Laserfiche WebLink
UNIRAC <br />eeatuning @ SHED ¢ S E A L reunovoor <br />FLASHKIT PRO <br />FLASHKIT PRO is the complete attachment solution for composition shingle roofs. Featuring Unirac?s patented <br />SHED & SEAL technology, a weather proof system which provides the ultimate protection against roof leaks. <br />Kitted in 10 packs for maximum convenience, flashings and hardware are available in Mill or Dark finishes. <br />With FLASHKIT pro, you have everything you need for a quick, professional installation. <br />P i d <br />c e t <br />i <br />TRUSTED WATER SEAL FLASHINGS YOUR COMPLETE SOLUTION CONVENIENT 10 PACKS <br />ratuanc Q SHED 5 SEAL rrcnmorocy Flashings. lags, continuous slot L-Feet and hardware Packaged for speed and ease ef handling <br />UNIRAC <br />s ta t o rs @ S H E D 6S E A L trennorocr <br />FLASHKIT PRO <br />INSTALLATION GUIDE <br />FLASHKIT PRO IS THE COMPLETE FLASHING AND ATTACHMENT SOLUTION FOR COMPOSITION ROOFS. <br />INSTALL FEASH4IT PR0 FLASHING INSTALL LFOOT <br />PRE-INSTALL <br />Locale tua? rafters and snap chalk nes to mark the installation <br />paint for cach roof attachment <br />ATTACH LFOOT TG Rau, <br />= Drive the lag bolt down until the | foot 1s held firmly im place tis <br />rotmal for the EPDM on the underside of the staitess steel backed <br />[POM washer to compress. and expasi teyond! the oufside ede of <br />the steel washer when the proper torque 1s ai r l <br />+ Dull a 2/32. prlal bole at each soof atlachment Full each pilot hole Te: <br />with sealant <br />STEP 1 INSTALL FLASHKIT PRO FLASHING <br />+ Add aU shaped bead al roof sealant to the underside of the ashing <br />with the open side of Inc U pomting down the toot slope Shde <br />the alumunum flashing underneath the raw of shingles directly up <br />slope {rom the pulot hole as shawn Align the indicator marks on the <br />lower end of the flashing with the chalk lines an the roof to center <br />the raised hole in the flz,hing aver the pilut hole in the roof When <br />installed cere: t l ,"ang will extend under the two coursesof <br />shingles a i e the p e w <br />+ Use caution to avad over torquemng the lagbolt using a mpact der <br />+ Repeal Stops1 and 2 at each root attachment pant <br />STEP 3 ATTACH LFOOTTO RAIL <br />+Insert the included 3/8 16 1 bolts into the lower slot on the Rail <br />(sold separately) spacing the bolts to match the spacing between <br />the roof att- ments, <br />+ Position the Rav agaist the L Foot and insert the threaded end of <br />theT Boll fhraueh the cantinyous stat in the L Foot Apply anti sexe <br />lo bolt tneads to pre rat pulling of the 7 bolt and si: tuged 3 8 <br />sealed flange nul Fact: the ( f l a n g e nul on the T bolt and <br />fhaget lighten Repeat SILP 3 untu a L Feet are secured la the RailSTEP 2 INSTALL L-FOOT <br />walla T bolt Adust the level and height ofthe Rai and orque eact <br />+ Fasten L toot and flasting into place by passing the included lag belt to 301 Ibs <br />boll and pre installed stainless steel backed EPDM washer through <br />the | fout EPDM grommet. and the saised hole in the flashing. «nto <br />Tbe pi vi tivle: on the roof rafter <br />C o m p l e t e S o l a r . <br />ABrighter Way. <br />3000 EXECUTIVE PKWY, <br />S T E 5 0 4 S A N R A M O N , <br />C A 94583 <br />LICENSE T Y P E C10 <br />LICENSE # 961988 <br />PHONE # (877) 299-4943 <br />J <br />D ES I G N ER : O D J <br />M A R I A <br />H E R N A N D E Z <br />R E S I D EN C E <br />2402 ALONA ST, <br />SANTA ANA, <br />CA 92706 <br />APN:00106106 <br />DATE:4/21/2023 <br />SHEET <br />8-5 <br />SPEC SHEET <br />2402 N Alona St <br />06/06/23