Laserfiche WebLink
Rev: 7/15/2021 <br /> <br />RESIDENTIAL <br />PHOTOVOLTAIC <br /> <br /> <br /> <br /> SOL-01 CBC 2019 <br /> <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br /> <br />Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. <br /> <br />Project Address: <br />Contractor Company Name: <br />Contractor License Number: <br /> <br /> YES NO Are the following applicable to the proposed project? <br />1.   Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />2.   Will the PV system be installed on a roof having only one roofing layer with no <br /> overlays? <br />3.   Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />4.   Will the PV system weigh maximum 4 pounds per square feet or less? <br />5.   Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between <br /> the underside of modules and the surface of the roof? <br />7.   Will the PV system be installed without using any ballast system or counter-weight <br /> system? <br />8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />10.   Are ALL the structural pages of the plans stamped and signed by a California <br /> licensed professional engineer? (including project specific site plan, PV layout, <br /> anchorage spacing, anchorage details and manufacturer’s PV support information.) <br /> <br />I certify under penalty of perjury under the laws of the State of California that the above is true: <br />Print Name: Signature: <br />Phone Number: Date: <br />Email Address: <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />3002 CUBBON ST <br />ING ELECTRIC INC <br />1048140 <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />SHERRY MANLEY <br />909-748-1300 <br />sherrymanley@visionce.com <br />10/04/2023 <br />3002 W Cubbon St - <br />2018128112/6/2023