My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2621 S Glenarbor St - Plan
PBA
>
Building
>
ProjectDox
>
G
>
Glenarbor St
>
2621 S Glenarbor St
>
2621 S Glenarbor St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:04:32 PM
Creation date
6/1/2025 12:04:24 PM
Metadata
Fields
Template:
Plan
Permit Number
20182134
101118296
Full Address
2621 S Glenarbor St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NONO <br />NO <br />NONO <br />EGC: Bare CU #6 <br />BRANCH CIRCUIT <br />FROM PV ARRAY TO <br />JUNCTION BOX <br />#12 2 <br />A -- <br />1 <br />B <br />JUNCTION BOX, <br />NEMA-4 <br />THWN-2 <br />EGC: THWN-2 1 <br />6 <br />B <br />3 <br />(4)#10 | (2)#8 <br />#10 <br />EMT 3/4" <br />#8 <br />#10 <br />#10 <br />CONDUCTOR / CONDUIT SCHEDULE <br />DESCRIPTION & <br />CONDUCTOR TYPE <br />CONDUCTOR SIZE <br />(AWG) <br />NUMBER OF <br />CONDUCTORS <br />1 <br />ROOFTOP <br />ARRAY WIRING A <br />DC <br />AC Branch Circuit #1AC <br />DC <br />AC <br />DC <br />AC Branch Circuit #2 <br />Branch Circuit #3 <br />8 AC MODULES <br />8 AC MODULES <br />10 AC MODULES <br />TAG <br />H <br />(E) UTILITY <br />BIDIRECTIONAL <br />METER #: <br />222013-136497 <br />EXISTING <br />GROUND <br />THWN-2 <br />EGC: THWN-2 1 <br />3 <br />EMT 1-1/2" <br />#6 <br />#2/0 <br />MI <br />D <br />ETHERNET <br />CONNECTION <br />TO DSL/CABLE <br />MODEM <br />CA <br />T <br />5 <br />e <br />PVS6 <br />BACKUP BUS (200A MAX) <br /> (N) HUB+ <br />200A, 120/240 V, NEMA-3R <br />MODEL: <br />GE <br />N <br />E <br />R <br />A <br />T <br />I <br />O <br />N <br /> <br />B <br />U <br />S <br />(1 <br />2 <br />5 <br />A <br /> <br />M <br />A <br />X <br />) <br />10 <br />YES <br />LOCATION: <br />**PVS6 <br />**BREAKERS ARE FIELD INSTALLED. <br />BREAKER RATING MAY VARY FROM 15A OR 20A <br />SV-HUB-01-C <br />C <br />C <br />OUTSIDE <br />MLO <br /> GROUNDED (INCLUDE GEC) UNGROUNDEDü <br />INSTALLATION NOTES <br />1 <br />CHECK BOX FOR WHETHER SYSTEM IS GROUNDED <br />OR UNGROUNDED: <br />FOR UNGROUNDED SYSTEMS: <br />·DC OCPD DISCONNECT BOTH CONDUCTORS OF <br />EACH SOURCE CIRCUIT. <br />·UNGROUNDED CONDUCTORS MUST BE <br />IDENTIFIED PER NEC 210.5(C). WHITE FINISHED <br />CONDUCTORS ARE NOT PERMITTED. <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />DC / DC CONVERTERS NO <br />SOURCE CIRCUIT JUNCTION BOX <br />SUNVAULT ESS <br />SUNVAULT BATTERY INVERTER <br />SOLAR LOAD CENTER <br />PV PRODUCTION METER <br />SEPARATE AC DISCONNECT <br />HEAT DETECTOR <br />YES <br />NO <br />11 <br />13 <br />BACK UP LOAD CENTER <br />NON-BACK UP LOAD CENTER <br />EV SUPPLY EQUIPMENT <br />NO <br />TAG DESCRIPTION <br />12 <br />REMOTE POWER OFF SWITCH <br />14 <br />HUB+ <br />INCOMING SOURCE FEED <br /> , 120/240 V, 1 PH, 3 W <br />LOCATION: <br />MANUF: <br />GND <br />TOP FED <br />MCB <br />GND <br />200A, 2P <br />200A,2P <br />225A <br />EXTERIOR WALL <br />---- <br />(N) MAIN SERVICE PANEL <br />THE DESIGNED INTERCONNECTION MEETS <br />NEC 705.12(B)(3)(3) REQUIREMENTS <br />1 PV MODULE <br />MICROINVERTER (FIELD-INSTALLED) <br />MISOLAR / BRANCH 1.PROPER LISTING EXPECTED FOR CONDITIONS <br />OF USE ON ALL LUGS, FITTINGS, CRIMPS, ETC. <br />2.ALL CONDUIT BEND RADII TO CONFORM TO <br />THE NEC MINIMUM BEND RADII <br />REQUIREMENTS. <br />3.MINIMUM CLEARANCE SHALL BE MAINTAINED <br />PER NEC FOR ALL NEW EQUIPMENT TO BE <br />INSTALLED. <br />4.EXISTING GROUNDING ELECTRODE SYSTEM <br />MUST