Laserfiche WebLink
McPherson Engineering By: F.A. <br />Date: 3/16/23 <br />Gravity Loads: <br />DEMAND DECREASED BY 12.6% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 1.53% < 10% = OK! <br />Anchorage: <br />DEMAND OF 635.8LB. < CAPACITY OF 1702.4LB. = OK! <br />USE (2) 5/16IN. DIA. LAG SCREW(S) AT 8FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />3/16/2023 2:27 PM <br />7 of 7 <br />©McPherson Engineering <br />2253 N Lyon St <br />06/06/23