My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2518 W Lingan Ln - Plan
PBA
>
Building
>
ProjectDox
>
L
>
Lingan Ln
>
2518 W Lingan Ln
>
2518 W Lingan Ln - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:04:27 PM
Creation date
6/1/2025 12:04:19 PM
Metadata
Fields
Template:
Plan
Permit Number
20181752
101117542
Full Address
2518 W Lingan Ln
Document Relationships
101117542 - Permit
(Permit - Plan)
Path:
\Building\Permits\L\Lingan Ln\2518 W Lingan Ln
20181752 - Permit
(Permit - Plan)
Path:
\Building\Permits\L\Lingan Ln\2518 W Lingan Ln
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV <br />SHEET NAME <br />SHEET NUMBER <br />DATEDESCRIPTION <br />VERSION <br />PV-6 <br />PROJECT NAME <br />UR10-18-2023INITIAL RELEASE <br />FL <br />O <br />R <br />E <br />S <br />, <br /> <br />O <br />S <br />C <br />A <br />R <br />25 <br />1 <br />8 <br /> W <br />L <br />I <br />N <br />G <br />A <br />N <br /> <br />L <br />N <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br />CA <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br /> US <br />A <br />AP <br />N <br /># <br /> <br />40 <br />7 <br />0 <br />3 <br />2 <br />1 <br />3 <br />UT <br />I <br />L <br />I <br />T <br />Y <br />: <br /> <br />SC <br />E <br />AH <br />J <br />: <br /> <br />CI <br />T <br />Y <br /> <br />O <br />F <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />SHEET SIZE <br />ANSI B <br />11" X 17" <br />ENERGY RENOVATION CENTER <br />11731 Sterling Avenue, Unit G <br /> Riverside, CA 92503 <br />CSLB # :- 1009326 <br />PH:- 8886040226 <br />pm@energyrenovationcenter.com <br />A11-02-2023REVISION <br />ELECTRICAL <br />CALCULATION <br />SOLAR MODULE SPECIFICATIONS <br />MANUFACTURER / MODEL #HANWHA Q CELLS Q.PEAK DUO BLK <br />ML-G10+ (405W) MODULES <br />VMP 37.39 <br />IMP 10.83 <br />VOC 45.34 <br />ISC 11.17 <br />MODULE DIMENSION 74.0"L x 41.1"W x 1.26"D <br />INVERTER SPECIFICATIONS <br />MANUFACTURER / MODEL #ENPHASE ENERGY IQ7PLUS-72-2-US <br />NOMINAL OUTPUT VOLTAGE 240 VAC <br />NOMINAL OUTPUT CURRENT 1.21A <br />AMBIENT TEMPERATURE SPECS <br />WEATHER STATION: TUSTIN MCAF <br />RECORD LOW TEMP 2° <br />AMBIENT TEMP (HIGH TEMP 2%)31° <br />CONDUIT HEIGHT (ABOVE ROOF)7/8" <br />ROOF TOP TEMP 31° <br />CONDUCTOR TEMPERATURE RATE (ON ROOF)90° <br />CONDUCTOR TEMPERATURE RATE (OFF ROOF)75° <br />MODULE TEMPERATURE COEFFICIENT OF Voc -0.27%/°C <br />PERCENT OF VALUES NUMBER OF CURRENT <br />CARRYING CONDUCTORS IN EMT <br />.80 4-6 <br />.70 7-9 <br />.50 10-20 <br />ELECTRICAL CALCULATION <br />SCALE: NTS1 <br />ELECTRICAL NOTES <br />1.) ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR ITS APPLICATION. <br />2.) ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90 AND 75 DEGREE C WET ENVIRONMENT. <br />3.) WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY TO, AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY. <br />4.) WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH CEC 110.26. <br />5.) DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS. CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS, SUPPORTS, FITTINGS AND ACCESSORIES TO FULFILL <br />APPLICABLE CODES AND STANDARDS. <br />6.) WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT SPECIFIED, THE CONTRACTOR SHALL SIZE THEM ACCORDINGLY. <br />7.) ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. <br />8.) MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE SUPPORT RAIL, PER THE GROUNDING CLIP MANUFACTURER'S INSTRUCTION. <br />9.) MODULE SUPPORT RAIL TO BE BONDED TO CONTINUOUS COPPER G.E.C. VIA WEEB LUG OR ILSCO GBL-4DBT LAY-IN LUG. <br />10.) THE POLARITY OF THE GROUNDED CONDUCTORS IS NEGATIVE <br />AC CONDUCTOR AMPACITY CALCULATIONS: <br />FROM JUNCTION BOX TO COMBINER BO X: <br />AMBIENT TEMPERATURE ADJUSTMENT FOR EXPOSED CONDUIT <br />PER CEC 310.15(B)(3)(c): (7/8"RULE) <br />EXPECTED WIRE TEMP (In Celsius)31° <br />TEMP. CORRECTION PER TABLE 310.15(B)(2)(a)0.96 <br />NO. OF CURRENT CARRYING CONDUCTORS 2 <br />CONDUIT FILL CORRECTION PER CEC 310.15(B)(3)(a)1.00 <br />CIRCUIT CONDUCTOR SIZE 10 AWG <br />CIRCUIT CONDUCTOR AMPACITY 40A <br />REQUIRED CIRCUIT CONDUCTOR AMPACITY PER CEC 690.8(A&B): <br />18.15A1.25 X # MICRO-INVERTERS (MAX. BRANCH LENGTH) X MAX OUTPUT <br />CURRENT <br />DERATED AMPACITY OF CIRCUIT CONDUCTOR PER CEC 310.15(B)(2)(a) <br />38.40ATEMP. CORRECTION PER TABLE 310.15(B)(2)(a) X <br />CONDUIT FILL CORRECTION PER CEC 310.15(B)(3)(a) X CIRCUIT <br />CONDUCTOR AMPACITY <br />RESULT SHOULD BE GREATER THAN (18.15A) OTHERWISE LESS THE ENTRY FOR <br />CIRCUIT CONDUCTOR SIZE AND AMPACITY <br />AC CONDUCTOR AMPACITY CALCULATIONS: <br />FROM COMBINER BOX TO INTERCONNECTION: <br /># OF INVERTERS 12 <br />EXPECTED WIRE TEMP (In Celsius)31° <br />TEMP. CORRECTION PER TABLE 310.15(B)(2)(a)0.94 <br />NO. OF CURRENT CARRYING CONDUCTORS 3 <br />CONDUIT FILL CORRECTION PER CEC 310.15(B)(3)(a)1.00 <br />CIRCUIT CONDUCTOR SIZE 10 AWG <br />CIRCUIT CONDUCTOR AMPACITY 35A <br />REQUIRED CIRCUIT CONDUCTOR AMPACITY PER CEC 690.8(A&B): <br />18.15A1.25 X # MICRO-INVERTERS (MAX. BRANCH LENGTH) X MAX OUTPUT <br />CURRENT <br />DERATED AMPACITY OF CIRCUIT CONDUCTOR PER CEC 310.15(B)(2)(a) <br />32.90ATEMP. CORRECTION PER TABLE 310.15(B)(2)(a) X <br />CONDUIT FILL CORRECTION PER CEC 310.15(B)(3)(a) X CIRCUIT <br />CONDUCTOR AMPACITY <br />RESULT SHOULD BE GREATER THAN (18.15A) OTHERWISE LESS THE ENTRY FOR <br />CIRCUIT CONDUCTOR SIZE AND AMPACITY <br />2518 W Lingan Ln <br />12/1/2023
The URL can be used to link to this page
Your browser does not support the video tag.