CHORD.4JOIST OR TRUSS BOTT. CHORD. <br />3SIMPSON "DTC" @ 48" O.C. MAX.H-DTC~ <br />5NON BEARING WALL. <br />3/ <br />4 <br />" <br />, <br /> <br />T <br />Y <br />P <br />. <br />3/ <br />4 <br />" <br />, <br /> <br />T <br />Y <br />P <br />. <br />5NON BEARING WALL. <br />1. ROOF OR FLOOR SYSTEM OR TRUSSES BY MFR., SEE PLAN. <br />2. 2X BLK'G @ 48" O.C. <br />3. SIMPSON "DTC" @ 48" O.C. MAX. <br />4. JOIST OR TRUSS BOTT. CHORD. <br />5. NON BEARING WALL. <br />111 <br />NON-BEARING WALL DETAIL <br />1BEAM PER PLAN. <br />1BEAM PER PLAN.1BEAM PER PLAN. <br />2DBL. TOP PLATE. <br />2DBL. TOP PLATE.2DBL. TOP PLATE.3SIMPSON STRAP MSTI36 OR ST6224 3SIMPSON STRAP MSTI36 OR ST6224 <br />4SIMPSON (2)A35 @ TOP & BOTT. <br />4SIMPSON (2)A35 @ TOP & BOTT. <br />4SIMPSON (2)A35 @ TOP & BOTT. <br />5POST OR MULTI STUD PER PLAN.WALL~3 <br />5POST OR MULTI STUD PER PLAN.5POST OR MULTI STUD PER PLAN. <br />6(3)16d EA. SIDE <br />6(3)16d EA. SIDE <br />7SILL PLATE. <br />1. BEAM PER PLAN. <br />2. DBL. TOP PLATE. <br />3. SIMPSON STRAP MSTI36 <br />OR ST6224. <br />4. SIMPSON A34 AT EA. <br />SIDE OF BEAM AND POST <br />PER BEAM CONDITION. <br />5. POST OR MULTI STUD <br />PER PLAN. <br />6. 2X STUD EA. SIDE OF <br />BEAM W/ 16d @ 12" O.C. <br />STAGGERED TO POST. <br />ADD 3-16d EA. SIDE TO BM. <br />7. 2X SILL PLATE. <br />NOTE: <br />- ADD FILLER @ SIDE OF <br />BEAM AS NEEDED. <br />1BEAM PER PLAN. <br />2DBL. TOP PLATE.4SIMPSON (2)A35 @ TOP & BOTT. <br />4SIMPSON (2)A35 @ TOP & BOTT. <br />4SIMPSON (2)A35 @ TOP & BOTT. <br />5POST OR MULTI STUD PER PLAN.WALL~3 <br />7SILL PLATE. <br />COND A: DROP BEAM COND B: TOP FLUSH BEAM <br />COND C: BOTTOM FLUSH BEAM COND D: SIDE FLUSH BEAM <br />111 <br />BEAM POCKET DETAIL <br />4'-0" LAP MIN. <br />1MIN. TWO ROWS 16d, TOTAL (24) 16d @ TYP. PLATE SPLICES OR BREAKS. <br />2SIMPSON STRAP MSTA36. <br />3LOCATE STUD UNDER SPLICE OR PROVIDE 2X BLKG. ATTACHED TO ADJACENT STUD W/ (3) 16d EA. SIDE. <br />3LOCATE STUD UNDER SPLICE OR PROVIDE 2X BLKG. ATTACHED TO ADJACENT STUD W/ (3) 16d EA. SIDE. <br />4PLATE TO STUD NAILING PER C.B.C. MIN REQUIREMENTS. <br />1. MIN. TWO ROWS 16d, TOTAL (24) 16d @ <br />TYP. PLATE SPLICES OR BREAKS. <br />2. SIMPSON STRAP MSTA36. <br />3. LOCATE STUD UNDER SPLICE OR <br />PROVIDE 2X BLKG. ATTACHED TO <br />ADJACENT STUD W/ (3) 16d EA. SIDE. <br />4. PLATE TO STUD NAILING PER C.B.C. MIN <br />REQUIREMENTS. <br />NOTES: <br />- FULLY NAIL STRAP W/ 16d SINKER OR 10d <br />COMMON. <br />- NAIL SHALL BE STAGGERED & AT LEAST 2 <br />1/4" APART. <br />111 <br />TOP PLATE SPLICE TYP. <br />℄ PANEL JOINT. <br />3/8" TYP. <br />℄ PANEL JOINT. <br />3/8" TYP. <br />OFFSET EDGE SUPPORT <br />OFFSET EDGE SUPPORT <br />1ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />1ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />2JOIST.32 x 4 W/ 16d @ 12" O.C. <br />42 x 4 FLAT W/ (2) 10d @ EA. END. <br />1. ROOF SHEATHING AND NAILING <br />PER NAILING SCHDL. <br />2. JOIST. <br />3. 