My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2142 N Spruce St - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Spruce St
>
2142 N Spruce St
>
2142 N Spruce St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:01:51 PM
Creation date
6/1/2025 12:01:36 PM
Metadata
Fields
Template:
Plan
Permit Number
20182078
101118231
Full Address
2142 N Spruce St
Document Relationships
101118231 - Permit
(Permit - Plan)
Path:
\Building\Permits\S\Spruce St\2142 N Spruce St
20182078 - Permit
(Permit - Plan)
Path:
\Building\Permits\S\Spruce St\2142 N Spruce St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
McPherson Engineering By: T.B. <br />Date: 10/11/23 <br />Project Info 3 <br />Gravity Loads 4 <br />Lateral Loads 5 <br />Wind Uplift Design 6 <br />Summary 7 <br />Table Of Contents <br />*Note: This engineering report is limited to the information presented to Engineer via plans, site <br />information, photos, and written correspondence as provided by Client. On-site structural <br />observations and verification of site conditions are not included herein. Engineering for <br />manufactured products such as photovoltaic modules or racking systems is excluded from this <br />report. Please refer to the manufacturer's specifications, certifications, and pre-engineered <br />packages for product engineering. Installations of solar modules and related equipment must be <br />performed in accordance with manufacturer recommendations, local codes, local regulations, <br />industry best practices, and applicable safety standards. Owner and/or Contractor shall notify <br />Engineer should any damage, deterioration, or descrepancies between current condition of the <br />structure or otherwise as this letter describes before proceding with construction. This letter <br />applies only to regions of the structure where solar modules will be supported and the <br />supporting elements. <br />10/11/2023 12:22 PM <br />2 of 7 <br />©McPherson Engineering <br />2142 N Spruce St - <br />201820782/22/2024
The URL can be used to link to this page
Your browser does not support the video tag.