Laserfiche WebLink
McPherson Engineering By: T.C. <br />Date: 4/27/23 <br />Gravity Loads: <br />DEMAND DECREASED BY 9.58% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 4.47% < 10% = OK! <br />Anchorage: <br />DEMAND OF 238.9LB. < CAPACITY OF 2213.1LB. = OK! <br />USE (2) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 3.3IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />4/27/2023 11:58 AM <br />7 of 7 <br />©McPherson Engineering <br />2137 N Spruce St <br />06/02/23