Laserfiche WebLink
As Noted <br />MI <br />N <br />C <br />H <br />A <br />C <br />A <br />, <br /> <br />J <br />O <br />S <br />E <br /> <br />L <br />U <br />I <br />S <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />- <br />1 <br />8 <br />3 <br />0 <br />AP <br />N <br />: <br /> <br />4 <br />0 <br />3 <br />- <br />1 <br />9 <br />3 <br />- <br />1 <br />6 <br />RE <br />S <br />I <br />D <br />E <br />N <br />T <br />I <br />A <br />L <br /> <br />P <br />H <br />O <br />T <br />O <br />V <br />O <br />L <br />T <br />A <br />I <br />C <br />31 <br />5 <br /> <br />E <br /> <br />S <br />T <br />A <br />N <br />F <br />O <br />R <br />D <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />FULL SIZE PRINT: 17"x11" <br />A <br />REV <br />Signature <br />DRAWINGS PROVIDED BY: <br />SOLAR MAX DESIGN <br />Email: solarmax.dsgn@gmail.com <br />Web: www.solarmaxdsgn.com <br />Phone: (310) 740-9649(310) 844-7370 & <br />3805 E 2ND STREET, SUITE C <br />LONG BEACH, CA 90803 <br />CLIENT INFORMATION: <br />PROJECT: <br />The contractor shall provide a written letter <br />to the building inspector stating that all <br />inaccessible structural connections have <br />been installed in conformance with the <br />requirements of the approved plans. <br />NOTE: <br />DESCRIPTION DATE: <br />B <br />DATE: <br />SCALE: <br />SHEET TITLE: <br />SHEET <br />NUMBER: <br />4/7/2023 <br />Class: C10 <br />Solar Life <br />7129 Westport Street <br />Riverside, California 92506 <br />Phone: (626) 353-2838 <br />License: 1073930 <br />CONTRACTOR <br />Signature <br />Exp: 03/31/2023 <br />INSPECTION <br />PLANNING <br />FIRE PROTECTION <br />EQUIPMENT FUNCTION <br />BONDING AND GROUNDING <br />1. INSPECTOR TO VERIFY EXISTING FIELD CONDITIONS. MODIFICATIONS TO <br />EXISTING PHOTOVOLTAIC (PV) SYSTEMS INCLUDE VERIFICATION OF EXISTING <br />GROUNDING SYSTEM, BONDING REQUIREMENTS, ELECTRICAL PANEL SIZE AND <br />OVER CURRENT PROTECTION. <br />2. CONTRACTOR TO BE PRESENT FOR FIRST AND FINAL INSPECTIONS. <br />3. FIRST REQUIRED INSPECTION SHALL BE FOR MODULE RACK SUPPORT BASES. <br />MODULE RACK SUPPORT BASES SHALL BE INSTALLED PER MANUFACTURER'S <br />INSTALLATION INSTRUCTIONS. <br />4. LADDER SHALL BE PROVIDED AND SECURED TO STRUCTURE FOR INSPECTION <br />PURPOSES. <br />1. ALL SOLAR ENERGY SYSTEM APPURTENANCES SUCH AS, BUT NOT LIMITED TO, <br />ELECTRICAL CONDUIT, JUNCTION BOXES, WATER TANKS, SUPPORTS, AND <br />PLUMBING SHALL BE SCREENED TO THE MAXIMUM EXTENT POSSIBLE WITHOUT <br />COMPROMISING THE EFFECTIVENESS OF THE SOLAR COLLECTORS, AND SHALL <br />BE PAINTED A COLOR SIMILAR TO THE COLOR