Laserfiche WebLink
3e: MATERIAL SPECIFICATIONS: <br />C1 sheet has been included and updated. <br /> 1) Included under Material Specifications on C1 Sheet. <br /> 2) Included on E1 Sheet and under Sheet Index on C1 Sheet. <br /> 6. A1: FLOOR PLAN/ REFLECTED CEILING PLAN <br /> 6b. Listed under Material Specifications on C1 & listed as details on D4. C1 <br />sheet has been included and updated. <br /> <br /> 7. A2: ROOF/BEAM PLAN <br /> 7a. Provided detail on Sheet D5. <br /> <br /> 8. S1.0: EXISING SITE PLAN <br /> 8c. Project address has been clarified. <br /> 8d. See sheet S1.0 for the added site plan note; which calls out section 11B- <br />206.2.1 exception #2 where it says that an accessible route (from the public street <br />or sidewalk) shall not be required between site arrival points and the building or <br />facility entrance if only the means of access between them is a vehicular way not <br />providing pedestrian access. <br /> <br /> <br /> 9. D1: WALL PANEL DETAILS <br /> 9A. Detail 4: <br /> 1) Specified in Detail 4 on Sheet D1 <br /> 3) Structural calculation page 24 column analysis are for columns <br />connected to wide flange beams. Please see detail 1 and detail 2 on D5 Sheet. <br /> <br /> 10. Updated detail callout in Detail 1 on Sheet D2 as specified. <br /> <br /> 12. Structural Calculations <br /> 12a. C1 Sheet has been updated and noted. <br /> <br />Page 3 of 68 <br />2331 S Pullman St <br />2/18/2025