2 x 4 W/ 16d @ 12" O.C. <br />4. 2 x 4 FLAT W/ (2) 10d @ EA. END. <br />111 <br />BLOCKING AT EDGE SUPPORT <br />"W <br />" <br /> <br />M <br />A <br />X <br />. <br />"L" MAX.12" MIN.12" MIN. <br />EQ <br />. <br />EQ <br />. <br />1NOTCH LOCATION.2SIMPSON STRAP "MSTA36" W/ (11) 10d COMMON EA. END (STRAP NOT REQ'D AT SILL PLT.)3BORED HOLE. <br />1. NOTCH LOCATION. <br />2. SIMPSON STRAP "MSTA36" W/ (11) <br />10d COMMON EA. END (STRAP NOT <br />REQ'D AT SILL PLT.) <br />3. BORED HOLE. <br />NOTE: <br />ONLY ONE NOTCH OR HOLE ALLOWED PER <br />EA. STUD. ( EXCLUDING LET-IN BRACES). <br />2-2X TOP PLT. <br />2X OR 3X <br />SILL PLATE. <br />NOTCHES <br />MIN. <br />SPACING <br />BORED <br />HOLES <br />"L" <br />MAX. <br />"W" <br />MAX. <br />2X4 PLATE <br />2X6 PLATE <br />2X8 PLATE <br />6'-0" <br />6'-0" <br />6'-0" <br />3-1/2" <br />5-1/2" <br />5-1/2" <br />1-1/2" <br />2" <br />2" <br />1-1/4" <br />2" <br />3" <br />111 <br />PLATE NOTCHING AND BORING <br />1PANEL BOUNDARY & BOUNDARY NAILING (B.N.) PER PLAN. <br />2FIELD NAILING PER PLAN.3CONTINUOUS PANEL EDGE, NO BLKG', E.N. PER PLAN. <br />1PANEL BOUNDARY & BOUNDARY NAILING (B.N.) PER PLAN. <br />4DISCONTINUOUS PANEL EDGE, E.N. PER PLAN. <br />5FRAMING @ 24" O.C. SHOWN (16" O.C. SIMILAR). <br />6DIRECTION OF FACE GRAIN PERPENDICULAR TO SUPPORT. <br />1. PANEL BOUNDARY & BOUNDARY <br />NAILING (B.N.) PER PLAN. <br />2. FIELD NAILING PER PLAN. <br />3. CONTINUOUS PANEL EDGE, NO <br />BLKG', E.N. PER PLAN. <br />4. DISCONTINUOUS PANEL EDGE, <br />E.N. PER PLAN. <br />5. FRAMING @ 24" O.C. SHOWN (16" <br />O.C. SIMILAR). <br />6. DIRECTION OF FACE GRAIN <br />PERPENDICULAR TO SUPPORT. <br />NOTES: <br />- STAGGER JOINTS AS SHOWN. <br />- MIN. SIZE OF SHEET SHALL BE <br />2 FT. x 2 FT. <br />- NAILS SHALL BE DRIVEN TIGHT <br />BUT SHALL NOT FRACTURE <br />SURFACE OF SHEATHING. <br />- TOLERANCE ON NAILING SHALL BE <br />3/4" W/ THE AVERAGE NAIL <br />SPACING OVER ANY 4 FT. LENGTH <br />BEING AT LEAST THAT NOTED ON <br />THE PLAN. <br />111 <br />PLYWOOD SHEATHING LAYOUT <br />END LE <br />N <br />G <br />T <br />H <br />END LE <br />N <br />G <br />T <br />H <br />1TYPICAL ROOF RAFTER OR TOP CHORD OF TRUSS.2HIP BM. OR TOP CHORD OF HIP TRUSS. <br />3SIMPSON STRAP CS16 W/ 8d SINKER NAIL @ 2-1/16" O.C. CUT TO FIT OVERALL BAYS OF BLK'G WHERE APPLICABLE. <br />42X FLAT BLK'G W/ E.N., SEE PLAN FOR BLK'G LENGTH OR NO. OF BAYS. (MIN. 4 BAYS). <br />END LENGTH <br />5DBL. TOP PLATE OR DROP BM. PER PLAN.WALL~63SIMPSON STRAP CS16 W/ 8d SINKER NAIL @ 2-1/16" O.C. CUT TO FIT OVERALL BAYS OF BLK'G WHERE APPLICABLE. <br />1TYPICAL ROOF RAFTER OR TOP CHORD OF TRUSS. <br />1. TYPICAL ROOF RAFTER OR <br />TOP CHORD OF TRUSS. <br />2. HIP BM. OR TOP CHORD OF <br />HIP TRUSS. <br />3. SIMPSON STRAP CS16 W/ 8d <br />SINKER NAIL @ 2-1/16" O.C. CUT <br />TO FIT OVERALL BAYS OF BLK'G <br />WHERE APPLICABLE. <br />4. 