Laserfiche WebLink
Dong Engineering Inc. <br />ADDITION-ADU <br />2102 N.WRIGHT ST, SANTA ANA, CA 92705 <br />Job#: 230520 <br />Date: 11/28/2023 <br />PLAN: 1 <br />CODE: CBC 2022 <br />Shear Wall (X-X Direction) <br />Line Story Section Span Wind Seismic Added V (lb)H L v Type <br />###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf) <br />A 1 1X 10.5 79 32 8 8 52 A <br />B 1 1X 10.5 79 32 1634 1692 8 6.25 328 B <br />C 1 3X 17.5 79 36 8 4 174 A <br />D 1 3X 17.5 79 36 8 7.52 92 A <br />SUMMARY SHEAR WALL <br />V2 = Seismic*Span/2 + Added Vseismic <br />Line shear V = Maximum(V1;V2) <br />V1 = Wind*Span/2 + Added Vwind <br />v(plf) = V/L <br />20 of 25 <br />2102 N Wright St & #2 - <br />101117955-566/13/2024