Laserfiche WebLink
Ashley&Vance <br /> E N G I N E E R I N G , I N C <br />Job:201601 - Abodu Modular - Abodu <br />Footing Width Calculation F1 <br />Description DL LL <br />of Variables:5r = 5 ft of roof trib Roof 0 40 psf <br />4f = 4 ft of floor trib Floor 0 0 psf <br />3g = 3 ft of garage trib Garage 0 0 psf <br />2d = 2 ft of deck trib Deck 0 0 psf <br />w = wall above and/or self wt.Wall 0 0 psf <br />Conventional Footing Design Parameters: <br />Allowable Bearing Pressure 1500 psf <br />FT TRIB Wdl Wll <br />(ft) (plf)(plf) <br />F1 7.5 r 0 300 <br />7.0 f 0 0 <br />0.0 g 0 0 <br />0.0 d 0 0 <br />10.0 w 0 0 <br />TL 0 300 <br />tot 300 plf <br />Try Footing Width, w = 15 inches <br />qbear 240 psf <br />qallow 1500 psf <br />qallow/qbear 6.25 Footing OK <br />t o t <br />q al l <br />w <br />Page 3.2 of 3.32429 W Hood Ave #2 - <br />10111640912/12/2023