OF THE SURFACE UPON WHICH <br />THEY ARE MOUNTED. SOLAR COLLECTORS (MODULES, INVERTERS AND RAILS) <br />ARE EXEMPT FROM THE SCREENING AND COLOR PROVISIONS OF THIS <br />SUBSECTION. <br />2. ALL ROOF-MOUNTED SOLAR COLLECTORS CAN BE MOUNTED AT AN OPTIMUM <br />ANGLE TO THE SUN FOR MAXIMUM ENERGY PRODUCTION. THE MAXIMUM <br />HEIGHT OF A SOLAR COLLECTOR SHALL BE TWO FEET, MEASURED <br />PERPENDICULAR TO THE ROOF SURFACE, AND MAY NOT EXCEED THE MAXIMUM <br />OVERALL BUILDING HEIGHT. THE REMAINDER OF THE SOLAR ENERGY SYSTEM <br />SHALL BE BELOW THE LEVEL OF THE SOLAR COLLECTOR(S). <br />1. EFFECTIVE JANUARY 1, 2015, ROOFTOP MOUNTED PV SYSTEMS SHALL BE <br />TESTED, LISTED AND IDENTIFIED WITH A FIRE CLASSIFICATION IN ACCORDANCE <br />WITH UL 1703. THE FIRE CLASSIFICATION SHALL COMPLY WITH TABLE 1505.1 <br />BASE ON THE TYPE OF CONSTRUCTION OF THE BUILDING [CALIFORNIA BUILDING <br />CODE (CBC) SECTION 1505.9]. <br />2. REPLACEMENT ROOFING UNDER SOLAR MODULE PANELS SHALL HAVE A CLASS <br />A FIRE RATING PER CITY OF IRVINE MUNICIPAL ORDINANCE NO. 16-07 AS WELL <br />AS COMPLY WITH CBC SECTION 7A CRITERIA WHERE APPLICABLE. <br />3. PER ORANGE COUNTY FIRE AUTHORITY (OCFA), METALLIC RACEWAYS SHALL BE <br />MINIMUM 18” BELOW ROOF ASSEMBLY WHEN MEASURED PARALLEL TO THE <br />SURFACE OF THE ROOF. <br />1. LISTED AND LABELED EQUIPMENT SHALL BE INSTALLED AND USED IN <br />ACCORDANCE WITH ANY INSTRUCTIONS INCLUDED IN THE LISTING OR LABELING <br />PER ART. 110.3(B) OF THE CALIFORNIA ELECTRICAL CODE (CEC). <br />2. WEEB CLIPS BY WILEY ELECTRONICS/BURNDY TO BE INSTALLED PER <br />MANUFACTURER'S INSTALLATION INSTRUCTIONS PER CEC ART. 110.3 (B). <br />3. MAINTAIN PROPER WORKING CLEARANCES FOR SOLAR EQUIPMENT PER CEC <br />ART. 110.26 & CEC TABLE 110.26(A)(1). <br />4. CENTER GRIP OF DISCONNECTS SHALL BE NO MORE THAN 6'-7” ABOVE <br />ADJACENT FLOOR OR GRADE PER CEC ART. 240.24(A). <br />5. AVOID COVERING PLUMBING VENT OPENINGS WITH SOLAR PANELS. <br />6. ALL EQUIPMENT USED SHALL BE LABELED AND LISTED BY A NATIONALLY <br />RECOGNIZED TESTING LABORATORY (E.G. UL). NO FIELD FABRICATION OF <br />COMPONENTS IS PERMITTED. <br />7. COMBINING LISTED COMPONENTS TO CREATE A NEW LISTED COMPONENT IS <br />NOT ALLOWED (E.G. PLACING LISTED FUSE HOLDERS OR PULLS INSIDE A LISTED <br />JUNCTION BOX DOES NOT MAKE A LISTED COMBINER BOX). <br />8. DISCONNECTS ON DC SIDE SHALL BE RATED FOR DC AND SERIESING OF BLADES <br />MAY BE REQUIRED FOR A 600 VDC RATING. <br />9. INTERCONNECTION PV BREAKER SHALL BE THE SAME BRAND AS SERVICE <br />PANEL. 