Laserfiche WebLink
Dong Engineering Inc. <br />ADDITION-ADU <br />2102 N.WRIGHT ST, SANTA ANA, CA 92705 <br />Job#: 230520 <br />Date: 11/28/2023 <br />PLAN: 1 <br />CODE: CBC 2022 <br />1500 psf <br />Trib Trib Wall Height <br />DL(psf)LL(psf)roof(ft)DL(psf)LL(psf)floor(ft)DL(psf)wall(ft) <br />15 20 7 15 8 <br />Roof:(DL+LL)(Trib) =245 plf <br />Floor:(DL+LL)(Trib) =0 plf <br />Wall:DL (Height)=120 plf <br />365 plf <br />365 /(12"/12)=365 psf< 1500 psf <br /> <br />P(allowable) <br />P(allowable) = 4,500 # <br />18 in <br />FOUNDATION - 1-STORY <br />Allowable soil bearing value: <br />Roof Floor <br />use 12" wide cont. ftg w/ 2-#4 top & bott. <br />45𝑜 <br />25 of 25 <br />2102 N Wright St & #2 - <br />101117955-566/13/2024