Laserfiche WebLink
SCOPE OF WORK: <br />INSTALL (20) SILFAB PRIME SIL-370 HC SOLAR ELECTRIC MODULES AND <br />(20) SOLAREDGE S440 DC POWER OPTIMIZERS ON THE EXISTING 1ST STORY <br />COMPOSITION ROOF. INSTALL ASSOCIATED MOUNTING HARDWARE, <br />JUNCTION BOXES, CONDUIT, CONDUCTORS AND GROUNDING. INSTALL <br />(1) SOLAREDGE SE7600H-US INVERTER WITH INTEGRATED DC DISCONNECT, <br />(1) AC DISCONNECT, AND INSTALL OCPD IN MAIN SERVICE PANEL. <br />HOMEOWNER: ELEAZAR MURILLO <br />PH: 714.334.3817 <br />ADDRESS: 2302 W. HIGHLAND STREET <br />SANTA ANA, CA 92704 <br />DATE: 2/2/23DATE: 2/2/23 <br />SUN SOLAR US, INC. <br />16755 VON KARMAN AVENUE #200 <br />IRVINE, CA 92606 <br />PH: 949.242.0088 RONALD RHODES B, C10 - 975072 <br />VICINITY MAP <br />MURILLO <br />RESIDENCE <br />SHEET INDEX: <br />SHEET 1 PROJECT INFO, VICINITY MAP, NOTES, SCOPE OF WORK <br />SHEET 2 SITE/ROOF PLAN, ELEVATION DETAIL <br />SHEET 3 ELECTRIC LINE DRAWING, GROUNDING DETAIL <br />SHEET 4 CALCULATIONS, SIGNS <br />ATTACHED MODULE, INVERTER, MOUNTING HARDWARE SPEC SHEETS, <br />STRUCTURAL REPORT <br />NTS <br />SHEET <br />NOTICE: <br />ANY CHANGES TO OR USES OF THESE DOCUMENTS/DRAWINGS WITHOUT THE <br />WRITTEN CONSENT OF JENNIFER KEMME OR SCOTT HARRIS ARE STRICTLY PROHIBITED. <br />1 OF 4 <br />PLANS PREPARED BY: <br />JENNIFER KEMME <br />PH: 909.748.1300 <br />(20) SILFAB PRIME SIL-370 HC <br />PEAK POWER = 370 W <br />MAX OPERATING CURRENT = 10.60 A <br />MAX OPERATING VOLTAGE = 34.95 V <br />OPEN CIRCUIT VOLTAGE = 41.75 V <br />SHORT CIRCUIT CURRENT = 11.25 A <br />MAX SERIES FUSE RATING = 20 A <br />TEMP. COEFF. OF Voc = -0.28%/°C <br />DIMENSIONS = 69.4" X 40.8" X 1.4" <br />WEIGHT = 44.0 LBS <br />GENERAL NOTES: <br />1. THIS SYSTEM COMPLIES WITH THE 2022 CRC, 2022 CBC, 2022 CFC, AND THE 2022 <br />CEC. <br />2. THE SYSTEM WILL NOT BE TURNED-ON UNTIL THE SERVING UTILITY COMPANY <br />HAS BEEN NOTIFIED. <br />3. THE INSTALLED SOLAR SYSTEM HAS A DISTRIBUTED WEIGHT LESS THAN 4 PSF. <br />4. THE CONCENTRATED LOAD FOR EACH VERTICAL SUPPORT IS LESS THAN 40 LBS. <br />5. ALL PV EQUIPMENT IS LISTED BY A RECOGNIZED TESTING LAB. INVERTERS ARE <br />UL 1741 COMPLIANT. <br />6. THE BACKFED BREAKER WILL BE LOCATED AT THE OPPOSITE END OF THE BUS <br />FROM THE MAIN BREAKER. <br />7. CONDUCTORS ARE 90° C RATED COPPER WIRE. <br />8. ANY CONDUCTORS EXPOSED TO SUNLIGHT ARE LISTED AS SUNLIGHT <br />RESISTANT. <br />9. IF DC CONDUCTORS ARE RUN INSIDE THE BUILDING, THEY WILL BE CONTAINED <br />IN A METAL RACEWAY. <br />10. ANY CONDUCTORS BETWEEN SEPARATE ARRAYS ON THE ROOF WILL BE <br />PROTECTED IN CONDUIT. <br />11. THE EQUIPMENT GROUNDING CONDUCTOR ON THE ROOF WILL BE PROTECTED <br />FROM PHYSICAL DAMAGE. IT WILL BE TUCKED NEATLY UNDER THE MODULES <br />AND RAILS AND SECURED IN PLACE. <br />12. THE MODULES WILL BE ATTACHED TO THE EQUIPMENT GROUNDING <br />CONDUCTOR IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. <br />13. ALL EXTERIOR CONDUIT, FITTINGS AND BOXES ARE RAIN-TIGHT AND APPROVED <br />FOR USE IN WET LOCATIONS. <br />14. CLEARANCES AROUND ALL ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN <br />ACCORDANCE WITH CEC 110.26. <br />15. SOLAR MODULES WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL OR <br />BUILDING ROOF VENTS. <br />16. IF THE EXISTING MAIN SERVICE PANEL DOES NOT HAVE A VERIFIABLE <br />GROUNDING ELECTRODE SYSTEM, A GROUNDING ELECTRODE SYSTEM WILL BE <br />INSTALLED PER CEC 250.50. THE ELECTRICAL SERVICE WILL BE BONDED TO THE <br />WATER AND GAS PIPING PER SECTION 250.104 OF THE CEC. <br />17. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH CAL-OSHA <br />REGULATIONS. <br />74419PV <br />INVERTER/DC DISCONNECT: (1) SOLAREDGE SE7600H-US <br />MAX DC INPUT VOLTAGE = 480 V <br />NOMINAL DC INPUT VOLTAGE = 400 V <br />MAX DC INPUT CURRENT = 20.0 A <br />DC DISCONNECT MAX INPUT CURRENT = 45.0 A <br />NUMBER OF DC INPUTS = 2 <br />RATED AC POWER = 7600 W <br />AC VOLTAGE = 240 V <br />MAX AC OUTPUT CURRENT = 32.0 A <br />NEMA 4X ENCLOSURE <br />DIMENSIONS = 17.7" X 14.6" X 6.8" <br />WEIGHT = 26 LBS <br />PHOTOVOLTAIC SOLAR PROJECT INFORMATION: <br />SYSTEM SIZE: 7.400 kW (DC), 6.730 kW (AC) <br />MODULES: <br />MODULE ADD-ON:(20) SOLAREDGE S440 <br />DC POWER OPTIMIZERS <br />MAX DC INPUT VOLTAGE = 60 V <br />OPERATING VOLTAGE RANGE = 8 V - 60 V <br />MAX DC INPUT CURRENT = 14.5 A <br />MAX DC OUTPUT CURRENT = 15 A <br />DC OUTPUT VOLTAGE = 380 V <br />MAX POWER PER STRING <br />(CONTROLLED BY INVERTER) = 5700 W <br />NEMA 6P ENCLOSURE <br />DIMENSIONS = 5.1" X 6.0" X 1.2" <br />WEIGHT = 1.5 LB <br />ARRAY: INSTALLED WEIGHT = 2.9 PSF <br />ROOF COVERAGE = 395 SF, <br />ARRAYS COVER 18% OF TOTAL ROOF AREA <br />MOUNTING HARDWARE: GRIPRAC STANDARD RAIL <br />GRIPRAC FLASHING KIT ATTACHMENTS <br />5 16" STAINLESS STEEL LAG BOLTS @ <br />72" OC OR LESS WITH A MINIMUM OF <br />21 2" PENETRATION INTO ROOF RAFTERS <br />EXISTING ROOF INFO: 1 STORY, ASPHALT SHINGLE <br />2 X 4 RAFTERS @ 24" OC <br />The scope of the plans is for the installation of the solar <br />photovoltaic system only and the approval is subject to <br />compliance with all applicable city and state codes and <br />regulations regarding construction. The approval of the plans <br />does not constitute any certification of the accuracy, <br />completeness, or building permit status of the existing buildings <br />and structures as shown. <br />Bldg# 101114285 <br />Elec# 20179030 <br />Issued 03/23/23 <br />2302 W Highland St <br />03/24/23