My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
300 W Carriage Dr Unit# A - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Carriage Dr
>
300 W Carriage Dr Unit# A
>
300 W Carriage Dr Unit# A - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:06:30 PM
Creation date
6/1/2025 12:06:24 PM
Metadata
Fields
Template:
Plan
Permit Number
20182674
101119107
Full Address
300 W Carriage Dr Unit# A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
04/19/2024 <br />Design Criteria <br />Code 2022 California Building Code (ASCE 7‐16) <br />Risk category II Wind Load (component and Cladding) <br />Roof Dead Load Dr 10 psf V 95 mph <br />PV Dead Load DPV 3 psf Exposure B <br />Roof Live Load Lr 20 psf <br />Ground Snow S 0 psf <br />If you have any questions on the above, please do not hesitate to call. <br />Sincerely, <br />Eugene Munyanziza, P.E.Signed 04/19/2024 <br />EV Engineering, LLC <br />projects@evengineersnet.com <br />http://www.evengineersnet.com <br />Exp: 06/30/2024 <br />RE: Structural Certification for Installation of Residential Solar <br /> ALICIA RAMIREZ:300 CARRIAGE DR A, SANTA ANA, CA, 92707 <br />Attn: To Whom It May Concern <br />This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the <br />PV system to existing roof framing. From the field observation report, the roof is made of EPDM Flat roofing <br />over roof plywood supported by 2X8 Rafters at 24 inches. The slope of the roof was approximated to be 2 <br />degrees. <br />After review of the field observation data and based on our structural capacity calculation, the existing roof <br />framing has been determined to be adequate to support the imposed loads without structural upgrades. <br />Contractor shall verify that existing framing is consistent with the described above before install. Should they <br />find any discrepancies, a written approval from SEOR is mandatory before proceeding with install. Capacity <br />calculations were done in accordance with applicable building codes. <br />projects@evengineersnet.com <br />http://www.evengineersnet.com <br />300 W Carriage Dr Unit# <br />A - 201826746/12/2024
The URL can be used to link to this page
Your browser does not support the video tag.