Laserfiche WebLink
1.1.PROJECT NOTES: <br />1.2.THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE NATIONAL <br />ELECTRICAL CODE (NEC) ARTICLE 690, ALL MANUFACTURERS’S LISTING AND <br />INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED <br />BY THE AUTHORITY HAVING JURISDICTION’S (AHJ) APPLICABLE CODES. <br />1.3.THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND <br />PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION <br />1.4.GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS <br />INTEGRATED WITH THE MICROINVERTER IN ACCORDANCE WITH NEC <br />690.5(A) <br />1.5.ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE <br />INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND <br />LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY NEC 690.4 <br />& NEC 690.60: PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 <br />CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 <br />COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY <br />1.6.MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP <br />COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE CALCULATED <br />ACCORDING TO NEC 690.7. <br />1.7.ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AND <br />SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC <br />POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION <br />PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS <br />FROM LISTING OR LABELING [NEC 110.3]. <br />1.8.ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING <br />CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL <br />PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE NEC <br />AND AHJ. <br />1.9.SCOPE OF WORK: <br />1.10.PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND <br />SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. <br />PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING <br />ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE <br />EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS <br />DETAILED IN THIS DOCUMENT. <br />1.11.WORK INCLUDES: <br />1.12.PV ROOF ATTACHMENTS - UNIRAC FLASHKIT PRO FOR ASPHALT COMP <br />SHINGLE ROOF <br />1.13.PV RACKING SYSTEM INSTALLATION - UNIRAC SM ROOF MOUNT <br />RACKING HARDWARE <br />1.14.PV MODULE AND INVERTER INSTALLATION - CANADIAN SOLAR CS6R- <br />400MS-HL [BLK] (400W) SOLAR MODULES / ENPHASE IQ8PLUS-72-2-US [240V] <br />MICROINVERTERS <br />1.15.PV EQUIPMENT GROUNDING <br />1.16.PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX <br />1.17.PV LOAD CENTERS (IF INCLUDED) <br />1.18.PV METERING/MONITORING (IF INCLUDED) <br />1.19.PV DISCONNECTS <br />1.20.PV GROUNDING ELECTRODE & BONDING TO (E) GEC <br />1.21.PV FINAL COMMISSIONING <br />1.22.(E) ELECTRICAL EQUIPMENT RETROFIT FOR PV <br />1.23.SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE <br />1.24.SITE NOTES: <br />1.25.A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA <br />REGULATIONS. <br />1.26.THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS <br />SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE <br />BATTERIES. <br />1.27.THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, <br />MECHANICAL, OR BUILDING ROOF VENTS. <br />1.28.PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND <br />PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION <br />NEC 110.26. <br />1.29.ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN <br />ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S <br />INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT <br />THE BUILDING OR STRUCTURE.SHEET <br />CONTRACTOR <br />ILUM SOLAR <br /> 2329 FAIRMONT AVE, <br /> SANTA ANA, <br /> CA 92706 <br /> APN:00310010 <br /> DATE:12/30/2023 <br />WATERSON <br />RESIDENCE <br />License#:1092865, C-46 <br />ADDRESS: <br />4135 NORTHGATE BLVD <br />SUITE 9, SACRAMENTO, <br />CA 95834, USA <br />DESIGNER: OHD <br />T-2 <br />1.56.EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS <br />SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE <br />AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE <br />INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE <br />MANUFACTURERS' INSTALLATION REQUIREMENTS. <br />1.57.THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH <br />THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING <br />CONDUCTOR TO ANOTHER MODULE. <br />1.58.GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE <br />COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [2022 CEC <br />250.119] <br />1.59.THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH CEC 690.47 AND <br />CEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR <br />INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO <br />CEC 250, CEC 690.47 AND AHJ. <br />1.60.GROUND-FAULT DETECTION SHALL COMPLY WITH CEC 690.41 IN GENERAL <br />AND CEC 690.41 (A)(1) SPECIFICALLY. <br />1.61.DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: <br />1.62.DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE <br />SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE <br />CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE <br />UPPER TERMINALS). <br />1.63.DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE <br />LOCKABLE, AND BE A VISIBLE-BREAK SWITCH <br />1.64.RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 1 FT OF PV <br />ARRAY OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS. CONTROLLED <br />CONDUCTORS ≤30V AND ≤240VA [CEC 690.12(B)]. LOCATION OF LABEL <br />ACCORDING TO AHJ <br />1.65.ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO CEC 690.8, <br />690.9, AND 240. <br />1.66.EQUIPMENT THAT IS LISTED, LABELED, OR BOTH SHALL BE INSTALLED AND <br />USED IN ACCORDANCE WITH ANY INSTRUCTIONS INCLUDED IN THE LISTING <br />OR LABELING. CEC 110.3(B). <br />1.67.IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT <br />PROTECTION ACCORDING TO CEC 690.11 AND UL1699B. <br />1.68.ELECTRICAL INTERCONNECTION NOTES: <br />1.69.THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS OUTPUT MAY <br />NOT EXCEED 120% OF THE BUSBAR RATING. <br />1.70.WHEN THE SUM OF THE PV SOURCES EQUALS >100% OF THE BUSBAR <br />RATING, PV DEDICATED BACKFEED BREAKERS MUST BE LOCATED OPPOSITE <br />END OF THE BUS FROM THE UTILITY SOURCE OCPD. <br />1.71.AT MULTIPLE PV OUTPUT COMBINER PANEL, THE TOTAL RATING OF ALL <br />OVERCURRENT DEVICES SHALL NOT EXCEED THE AMPACITY OF THE <br />BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE <br />EXCLUDED. <br />1.72.SUPPLY-SIDE TAP INTERCONNECTION SHOULD BE WITH SERVICE ENTRANCE <br />CONDUCTORS. <br />1.73.BACKFEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS <br />EXEMPT FROM ADDITIONAL FASTENING. <br />1.30.EQUIPMENT LOCATIONS: <br />1.31.ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY 2022 CEC <br />110.26. <br />1.32.WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR <br />EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY 2022 CEC 690.31 (A),(C) <br />AND CEC TABLES 310.15 (B)(2)(A) AND 310.15 (B)(3)(C) <br />1.33.JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES <br />ACCORDING TO 2022 CEC 690.34. <br />1.34.ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE <br />INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT . <br />1.35.ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED <br />PERSONNEL ACCORDING TO 2022 CEC APPLICABLE CODES. <br />1.36.ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR <br />OUTDOOR USAGE WHEN APPROPRIATE. <br />1.37.STRUCTURAL NOTES: <br />1.38.RACKING SYSTEM <br />1.39.PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT <br />INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN <br />MODULES, AND RAILS MUST ALSO EXTEND <br />1.40.A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, <br />ACCORDING TO RAIL MANUFACTURER’S INSTRUCTIONS. <br />1.41.JUNCTION BOX WILL BE INSTALLED PER MANUFACTURER'S <br />SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED SEALED <br />PER LOCAL REQUIREMENTS. <br />1.42.ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND <br />SEALED WITH APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED <br />CONTRACTOR. <br />1.43.ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN <br />THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. <br />1.44.WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE <br />STAGGERED AMONGST THE ROOF FRAMING MEMBERS. <br />1.45.WIRING & CONDUIT NOTES: <br />1.46.ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR <br />PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM <br />CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. <br />1.47.CONDUCTORS SIZED ACCORDING TO 2022 CEC 690.8, 2022 CEC 690.7. <br />1.48.VOLTAGE DROP LIMITED TO 2%. <br />1.49.DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING <br />SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY WITH <br />SUITABLE WIRING CLIPS. <br />1.50.AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- <br />BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE <br />PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION <br />NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CON2022 CECTED SYSTEMS THE <br />PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [2022 CEC 110.15 <br />1.51.GROUNDING NOTES: <br />1.52.GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR <br />PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL <br />BE RATED FOR SUCH USE. <br />1.53.PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO 2022 CEC 690.43 AND <br />MINIMUM 2022 CEC TABLE 250.122. <br />1.54.METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES <br />CONSIDERED GROUNDED IN ACCORDING WITH 2022 CEC 250.134 AND 2022 <br />250.136(A). <br />1.55.EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO <br />CEC 690.45 AND MICROINVERTER MANUFACTURER'S INSTRUCTIONS. <br />2329 N Fairmont Ave - <br />201821764/3/2024