My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2210 3%4 N Grand Ave WCC02 - Plan
PBA
>
Building
>
ProjectDox
>
G
>
Grand Ave
>
2210 3/4 N Grand Ave Unit# WCC02
>
2210 3%4 N Grand Ave WCC02 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:01:54 PM
Creation date
6/1/2025 12:01:42 PM
Metadata
Fields
Template:
Plan
Permit Number
101112685
Full Address
2210 3/4 N Grand Ave Unit# WCC02
Document Relationships
101112685 - Permit
(Permit - Plan)
Path:
\Building\Permits\G\Grand Ave\2210 3/4 N Grand Ave Unit# WCC02
Text box
ID:
1
Creator:
Import Agent
Created:
6/1/2025 12:01 PM
Modified:
5/30/2025 3:18 PM
Text:
mailto:structural@infinigy.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date: April 4, 2023 <br />Subject:Mount Analysis Report <br />Carrier Designation:DISH Network 5G <br />Carrier Site Number: <br />Carrier Site Name: <br />Crown Castle Designation:Crown Castle BU Number: <br />Crown Castle Site Name: <br />Crown Castle JDE Job Number: <br />Crown Castle Order Number: <br />Engineering Firm Designation:Infinigy Report Designation: <br />Infinigy <br />500 West Office Center Drive, Suite 150 <br />Fort Washington, PA 19034 <br />(518) 690-0790 <br />structural@infinigy.com <br />LSSNA01039A <br />CA-CCI-T-825183 <br />825183 <br />LA3642 SCE LaVeta Sub CS <br />663609 <br />564887 Rev.3 <br />1039-Z0001-B <br />Site Data:2210 ¾ N. Grand Avenue #WCC02, Santa Ana, Orange County, CA, 92705 <br />Latitude 33°45’59.26” Longitude -117°51’7.80” <br />Structure Information:Tower Height & Type:59.0 ft Monopole <br />Mount Elevation:45.0 ft <br />Mount Type:7.0 ft T-Arm <br />Infinigy is pleased to submit this “Mount Analysis Report” to determine the structural integrity of DISH Network’s antenna <br />mounting system with the proposed appurtenance and equipment addition on the abovementioned supporting tower <br />structure. Analysis of the existing supporting tower structure is to be completed by others and therefore is not part of this <br />analysis. Analysis of the antenna mounting system as a tie-off point for fall protection or rigging is not part of this document. <br />The purpose of the analysis is to determine acceptability of the mount stress level. Based on our analysis we have <br />determined the mount stress level to be: <br />T-Arm Sufficient <br />*See Section 4.1 of this report for the loading and structural modifications required in order for the mount to <br />support the loading listed in Table 1. <br />This analysis utilizes an ultimate 3-second gust wind speed of 95 mph as required by the 2022 California Building Code. <br />Applicable Standard references and design criteria are listed in Section 2 - Analysis Criteria. <br />Mount analysis prepared by: Hector Rodriguez <br />Respectfully Submitted by: Emmanuel Poulin, P.E. <br />structural@infinigy.com <br />4/4/23 <br />Exp. 6/30/24 <br />2210 3-4 N Grand <br />WCC02 - <br />10111268508/01/23
The URL can be used to link to this page
Your browser does not support the video tag.