My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2110 N Eastwood Ave - Plan
PBA
>
Building
>
ProjectDox
>
E
>
Eastwood Ave
>
2110 N Eastwood Ave
>
2110 N Eastwood Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:02:33 PM
Creation date
6/1/2025 12:02:02 PM
Metadata
Fields
Template:
Plan
Permit Number
20179059
101114315
101114459
Full Address
2110 N Eastwood Ave
Document Relationships
101114315 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Eastwood Ave\2110 N Eastwood Ave
101114459 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Eastwood Ave\2110 N Eastwood Ave
20179059 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Eastwood Ave\2110 N Eastwood Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INVMM <br />BETTER EARTH ELECTRIC INC. <br />16720 MARQUARDT AVE CERRITOS <br />CERRITOS, CA 90703 <br />PHONE #: (888) 373-9379 <br />LIC #: C10-1024460 <br />SITE PLAN <br />N <br />(E) 100A MAIN SERVICE PANEL <br />(N) SOLAREDGE 3800H-US <br />Non-RGM INVERTER <br />ROOF ACCESS POINT <br />PER CRC 2022 (R324.7.1) <br />ARRAY 1 - <br />(N) 12 Hanwha Q CELLS <br />MODULES <br />TILT: 18° <br />AZIMUTH: 180° <br />P3 <br />Nathan Draeger <br />DESIGNER: <br />DESIGN MGR: <br />Tino Marufu <br />NEW PV SYSTEM: 4,800 DC / 3800 AC <br />Carlos Quezada <br />2110 N Eastwood Ave, Santa Ana, CA 92705 <br />APN: 39617216 <br />3/23/2023 <br />DATE:TIME: <br />03:27 pm <br />REVISION:DATE:DESCRIPTION: <br />DRAWING TITLE: <br />DRAWING PAGE: <br />SCALE: <br />21 <br />1 <br />0 <br /> <br />N <br /> <br />E <br />A <br />S <br />T <br />W <br />O <br />O <br />D <br /> <br />A <br />V <br />E <br />, <br /> S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br />92 <br />7 <br />0 <br />5 <br /> 1/ 16" = 1' <br />JURISDICTION STAMPS: <br /> FIRE CODE PATHWAY <br />BACKUP INTERFACE <br />BACKUP GATEWAYBG <br />BI <br />MODULE STRINGING <br />3 <br />4" EMT CONDUIT <br />OPTIMIZER <br />JB JUNCTION BOX <br />LEGEND CALLOUTS: <br />1 1 <br />4" PVC TRENCH <br />COMBO METER/MAINMM <br />UTILITY METERUM <br />MAIN SERVICE PANEL <br />PV METER <br />MSP <br />PV <br />INVERTER <br />SUB PANEL <br />INV <br />SUB <br />AC DISCONNECT <br />AC COMBINER PANELACL <br />AC <br />EV CHARGER <br />BATTERY BACKUP <br />EV <br />BB <br />(E) DRIVEWAY <br />(E) PROPERTY LINE <br />1 <br />3'-0" <br />3' <br />- <br />0 <br />" <br />1 03.23.23 AS-BUILT CORRECTIONS <br />2110 N Eastwood <br />Ave03/29/23
The URL can be used to link to this page
Your browser does not support the video tag.