MEET NEC AND LOCAL UTILITY <br />REQUIREMENTS. <br />5.COPPER CONDUCTORS SHALL BE USED <br />UNLESS SPECIFIED. <br />6.TYPE NM (ROMEX) CONDUCTORS ARE <br />ALLOWED FOR INTERNAL AND ATTIC RUNS <br />AND SHALL BE INSTALLED MEETING NEC <br />REQUIREMENTS. <br />7.IF MAIN SERVICE PANEL IS TO BE UPGRADED, <br />IT WILL BE PERMITTED AND INSTALLED BY <br />3RD PARTY. <br />8.AC WIRING SHALL UPSIZE IF VOLTAGE DROP <br />EXCEEDS 2%. <br />9.RUN CONDUCTORS IN EXISTING CONDUIT <br />WHEN AVAILABLE PROVIDED IT HAS NO <br />OTHER CONDUCTORS RUNNING THROUGH IT. <br />10.EQUIVALENT SPECIFICATION ON CABLES AND <br />ELECTRICAL EQUIPMENT SPECIFIED ARE <br />ACCEPTABLE. <br />ELECTRICAL NOTES <br />SUNPOWER PROVIDED MICROINVERTER <br />EXTENSION CABLE, LISTED AS AN ASSEMBLY <br />MAKE/MODEL: ENPHASE IQ7HS-66-M-US [240] | QTY: 26 <br />MAKE/MODEL: WAAREE ENERGIES LIMITED WSMDI-400 | QTY: 26 <br />NO <br />20A, 2P <br />20A, 2P <br />20A, 2P <br />ENERGY STORAGE SYSTEM <br />MODEL: <br />6 <br />YES <br />YES <br />6.5 kWh <br />BATTERY <br />6.5 kWh <br />BATTERY <br />5 <br />13 kWh, 6.8 kW SUNVAULT <br />(3) #8 THWN <br />(1) #10 THWN EGC <br />(3) #12 COMM. CABLES <br />INVERTER <br />DC <br />AC <br />LOCKABLE <br />INTEGRATED <br />AC <br />DISCONNECT <br />40A, 2P <br />SV-BASE13-C <br />TO <br />(E)LOADS <br />NO <br />(N) <br />SPD <br />LAND (N) SURGE <br />PROTECTION DEVICE <br />(SPD) CONDUCTORS <br />TO (N) BREAKER <br />NO <br />NO <br />**GRID SENSE <br />IN ESS NO <br />N <br />- <br />B <br />A <br />C <br />K <br />U <br />P <br /> <br />B <br />U <br />S <br />(1 <br />2 <br />5 <br />A <br /> <br />M <br />A <br />X <br />) <br />TO <br />(E) LOADS <br />NO <br />125A, 2P <br />·RELOCATE ALL BREAKERS FROM (E) MSP TO <br />APPROPRIATE PANELS OF (N) HUB+. <br />·INSTALL (N) 225A MAIN SERVICE PANEL IN <br />PLACE OF (E) MSP. INSTALL (N) 200A, 2P SUB <br />FEED BREAKER IN THE (N) MSP AND FEED (N) <br />HUB+ WITH THIS BREAKER. <br />·INSTALL, WIRE, AND FASTEN A 125A BREAKER <br />ON THE NON-BACKUP BUS USING BREQS125 <br />HOLD DOWN KIT. <br />·THE FACTORY-INSTALLED CTS INSIDE THE HUB+ <br />ARE SUFFICIENT AS ALL LOADS ARE TO BE <br />TRANSFERRED FROM MSP TO HUB+. <br />·CTs ARE COMPATIBLE WITH THIS INSTALLATION. <br />·INSTALL (N) HUB+ ON EXTERIOR WALL, BESIDE <br />(E) MSP. <br />·INSTALL (N) ESS ON EXTERIOR WALL. <br />·QUAD/TWIN BREAKERS REQUIRED. <br />·SEE PVE-6 FOR DETAILS. <br />LOAD LABEL BREAKER SIZE <br />RELOCATED LOADS (BACKUP BUS) <br />DISPOSAL <br />DISHWASHER <br />WASHER <br />CONV <br />DRYER <br />FAU <br />YARD PLUG <br />AIR BLOWER <br />KITCHEN <br />CONV <br />UPSTAIRS BATH <br />POOL LIGHTS <br />JACUZZI <br />LIGHTS <br />LIGHTS <br />20A, 1P <br />20A, 1P <br />20A, 1P <br />20A, 1P <br />20A, 1P <br />20A, 1P <br />20A, 1P <br />20A, 1P <br />20A, 1P <br />20A, 1P <br />20A, 1P <br />15A, 1P <br />20A, 1P <br />20A, 1P <br />20A, 1P <br />KITCHEN 20A, 1P <br />LOAD LABEL BREAKER SIZE <br />RELOCATED LOADS (NON-BACKUP BUS) <br />RANGE 50A, 2P <br />POOL PUMP 20A, 2P <br />NOTE: <br />SEPARATE CONDUIT RUN WILL BE <br />UTILIZED FOR THE RELOCATED LOADS <br />W/ CONSIDERATIONS TO AMPACITY <br />ADJUSTMENT FACTORS <br />CONDUIT/CABLE TYPE CONDUIT SIZE <br />NOTE: <br />SEPARATE CONDUIT RUN WILL BE <br />UTILIZED FOR THE RELOCATED LOADS <br />W/ CONSIDERATIONS TO AMPACITY <br />ADJUSTMENT FACTORS <br />1 <br />4 <br /> <br />1 <br /> <br />4 <br /> <br /> <br /> <br />H <br /> <br />A <br /> <br />R <br /> <br />B <br /> <br />O <br /> <br />U <br /> <br />R <br /> <br /> <br />W <br /> <br />A <br /> <br />Y <br /> <br /> <br />S <br /> <br />O <br /> <br />U <br /> <br />T <br /> <br />H <br />R <br />I <br /> <br />C <br /> <br />H <br /> <br />M <br /> <br />O <br /> <br />N <br /> <br />D <br /> <br />, <br /> <br /> <br />C <br /> <br />A <br /> <br /> <br /> <br /> <br />9 <br /> <br />4 <br /> <br />8 <br /> <br />0 <br /> <br />4 <br />( <br />5 <br /> <br />1 <br /> <br />0 <br /> <br />) <br /> <br /> <br />5 <br /> <br />4 <br /> <br />0 <br /> <br />- <br /> <br />0 <br /> <br />5 <br /> <br />5 <br /> <br />0 <br />C <br />O <br /> <br />R <br /> <br />P <br /> <br />O <br /> <br />R <br /> <br />A <br /> <br />T <br /> <br />I <br /> <br />O <br /> <br />N <br /> <br />, <br /> <br /> <br /> <br /> <br />S <br /> <br />Y <br /> <br />S <br /> <br />T <br /> <br />E <br /> <br />M <br /> <br />S <br />R E V I S I O N S <br />SO <br />L <br />A <br />R <br /> <br />I <br />N <br />D <br />I <br />V <br />I <br />D <br />U <br />A <br />L <br /> <br />P <br />E <br />R <br />M <br />I <br />T <br /> <br />P <br />A <br />C <br />K <br />A <br />G <br />E <br />GR <br />I <br />D <br />- <br />T <br />I <br />E <br />D <br /> <br />P <br />H <br />O <br />T <br />O <br />V <br />O <br />L <br />T <br />A <br />I <br />C <br /> <br />S <br />Y <br />S <br />T <br />E <br />M <br />REV DESCRIPTION DATE DB <br />DRAWN BY: <br />PROJECT <br />DATE DRAWN <br />SCALE <br />DW <br />I <br /> <br />A <br />T <br />M <br />O <br />J <br />O <br />26 <br />2 <br />1 <br /> <br />S <br /> <br />G <br />L <br />E <br />N <br />A <br />R <br />B <br />O <br />R <br /> <br />S <br />T <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br />L <br />I <br />F <br />O <br />R <br />N <br />I <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />RP-460674 <br />10 <br />. <br />4 <br />0 <br /> <br />k <br />W <br />10-15-2023 <br />P. Avena <br />PATRICK AVENA <br />C <br />A <br /> <br /> <br /> <br />L <br /> <br />I <br /> <br />C <br /> <br />E <br /> <br />N <br /> <br />S <br /> <br />E <br /> <br /> <br />C <br />- <br />1 <br />0 <br />, <br /> <br />B <br /> <br /> <br /># <br /> <br />8 <br /> <br />9 <br /> <br />0 <br /> <br />8 <br /> <br />9 <br /> <br />5 <br />C <br />A <br /> <br /> <br /> <br />L <br /> <br />I <br /> <br />C <br /> <br />E <br /> <br />N <br /> <br />S <br /> <br />E <br /> <br /> <br />C <br />- <br />1 <br />0 <br />, <br /> <br />B <br /> <br /> <br /># <br /> <br />8 <br /> <br />9 <br /> <br />0 <br /> <br />8 <br /> <br />9 <br /> <br />5 <br />(N <br />) <br />13 <br /> <br />k <br />W <br />h <br /> S <br />U <br />N <br />V <br />A <br />U <br />L <br />T <br /> <br />E <br />N <br />E <br />R <br />G <br />Y <br /> <br />S <br />T <br />O <br />R <br />A <br />G <br />E <br /> <br />S <br />Y <br />S <br />T <br />E <br />M <br />EL <br />E <br />C <br />T <br />R <br />I <br />C <br />A <br />L <br /> <br />S <br />I <br />N <br />G <br />L <br />E <br />- <br />L <br />I <br />N <br />E <br /> <br />D <br />I <br />A <br />G <br />R <br />A <br />M <br />& <br />S <br />P <br />E <br />C <br />I <br />F <br />I <br />C <br />A <br />T <br />I <br />O <br />N <br />S <br />NTS <br />SHEET <br />PVE-1 <br />2621 S Glenarbor St - <br />201821343/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.