2X FLAT BLK'G W/ E.N., SEE <br />PLAN FOR BLK'G LENGTH OR <br />NO. OF BAYS. (MIN. 4 BAYS). <br />5. DBL. TOP PLATE OR DROP BM. <br />PER PLAN. <br />NOTES: <br />* ADD 2" x 4" x 48" LONG MEMBER <br />TO RECEIVE 2ND CS16 & NAIL W/ <br />16d @ 4" O.C. STAGGERED. <br />STRAP <br />8 <br />9 <br />CS16 <br />(2)CS16 <br />END LENGTH <br />3'-6" <br />3'-6" <br />CAPACITY <br />1700# <br />NAILS/ SPACING <br />8d BOX/ SINKER @ 2-1/16" O.C. <br />3400#8d BOX/ SINKER @ 2-1/16" O.C. <br />111 <br />DRAG DETAIL <br />111 <br />DRAG DETAIL <br />EQ.EQ. <br />1PLYWOOD SHEATHING W/ E.N. (TO EA. JOIST WHEN DBL. FLOOR JOISTS). <br />2FLUSH BEAM PER PLAN.FLOOR~4 <br />3DBL. TOP PLATE. <br />4DROP BEAM PER PLAN.FLOOR~5 <br />5STRAP PER CHART BELOW. <br />6ALT. STRAP LOCATION. <br />7SEE PLAN FOR BEARING CONDITION. <br />1. PLYWOOD SHEATHING W/ <br />E.N. (TO EA. JOIST WHEN <br />DBL. FLOOR JOISTS). <br />2. FLUSH BEAM PER PLAN. <br />3. DBL. TOP PLATE. <br />4. DROP BEAM PER PLAN. <br />5. STRAP PER CHART <br />BELOW. <br />6. ALT. STRAP LOCATION. <br />7. SEE PLAN FOR BEARING <br />CONDITION. <br />STRAP CAPACITYEND LENGTH <br />5 <br />6 <br />CS16 <br />(2)CS16 <br />1700# <br />3400# <br />3'-6" <br />3'-6" <br />7 CMSTC16 4500#3'-6" <br />NAILS/ SPACING <br />8d BOX/ SINKER @ 4-1/8" <br />8d BOX/ SINKER @ 4-1/8" <br />16d SINKER @ 4-1/2" <br />12X ROOF RAFTER PER PLAN.ROOF~2 <br />22X CEILING JOIST PER PLAN.W-2X6~2 <br />32X FULL DEPTH BLK'G @ 48" O.C. BETWEEN RIM & 1ST JOIST. BOUNDARY NAILS TO BLK'G. <br />4DBL. TOP PLATE.W-22X4~ <br />52X STUD WALL PER PLAN.WALL~1 11SHEARWALL PER PLAN.WALL~2 <br />72X SOLE PLATE W/ 16d @ 6" O.C. U.N.O., SEE NAILING PER SHEARWALL SCHDL.WALL~5 <br />8FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~1 <br />6SHEARWALL PER PLAN.WALL~252X STUD WALL PER PLAN.WALL~1 <br />4DBL. TOP PLATE.W-22X4~8FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~1 <br />9ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />1. 2X ROOF RAFTER PER PLAN. <br />2. 2X CEILING JOIST PER PLAN. <br />3. 2X FULL DEPTH BLK'G @ 48" <br />O.C. BETWEEN RIM & 1ST <br />JOIST. BOUNDARY NAILS TO <br />BLK'G. <br />4. DBL. TOP PLATE OR DROP <br />BM. PER PLAN. <br />5. 2X STUD WALL PER PLAN. <br />6. SHEARWALL PER PLAN. <br />7. 