10.GROUND LUGS FOR GROUNDING ROOF MODULES AND RAILS ARE <br />LISTED FOR ONLY A SINGLE GROUND WIRE. <br />1. ANY SPLICE IN A SOLAR MODULE RAIL SYSTEM SHALL A HAVE BONDING JUMPER <br />PER CEC ART. 250.ANY SPLICE IN A SOLAR MODULE RAIL SYSTEM SHALL A HAVE <br />BONDING JUMPER PER CEC ART. 250. <br />2. ELECTRODE GROUNDING SYSTEM SHALL BE BONDED BACK TO SERVICE'S <br />ELECTRICAL SYSTEM PER CEC ART. 250.50. AC SERVICE SHALL HAVE A GEC <br />SYSTEM AND BE BONDED TO METALLIC WATER PIPING. <br />3. WHEN MORE THAN ONE GROUNDING ELECTRODE EXISTS, ALL GROUNDING <br />ELECTRODES ARE TO BE BONDED TOGETHER PER CEC ART. 250.50 TO FORM A <br />GROUNDING ELECTRODE SYSTEM. BONDING JUMPER SIZE TO BE THE LARGER <br />OF CEC TABLE 250.66 (FOR AC) AND CEC ART. 250.166 (FOR DC). <br />4. NEW ELECTRODES SHALL BE EMBEDDED IN DIRECT CONTACT WITH SOIL A <br />MINIMUM OF 8'-0” FEET WITH 10'-0” X ¾” DIAMETER RODS WHERE ATTACHMENT IS <br />MADE ABOVE GRADE. CEC ART. 250.53(G). SPACE ELECTRODES MIN. 6'-0” APART <br />PER CEC ART. 250.53(B). <br />5. BONDING BETWEEN SUPPLEMENTAL AND SERVICE ELECTRODES SHALL BE NO <br />LARGER THAN #6 AWG PER CEC ART. 250.53(E). BONDING JUMPER TO BE <br />CONNECTED TO ELECTRODES PER CEC ART. 250.70. <br />6. BONDING BETWEEN SUPPLEMENTAL AND SERVICE ELECTRODES SHALL BE NO <br />LARGER THAN #6 AWG PER CEC ART. 250.53(E). BONDING JUMPER TO BE <br />CONNECTED TO ELECTRODES PER CEC ART. 250.70. <br />7. GROUNDING ELECTRODE CONDUCTOR (GEC) SMALLER THAN 6 AWG SHALL BE <br />PROTECTED IN RIGID METAL CONDUIT, INTERMEDIATE METAL CONDUIT, RIGID <br />NON-METALLIC CONDUIT, ELECTRICAL METALLIC TUBING, OR CABLE ARMOR. 6 <br />AWG GEC FREE FROM EXPOSURE TO PHYSICAL DAMAGE SHALL BE PERMITTED <br />TO RUN ALONG SURFACE OF BUILDING CONSTRUCTION WITHOUT METAL <br />COVERING OR PROTECTION IF SECURELY FASTENED TO CONSTRUCTION. 4 AWG <br />GEC SHALL BE PROTECTED WHERE EXPOSED FROM PHYSICAL DAMAGE. CEC <br />ART. 250.64(B). <br />CONDUCTORS AND RACEWAY <br />1. CONDUCTORS 8 AWG AND LARGER SHALL BE STRANDED WHERE INSTALLED IN <br />RACEWAYS AND CONDUIT PER CEC ART. 310.106(C). <br />2. CONDUCTORS SHALL BE LISTED FOR WET LOCATIONS PER CEC ART. 310.10(C). <br />3. PVC RACEWAYS REQUIRE EXPANSION FITTINGS AND SUPPORT STRAPS (ATTACHED TO <br />MOUNTING SURFACE WITH TWO FASTENERS) PER CEC ART. 352.30 AND CEC ART. 352.44 <br />AND MANUFACTURER'S INSTALLATION INSTRUCTIONS. <br />4. EMT SHALL BE SHALL BE FASTENED EVERY 10 FEET AND WITHIN 3 FEET OF BOXES, <br />CABINETS AND/OR TERMINATIONS PER CEC ART. 358.30(A) AND SUPPORTED EVERY 3 <br />FEET PER CEC ART. 358.30(B). <br />5. SOURCE CIRCUITS IN ATTIC ARE TO RUN IN METALLIC RACEWAY FROM ROOF <br />PENETRATION TO THE FIRST READILY ACCESSIBLE DISCONNECT