Laserfiche WebLink
GENERAL NOTES: <br />1. <br />2. <br />3. <br />4. <br />5. <br />SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON A RESIDENTIAL <br />STRUCTURE. <br />DESIGN SHALL COMPLY WITH THE 2019 CALIFORNIA <br />ELECTRIC CODE, NEC, AND ALL LOCAL ORDINANCES AND POLICIES. <br />THIS PROJECT HAS BEEN DESIGNED IN COMPLIANCE WITH THE CBC SECTION <br />1609 TO WITHSTAND A MINIMUM OF 110 MPH WIND LOAD. <br />THIS SYSTEM WILL NOT BE INTERCONNECTED UNTIL APPROVAL FROM THE <br />LOCAL JURISDICTION AND THE UTILITY IS OBTAINED. <br />WHEN A STORAGE BATTERY IS PROVIDED, THIS SYSTEM SHALL BE AN UTILITY <br />INTERACTIVE SYSTEM WITH LISTED STORAGE BATTERIES PER CEC ARTIVLE <br />706, AND CRC SECTION R3327 REQUIREMENTS. STATIONARY STORAGE <br />BATTERIES SYSTEMS SHALL COMPLY CFC, AND HAVING CAPACITIES NOT <br />EXCEEDING THE BALUES SHOWN IN TABLE 608.1 2016 CFC. <br />6. <br />7. <br />THE SOLAR PHOTOVOLTAIC INSTALLATIONO SHALL NOT OBSTRUCT ANY <br />PLUMBING, OR MECHANICAL VENTS. <br />IF THE EXISTING MAIN SERVICE PANEL DOES NOT HAVE A VERIFIABLE <br />GROUNDING ELECTRODE, IT IS THE CONTRACTORS RESPONSIBILITY TO <br />INSTALL A SUPPLEMENTAL GROUNDING ELECTRODE. <br />8. <br />9. <br />A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH <br />CAL-OSHA REGULATIONS AND PER CITY REQUIREMENTS . <br />PROPER ACCESS AND WORKING CLEARANCE WILL BE PROVIDED PER <br />SECTION 11026 CEC. <br />PL <br />PL <br />PL <br />PL <br />DATE: <br />DRAWN BY: LKM <br />PV 1.0 <br />DR <br />A <br />W <br />I <br />N <br />G <br />CO <br />N <br />T <br />R <br />A <br />C <br />T <br />O <br />R <br />CL <br />I <br />E <br />N <br />T <br />/ <br />S <br />I <br />T <br />E <br /> <br />D <br />A <br />T <br />A <br />AP <br />N <br />: <br />SI <br />Z <br />E <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />S <br />SITE PLAN <br />Ll <br />o <br />y <br />d <br /> <br />M <br />i <br />l <br />l <br />s <br /> <br />S <br />m <br />a <br />r <br />t <br /> <br />S <br />o <br />l <br />a <br />r <br /> <br />D <br />e <br />s <br />i <br />g <br />n <br />L <br />I <br />C <br />E <br />N <br />SE D <br />1016878 <br />999378 <br />G E N E R A L <br />C <br />ON <br />T <br />R <br />A <br />C <br />T <br />O <br />R <br />STATE OF CALIFORNIA <br />DESIG N . B U I L D <br />DESIGN B UI L D. STATE OF CALIFORNIA <br />L <br />I <br />C <br />E <br />N <br />S E D <br />G E N E R A L <br />C <br />ON <br />T <br />R <br />A <br />C <br />T <br />O <br />R <br />LLOY D P M I LL S <br />LLOY D P M I LL S <br />12.48kWDC <br />7.54kWAC <br />00 <br />. <br />1 <br />1 <br />7 <br />. <br />2 <br />2 <br />3 <br />Co <br />u <br />r <br />t <br />l <br />an <br />d <br /> <br />a <br />n <br />d <br /> <br />An <br />n <br />e <br /> <br />A <br />l <br />ex <br />23 <br />3 <br />4 <br /> <br />N <br />. <br /> <br />W <br />e <br />s <br />t <br />w <br />o <br />o <br />d <br /> <br />A <br />v <br />e <br />. <br />Sa <br />n <br />t <br />a <br />An <br />a <br />, <br /> C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />6 <br />10/11/2022 <br />CAL FIRE SET BACK <br />18" PATHWAY <br />CAL FIRE SET BACK <br />36" PATHWAY <br />ROOF ACCESS <br />ROOF ACCESS <br />PROPOSED INSTALLATION OF <br />PANELS AND <br />ENPHASE IQ8+ MICRO-INVERTERS <br />M <br />EXISTING 200A MAIN <br />SERVICE PANEL W/ <br />200A OCPD <br />IQ COMBINER <br />23 <br />3 <br />4 <br /> <br />N <br />. <br /> <br />W <br />e <br />s <br />t <br />w <br />o <br />o <br />d <br /> <br />A <br />v <br />e <br />. <br />Date Certified and <br />Exp. Date : 3/31/2024 <br />Signed:10/31/2022 <br />Professional Certification. I hereby certify that these documents <br />were prepared or approved by me, and that I am a duly licensed <br />professional engineer under the laws of the State of California. <br />License No. ____________, Expiration Date: _______________ 88083 03/31/2024 <br />Engineerinc.io, <br />303 N Glenoaks Blvd <br />Burbank, CA 91502 <br /> (747) 333-5991 <br />2334 N Westwood <br />Ave11/14/22