Laserfiche WebLink
McPherson Engineering By: L.Z. <br />Date: 10/7/22 <br />Gravity Loads: <br />DEMAND DECREASED BY 24.85% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 7.% < 10% = OK! <br />Anchorage: <br />DEMAND OF 367.7LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />10/7/2022 3:46 PM <br />7 of 7 <br />©McPherson Engineering <br />2229 Cypress Ave <br />- <br />101112580-201778 <br />10 <br />11/04/22