2X SOLE PLATE W/ 16d @ 6" <br />O.C. U.N.O., SEE NAILING PER <br />SHEARWALL SCHDL. <br />8. FRAMING CLIP LTP4 PER <br />SHEARWALL SCHDL. <br />@ 48" O.C. MAX. <br />9. ROOF SHEATHING AND <br />NAILING PER NAILING SCHDL. <br />10. BOUNDARY NAILS. <br />11. CONT. PLYWOOD SAME <br />TYPE AS SHEARWALL BELOW. <br />10BOUNDARY NAILS.N-10d~ <br />111 <br />SHEAR TRANSFER <br />111 <br />TYPICAL HEADER DETAIL <br />1HDR. PER PLAN.WALL~4 <br />2(3) 16d COMMON FROM KING STUD TO HEADER, TYP. <br />3SIMPSON A35 @ T&B EA. END OF HEADER AT ALL EXTERIOR WALLS AT OPENINGS WIDER THAN 8'-0" <br />4SIMPSON LTP4 ALT. TO A35. INSTALL EA. SIDE OF HEADER. <br />5(2) 16d @ 2X4 WALL, (3) 16d @ 2X6 & 2X8 WALL. <br />1. HDR. PER PLAN. <br />2. (3) 16d COMMON FROM KING STUD TO HEADER, TYP. <br />3. SIMPSON A35 @ T&B EA. END OF HEADER AT ALL EXTERIOR <br />WALLS AT OPENINGS WIDER THAN 8'-0" <br />4. SIMPSON LTP4 ALT. TO A35. INSTALL EA. SIDE OF HEADER. <br />5. (2) 16d @ 2X4 WALL, (3) 16d @ 2X6 & 2X8 WALL. <br />6. 2X TRIMMER U.N.O. PER PLAN. <br />6DECKING PER PLAN.FLOOR~2 <br />12X ROOF RAFTER PER PLAN.ROOF~2 <br />2ROOF SHEATHING W/ CALIFORNIA FRAMING.ROOF~8 3BOUNDARY NAILS.N-8d~42X CONT. PLATE W/ (2) 16d @ EA. TRUSS OR R.R. <br />52X FLAT BLOCKING. <br />6CONT. ROOF SHEATHING UNDER CALIFORNIA FRAMING AND NAILING PER NAILING SCHDL. <br />1. 2X ROOF RAFTER PER PLAN. <br />2. ROOF SHEATHING W/ CALIFORNIA FRAMING. <br />3. BOUNDARY NAILS. <br />4. 2X CONT. PLATE W/ (2) 16d @ EA. TRUSS OR R.R. <br />5. 2X FLAT BLOCKING. <br />6. CONT. ROOF SHEATHING UNDER CALIFORNIA <br />FRAMING AND NAILING PER NAILING SCHDL. <br />111 <br />CONNECTION DETAIL <br />12X ROOF RAFTER PER PLAN.ROOF~2 <br />12X ROOF RAFTER PER PLAN.ROOF~2 <br />22X CEILING JOIST PER PLAN.ROOF~3 22X CEILING JOIST PER PLAN.ROOF~3 <br />3ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />4CEILING BEAM PER PLAN.ROOF~14 5SIMPSON APPROVED HANGER PER PLAN.H-HU46_L~1 <br />6DBL. TOP PLATE.W-22X4~7FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~1 <br />8SHEARWALL PER PLAN.WALL~2 <br />92X SOLE PLATE W/ 16d @ 6" O.C. U.N.O., SEE NAILING PER SHEARWALL SCHDL.WALL~5 <br />10BOUNDARY NAILS.N-10d~ <br />10BOUNDARY NAILS.N-10d~ <br />10BOUNDARY NAILS.N-10d~ <br />112X BEVELED BLK'G.ROOF~4 <br />12ROOF SHEATHING W/ CALIFORNIA FRAMING.ROOF~8 <br />1. 2X ROOF RAFTER PER PLAN. <br />2. 2X CEILING JOIST PER PLAN. <br />3. ROOF SHEATHING AND <br />NAILING PER NAILING SCHDL. <br />4. CEILING BEAM PER PLAN. <br />5. SIMPSON APPROVED <br />HANGER PER PLAN. <br />6. DBL. TOP PLATE OVER <br />2X4 @ 16" O.C. STUD WALL. <br />7. FRAMING CLIP LTP4 PER <br />SHEARWALL SCHDL. <br />@ 48" O.C. MAX. <br />8. PLYWOOD TYPE "A". <br />9. 2X SOLE PLATE W/ 16d @ 6" <br />O.C. U.N.O., SEE NAILING PER <br />SHEARWALL SCHDL. <br />10. BOUNDARY NAILS. <br />11. 