Laserfiche WebLink
By: T.S. <br />Date: 9/18/23 <br />Gravity Loads: <br />DEMAND DECREASED BY 8.1% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 3.55% < 10% = OK! <br />Anchorage: <br />DEMAND OF 603.8LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 5.3333FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRA <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />9/18/2023 4:08 PM <br />7 of 7 <br />©McPherson Engineering <br />2530 S Pacific Ave <br />10/3/2023