Laserfiche WebLink
McPherson Engineering By: T.B. <br />Date: 12/22/22 <br />Gravity Loads: <br />DEMAND DECREASED BY 9.03% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 1.02% < 10% = OK! <br />Anchorage: <br />DEMAND OF 732.9LB. < CAPACITY OF 1191.7LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 3.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />12/22/2022 1:36 PM <br />7 of 7 <br />©McPherson Engineering <br />2404 E Buffalo Ave <br />02/15/23