2X BEVELED BLK'G. <br />W/ 2-16d @ 6" O.C. TO BM. <br />12. ROOF SHEATHING <br />W/ 2X R.R. PER CALIFORNIA <br />FRAMING. <br />3ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />111 <br />SHEAR TRANSFER <br />12X ROOF RAFTER PER PLAN.ROOF~2 <br />22X CEILING JOIST PER PLAN.ROOF~322X CEILING JOIST PER PLAN.ROOF~3 <br />3DBL. TOP PLATE.W-22X4~ <br />42X SOLE PLATE W/ 16d @ 6" O.C. U.N.O., SEE NAILING PER SHEARWALL SCHDL.WALL~5 <br />3DBL. TOP PLATE.W-22X4~ <br />52X STUD WALL PER PLAN.WALL~16SHEARWALL PER PLAN.WALL~2 <br />7ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />7ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />8ROOF SHEATHING W/ CALIFORNIA FRAMING.ROOF~8 <br />6SHEARWALL PER PLAN.WALL~2 <br />9BOUNDARY NAILS.N-10d~ <br />10FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~1 <br />10FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~19BOUNDARY NAILS.N-10d~ <br />9BOUNDARY NAILS.N-10d~ <br />1. 2X ROOF RAFTER PER PLAN. <br />2. 2X CEILING JOIST PER PLAN. <br />3. DBL. TOP PLATE OR DROP <br />BM. PER PLAN. <br />4. 2X SOLE PLATE W/ 16d <br />@ 6" O.C. U.N.O., SEE NAILING <br />PER SHEARWALL SCHDL. <br />5. 2X STUD WALL PER PLAN. <br />6. SHEARWALL PER PLAN. <br />7. ROOF SHEATHING AND <br />NAILING PER NAILING SCHDL. <br />8. ROOF SHEATHING <br />W/ 2X R.R. PER CALIFORNIA <br />FRAMING. <br />9. BOUNDARY NAILS. <br />10. FRAMING CLIP LTP4/ A35 <br />PER SHEARWALL SCHDL. <br />@ 48" O.C. MAX. <br />12X ROOF RAFTER PER PLAN.ROOF~2 <br />111 <br />SHEAR TRANSFER <br />1RIDGE PER PLAN.ROOF~1522X ROOF RAFTER PER PLAN.ROOF~2 <br />3ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />4A35 @ EA. RAFTER <br />5SIMPSON STRAP LSTA30 @ 32" O.C.6EDGE NAILING.MISC~3 <br />1. RIDGE PER PLAN. <br />2. 2X ROOF RAFTER PER PLAN. <br />3. ROOF SHEATHING AND NAILING PER NAILING SCHDL. <br />4. A35 @ EA. RAFTER <br />5. SIMPSON STRAP LSTA30 @ 32" O.C. <br />6. EDGE NAILING. <br />111 <br />CONNECTION DETAIL <br />EQ.EQ. <br />1DBL. TOP PLATE.WALL~8 <br />2SHEARWALL PER PLAN.WALL~2 <br />3EDGE NAILING.MISC~3 <br />44X POST PER PLAN.5HDR. PER PLAN.WALL~4 <br />64X BLOCKING W/ EN. <br />7SIMPSON STRAP, SEE TABLE BELOW. <br />8PLYWOOD ABOVE HDR. (MATCH ADJ. SHEAR WALL). <br />92X TRIM, U.N.O. <br />1. DBL. TOP PLATE. <br />2. SHEAR PANEL PER <br />PLAN. <br />3. EDGE NAILING. <br />4. 4X POST PER PLAN. <br />5. HDR. PER PLAN. <br />6. 