Laserfiche WebLink
McPherson Engineering By: T.B. <br />Date: 3/13/23 <br />Gravity Loads: <br />DEMAND DECREASED BY 20.91% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 9.52% < 10% = OK! <br />Anchorage: <br />DEMAND OF 509.2LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />3/13/2023 11:39 AM <br />7 of 7 <br />©McPherson Engineering <br />2336 N Riverside <br />Dr05/16/23