MEANS PER CEC ART. <br />690.31(E). <br />MODULE RACK SUPPORT BASES <br />1. FIELD VERIFY EXISTING FRAMING MEMBER DEPTH WILL MEET PRESCRIBED LAG SCREW <br />EMBEDMENT. <br />MARKINGS/LABELS <br />1. PV WORKING PLACARDS ARE TO BE 3/8" HIGH CAPITALIZED WHITE LETTERS ON RED <br />BACKGROUND PER CEC ART. 690.31(G)(4). <br />2. PROVIDE A DIRECTORY DENOTING ALL ELECTRIC POWER SOURCES ON OR IN THE <br />PREMISES. DIRECTORY SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION <br />AND AT LOCATIONS OF ALL ELECTRIC POWER PRODUCTION SOURCES CAPABLE OF <br />BEING INTERCONNECTED PER CEC ART. 705.10. <br />RAPID SHUT DOWN <br />1. PV SYSTEMS SHALL BE INSTALLED WITH LISTED RAPID SHUT DOWN EQUIPMENT PER <br />ART. 690.12 AND LABELED PER ART. 690.56 <br />THE SITE AUDITOR SHALL VERIFY THE FOLLOWING: <br />ROOF VISUAL STRUCTURAL REVIEW OF EXISTING CONDITIONS <br />1. NO VISUALLY APPARENT DISALLOWED RAFTER HOLES, NOTCHES AND TRUSS <br />MODIFICATIONS.RAFTERS THAT FALL THIS CRITERIA SHOULD NOT BE USED TO <br />SUPPORT SOLAR ARRAYS UNLESS THEY ARE FIRST STRENGTHENED. <br />2. NO VISUALLY APPARENT STRUCTURAL DECAY OR UN-REPAIRED FIRE DAMAGE. <br />3. ROOF SAG, MEASURED IN INCHES. IS NOT MORE THAN THE RAFTER OR RIDGE <br />BEAM LENGTH IN FEET DIVIDED BY 20.RAFTERS THAT FALL THE ABOVE CRITERIA <br />SHOULD NOT BE USED TO SUPPORT SOLAR ARRAYS UNLESS THEY ARE FIRST <br />STRENGTHENED. <br />SMOKE DETECTOR SHALL BE INSTALLED: <br />1. NO CENTRALLY LOCATED. IN CORRIDOR (OR AREA) LEADING TO SLEEPING AREAS, <br />AND INSIDE EACH SLEEPING ROOM. <br />2. ON CEILING OF UPPER LEVEL IN CLOSE PROXIMITY TO THE STAIRWAY WHEN <br />SLEEPING AREAS ARE ON AN UPPER LEVEL. <br />3. ON EACH FLOOR LEVEL AND IN BASEMENT. <br />4. IN THE ADJACENT ROOM (OR AREA) WHERE THE CEILING HEIGHT EXCEEDS THAT <br />OF THE HALLWAY BY 24" OR MORE,IN THE ADJACENT ROOM (OR AREA) WHERE THE <br />CEILING HEIGHT EXCEEDS THAT OF THE HALLWAY BY 24" OR MORE. <br />5. BATTERY OPERATED SMOKE DETECTOR PERMITTED IN EXISTING CONSTRUCTION. <br />CARBON MONOXIDE SHALL BE INSTALLED: <br />1. OUTSIDE OF EACH SEPARATE DWELLING UNIT SLEEPING AREA IN THE IMMEDIATE <br />VICINITY OF THE BEDROOM(S). <br />2. ON EVERY LEVEL OF A DWELLING UNIT INCLUDING BASEMENTS. <br />3. BATTERY OPERATED CARBON MONOXIDE DETECTOR PERMITTED IN EXISTING <br />CONSTRUCTION. <br />4. WHERE A FUEL-BURNING APPLIANCE IS LOCATED WITHIN A BEDROOM OR ITS <br />ATTACHED BATHROOM, A CARBON MONOXIDE ALARM SHALL BE INSTALLED WITHIN <br />THE BEDROOM. <br />NOTES <br />1. PROVIDE ARC FAULT PROTECTION <br />2. CONDUIT(S) SHALL BE PAINTED TO MATCH SURFACE AND SHALL BE INSTALLED <br />GREATER THAN 