4X BLOCKING W/ EN. <br />7. SIMPSON STRAP, <br />SEE TABLE BELOW. <br />8. PLYWOOD ABOVE <br />HDR. (MATCH ADJ. <br />SHEAR WALL). <br />9. TRIMMER, U.N.O. <br />TYPE <br />(1)CS16 <br />STUD/ <br />POST. MINSTRAP MIN. <br />END LENGTH CAPACITY <br />(2)CS16 <br />(3)CS16 <br />A <br />B <br />C <br />2X4 <br />2-2X4 <br />4X6 <br />NAILING/ SPACING <br />(18) 10d <br />(18) 10d PER STRAP <br />(18) 10d PER STRAP <br />18" <br />18" <br />18" <br />1700# <br />3400# <br />5100# <br />111 <br />SHEAR PANEL AT OPENING <br />1SEE PLAN FOR HOLDOWN/ STRAP.1SEE PLAN FOR HOLDOWN/ STRAP. <br />1SEE PLAN FOR HOLDOWN/ STRAP.1SEE PLAN FOR HOLDOWN/ STRAP. <br />22 x 4 STUD (U.N.O.) <br />22 x 4 STUD (U.N.O.)22 x 4 STUD (U.N.O.) <br />22 x 4 STUD (U.N.O.) <br />3SHEARWALL PER PLAN.WALL~2 <br />3SHEARWALL PER PLAN.WALL~2 3SHEARWALL PER PLAN.WALL~2 <br />3SHEARWALL PER PLAN.WALL~2 <br />4EDGE NAILING.MISC~3 <br />4EDGE NAILING.MISC~34EDGE NAILING.MISC~3 <br />4EDGE NAILING.MISC~3 <br />4EDGE NAILING.MISC~3 <br />4EDGE NAILING.MISC~3 <br />516d @ 3" O.C. STAGGERED. <br />516d @ 3" O.C. STAGGERED. <br />COND: "A"COND: "C" <br />COND: "B"COND: "D" <br />1. SEE PLAN FOR SHEAR WALL <br />HOLDOWN/ STRAP. <br />2. 2X STUD (U.N.O.) <br />3. SHEARWALL PER PLAN. <br />4. BOUNDARY NAILS. <br />5. 16d @ 3" O.C. STAGGERED. <br />111 <br />SHEARWALL/WALL INTERSECTION <br />111 <br />SHEAR TRANSFER <br />12X STUD PER PLAN.Wall~1 <br />22X ROOF RAFTER PER PLAN.Roof~2 <br />32X CEILING JOIST PER PLAN.Roof~3 <br />4ROOF SHEATHING AND NAILING PER NAILING SCHDL.Roof~1 <br />6SHEARWALL PER PLAN.Wall~2 <br />7FRAMING CLIP A35 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-A35_L~1 <br />8BOUNDARY NAILS.N-10d~ <br />8BOUNDARY NAILS.N-8d~ <br />1. (E) 2X STUD WALL. <br />2. (E) 2X ROOF RAFTER PER PLAN. <br />3. (N) 2X CEILING JOIST WHERE OCCURED. <br />4. (E) ROOF SHEATHING. <br />5. (E) DBL. TOP PLATE OR DROP BM PER PLAN. <br />6. (N) SHEARWALL WHERE OCCURRED. <br />7. (N) FRAMING CLIP A35 PER SHEARWALL <br />SCHDL. @ 48" O.C. MAX. <br />8. BOUNDARY NAILS. <br />9. (N) 6-16d COMMON NAILS @ EA. RAFTER AND <br />(N) CEILING JOIST. <br />5DBL. TOP PLATE OR DROP BM. PER PLAN.WALL~6 <br />96-16d COMMON NAILS @ EA. RAFTER AND CEILING JOIST.ROOF~11 <br />2X <br /> <br />R <br />. <br />R <br />. <br /> <br />W <br />/ <br /> <br />E <br />N <br />(E <br />) <br /> <br />2 <br />X <br /> <br />R <br />. <br />R <br />. <br />(E <br />) <br /> <br />2 <br />X <br /> <br />R <br />. <br />R <br />. <br />SECTION A - A <br />PLAN VIEW <br />1(E) ROOF SHEATHING <br />111 <br />CONNECTION DETAIL <br />2BOUNDARY NAILS.N-8d~ <br />3(N) 2X R.R. W/ EN PER PLAN4(E) 2X ROOF RAFTER PER PLAN.5(E) 2X CEILING JOIST PER PLAN. <br />1(E) ROOF SHEATHING <br />4(E) 2X ROOF RAFTER PER PLAN. <br />4(E) 2X ROOF RAFTER PER PLAN. <br />3(N) 2X R.R. W/ EN PER PLAN <br />1. (E) ROOF SHEATHING <br />2. EDGE NAILING. <br />3. (N) 2X R.R. W/ EN PER <br />PLAN <br />4. (E) 2X ROOF RAFTER TO <br />BE REMAINED <br />5. (E) 2X CEILING JOIST TO <br />BE REMAINED. <br />16"16" <br />1 <br />2102 N Wright St & #2 - <br />101117955-566/13/2024