My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2314 W San Lorenzo Ave - Plan
PBA
>
Building
>
ProjectDox
>
S
>
San Lorenzo Ave
>
2314 W San Lorenzo Ave
>
2314 W San Lorenzo Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:02:16 PM
Creation date
6/1/2025 12:01:46 PM
Metadata
Fields
Template:
Plan
Permit Number
20181463
101117407
Full Address
2314 W San Lorenzo Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
When attaching the rack, follow directions <br />of the racking and module manufacturers. <br />All written instructions from the roofi ng <br />manufacturer must be followed by anyone <br />modifying a roof system. Consult the roof <br />manufacturer's specs and instructions prior <br />to touching the roof. These instructions <br />apply to shakes with solid sheathing and <br />interlaid felt, the most common type. If <br />your shake roof varies, consult the 'New <br />Roof Construction Manual' from the Cedar <br />Shake & Shingle Bureau. <br />Set mount aside. Using drill with 7/32" bit, drill <br />pilot hole into roof and center of rafter, taking care <br />to drill square to the roof. Do not use mount as a <br />drill guide. <br />Clean off any sawdust, and fi ll hole with sealant <br />compatible with roofi ng materials. <br />Slide mount into position. Prepare hanger bolt <br />with 1 hex nut (item 5) and 1 sealing washer (item <br />9). Insert bolt into QBlock hole and drive into rafter, <br />tightening until the QBlock no longer swivels easily. <br />Insert EPDM rubber washer (item 6) over hanger <br />bolt into QBlock. <br />2 3 <br />54 6 <br />87 <br />1 <br />Jan-2017, Rev 5 <br />925-478-8269 | www.quickmountpv.com | info@quickmountpv.com <br />2700 Mitchell Dr. | Walnut Creek, CA 94598 <br />Classic Shake Mounting Instructions <br />Installation Tools Required: tape measure, roofi ng bar, chalk line, stud fi nder, caulking gun, sealant compatible with roofi ng materials, <br />drill with 7/32" bit, drill or impact gun with 1/2" deep socket, grinder or sander <br />Locate, choose, and mark centers of rafters to be <br />mounted. Select the courses of roofi ng where <br />Quick Mounts will be placed. <br />If necessary, remove shakes directly above mount <br />with the roofi ng bar to expose felt paper. Flashing <br />should reach at least 1 inch up and under the felt <br />paper for proper waterproofi ng. <br />Level out any high spots beneath the fl ashing area <br />with a grinder or sander. Slide mount into desired <br />position on shakes, under felt paper, and mark <br />center for drilling with a pen or pencil.* <br />Using the rack kit hardware, secure the rack of your <br />choice. <br />BI 7.2.3-11 <br />WARNING: Quick Mount PV products are NOT designed for and should NOT be used to anchor fall protection equipment. <br />If the fl ashing doesn't reach under the felt paper <br />above, cut an extra piece of felt to layer under the <br />existing felt and over the fl ashing. <br />* <br />2314 W San Lorenzo <br />Ave11/17/2023
The URL can be used to link to this page
Your browser does not support the video tag.