7/8"(INCHES) ABOVE ROOF SURFACE <br />3. ALL EQUIPMENT TO BE LISTED FOR THE PURPOSE. <br />4. PROVIDE SOLAR PANEL COPPER LAY·IN GROUNDING LUG, TIN PLATED, 14-4, <br />STAINLESS STEEL SCREW, SUITABLE FOR DIRECT BURIAL. <br />5. MODULE SHALL CANTILEVER A MAX OF 18 INCHES BEYOND THE STANDOFF OR <br />PROVIDE STRUCTURAL ANALYSIS PREPARED BY A LICENSED CALIFORNIA <br />ENGINEER OR ARCHITECT. , <br />6. STANDOFF SHALL NOT BE ALLOWED TO BE INSTALLED OVER THE EAVE AREAS <br />WITHOUT A STRUCTURAL ANALYSIS PREPARED BY A LICENSED CALIFORNIA <br />ENGINEER OR ARCHITECT. <br />NOTES:8. GROUNDING ELECTRODE CONDUCTOR (GEC) SMALLER THAN 6 AWG SHALL BE <br />PROTECTED IN RIGID METAL CONDUIT, INTERMEDIATE METAL CONDUIT, RIGID <br />NON-METALLIC CONDUIT, ELECTRICAL METALLIC TUBING, OR CABLE ARMOR. 6 <br />AWG GEC FREE FROM EXPOSURE TO PHYSICAL DAMAGE SHALL BE PERMITTED <br />TO RUN ALONG SURFACE OF BUILDING CONSTRUCTION WITHOUT METAL <br />COVERING OR PROTECTION IF SECURELY FASTENED TO CONSTRUCTION. 4 AWG <br />GEC SHALL BE PROTECTED WHERE EXPOSED FROM PHYSICAL DAMAGE. CEC <br />ART. 250.64(B). <br />9. GEC SHALL BE INSTALLED IN ONE CONTINUOUS LENGTH WITHOUT JOINT OR <br />SPLICE. SPLICING SHALL BE PERMITTED ONLY BY IRREVERSIBLE <br />COMPRESSION-TYPE CONNECTORS LISTED AS GROUNDING AND BONDING <br />EQUIPMENT OR BY THE EXOTHERMIC WELDING PROCESS PER CEC ART. <br />250.64(C)(1). NOTE: IF EXCEPTION IS USED, INSPECTOR IS TO FIELD VERIFY <br />ATTACHMENT FROM EXISTING GEC TO UFER. <br />10. MICROINVERTERS: #6 AWG GEC (FREE FROM PHYSICAL DAMAGE) SHALL BE <br />INSTALLED IN ONE CONTINUOUS LENGTH WITHOUT JOINT OR SPLICE FROM ALL <br />MICROINVERTERS TO ELECTRODE; AND GROUND FOR ALL MODULES AND <br />RAILING TO BE CONTINUOUS. GEC SHALL NOT BE BROKEN AT BUS BAR. CEC ART. <br />250.64(B) & (C). SPLICING SHALL BE PERMITTED ONLY BY IRREVERSIBLE <br />COMPRESSION-TYPE CONNECTORS LISTED AS GROUNDING AND BONDING <br />EQUIPMENT OR BY EXOTHERMIC WELDING PROCESS PER CEC ART. 250.64(C)(1). <br />11. EACH END OF FERROUS RACEWAYS ENCLOSING THE GEC SHALL BE BONDED <br />PER CEC ART. 250.64(E). <br />12. GEC SHALL BE #6 AWG FOR SERVICES LARGER THAN 125A. #8 AWG OKAY FOR <br />100A SERVICE OR LESS. PER CEC TABLE 310.15(B)(7); CEC TABLE 250.66 & CEC <br />ART. 250.66(A). <br />13. EMT TO BE BONDED AT EACH END OF RACEWAY WHERE ENCOUNTERING <br />ECCENTRIC OR CONCENTRIC KNOCKOUTS PER CEC ART. 250.97. <br />14. FOR GROUNDING OF MODULES AND RAILS, EQUIPMENT GROUNDING <br />CONDUCTORS (EGC) SMALLER THAN 6 AWG SHALL BE PROTECTED FROM <br />PHYSICAL DAMAGE BY A RACEWAY OR CABLE ARMOR EXCEPT WHERE RUN IN <br />HOLLOW SPACES OF WALLS