My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2115 N Greenbrier St - Plan
PBA
>
Building
>
ProjectDox
>
G
>
Greenbrier St
>
2115 N Greenbrier St
>
2115 N Greenbrier St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:02:01 PM
Creation date
6/1/2025 12:01:47 PM
Metadata
Fields
Template:
Plan
Permit Number
20179404
101114794
Full Address
2115 N Greenbrier St
Document Relationships
101114794 - Permit
(Permit - Plan)
Path:
\Building\Permits\G\Greenbrier St\2115 N Greenbrier St
20179404 - Permit
(Permit - Plan)
Path:
\Building\Permits\G\Greenbrier St\2115 N Greenbrier St
Text box
ID:
1
Creator:
Import Agent
Created:
6/1/2025 12:01 PM
Modified:
5/30/2025 3:02 PM
Text:
http://www.santa-ana.org
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Rev: 7/15/2021 <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />SOL-01 CBC 2019 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. <br />Project Address: <br />Contractor Company Name: <br />Contractor License Number: <br /> YES NO Are the following applicable to the proposed project? <br />1.Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />2.Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />3.Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />4.Will the PV system weigh maximum 4 pounds per square feet or less? <br />5.Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />6.Will the PV system be installed with a space of 2” minimum to 10” maximum between <br />the underside of modules and the surface of the roof? <br />7.Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />8.Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />9.Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />10.Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer’s PV support information.) <br />I certify under penalty of perjury under the laws of the State of California that the above is true: <br />Print Name: Signature: <br />Phone Number: Date: <br />Email Address: <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M -19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />NEXT DOOR HOME CONSTRUCTION <br />1054136 <br />2115 N Greenbrier St., Santa Ana, CA 92706 <br />SANDRA VENTOSA <br />818-670-1071 <br />ADMIN@NEXTDOORSOLAR.COM <br />4/4/23 <br />2115 N Greenbrier <br />St05/31/23
The URL can be used to link to this page
Your browser does not support the video tag.