Laserfiche WebLink
McPherson Engineering By: T.C. <br />Date: 4/27/23 <br />Gravity Loads: <br />DEMAND DECREASED BY 17.98% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 8.07% < 10% = OK! <br />Anchorage: <br />DEMAND OF 362.9LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />4/27/2023 11:35 AM <br />7 of 7 <br />©McPherson Engineering <br />2332 N Spurgeon <br />St05/30/23