OF PARTITIONS, WHERE NOT SUBJECT TO PHYSICAL <br />DAMAGE, OR WHERE PROTECTED FROM PHYSICAL DAMAGE PER CEC ART. <br />690.46 AND CEC ART. 250.120 (C). <br />GENERAL NOTES: <br />VICINITY MAP <br />SCALE: NONE <br />INSTALLATION SITE <br />SCALE: NONE <br />SHEET INDEX: <br />PV-1 <br />PV-2 <br />PV-3 <br />PV-4 <br />PV-5 <br />PV-6 <br />PV-19 <br />COVER SHEET <br />SITE PLAN <br />ARRAY LAYOUT <br />SYSTEM SIGNS <br />SINGLE LINE DIAGRAM <br />DATA SHEETPV-7 to <br />SYSTEM SIGNS <br />THE PLANS WILL COMPLY WITH ALL 2022 PER CODE AND REQUIREMENTS OF THE <br />CITY DEPARTMENT WHERE IT IS SUBMITTED: CBC, CRC, CEC, CALGREEN & STATE <br />TITLE 24 ENERGY STANDARDS <br />2022 CALIFORNIA BUILDING CODE <br />2022 CALIFORNIA RESIDENTIAL CODE <br />2022 CALIFORNIA MECHANICAL CODE <br />2022 CALIFORNIA ELECTRICAL CODE <br />2022 CALIFORNIA PLUMBING CODE <br />2022 CALIFORNIA FIRE CODE <br />2022 CALIFORNIA ENERGY CODE <br />2022 CALIFORNIA GREEN BUILDING STANDARDS CODE <br />2022 CALIFORNIA HISTORICAL BUILDINGS CODE <br />CURRENT MUNICIPAL CODE <br />MINCHACA, JOSE LUIS <br />PHOTOVOLTAIC EQUIPMENT: <br />1.MODULES: <br />INSTALLATION TYPE: <br />AZIMUTH: <br />TILT: <br />SANTA ANA CA 92707-1830 <br />APN: 403-193-16 <br />RESIDENTIAL PHOTOVOLTAIC <br />MOUNTED ON: <br />10° <br />315 E STANFORD STREET <br />0°, 180° <br />SYSTEM DESCRIPTION <br />OVERALL SYSTEM: <br />DC RATING: <br />CEC RATING: <br />6.400 kW DC <br />5.844 kW AC <br />ROOF <br />PROPERTY DATA: <br />SQ.FT. OF ARRAY: <br />% OF ARRAY COVERAGE: <br />SQ.FT. OF ROOF: <br />NUMBER OF STORIES: <br />SPRINKLERS: <br />ZONING: <br />1 <br />337.93 <br />899 SQ.FT. <br />38% <br />NO <br />R1 <br />RACKING INFORMATION: <br />MOUNTING: <br />RAILING: <br />FLAT ROOF SYSTEM <br />XR-10 <br />MANUFACTURER:IRONRIDGE <br />MANUFACTURER: <br />QTY: <br />HANWHA Q CELLS <br />16 <br />MODEL:Q.PEAK DUO BLK ML-G10 400 <br />2.INVERTER: <br />MANUFACTURER: <br />QTY: <br />ENPHASE <br />16 <br />MODEL:IQ8PLUS-72-2-US <br />JURISDICTION:SANTA ANA <br />COVER SHEET <br />PV-1 <br />ROOF <br />The scope of the plans is for the installation of the <br />solar photovoltaic system only and the approval is <br />subject to compliance with all applicable city and state <br />codes and regulations regarding construction. The <br />approval of the plans does not constitute any <br />certification of the accuracy, completeness, or building <br />permit status of the existing buildings and structures <br />as shown. <br />Bldg# 101117843 <br />Elec# 20181796 <br /> <br />Approvals: <br />ELEC - MSmith <br />315 E Stanford St - <br />201817961/30/2024