As Noted
<br />MI
<br />N
<br />C
<br />H
<br />A
<br />C
<br />A
<br />,
<br />
<br />J
<br />O
<br />S
<br />E
<br />
<br />L
<br />U
<br />I
<br />S
<br />SA
<br />N
<br />T
<br />A
<br />
<br />A
<br />N
<br />A
<br />
<br />C
<br />A
<br />
<br />9
<br />2
<br />7
<br />0
<br />7
<br />-
<br />1
<br />8
<br />3
<br />0
<br />AP
<br />N
<br />:
<br />
<br />4
<br />0
<br />3
<br />-
<br />1
<br />9
<br />3
<br />-
<br />1
<br />6
<br />RE
<br />S
<br />I
<br />D
<br />E
<br />N
<br />T
<br />I
<br />A
<br />L
<br />
<br />P
<br />H
<br />O
<br />T
<br />O
<br />V
<br />O
<br />L
<br />T
<br />A
<br />I
<br />C
<br />31
<br />5
<br />
<br />E
<br />
<br />S
<br />T
<br />A
<br />N
<br />F
<br />O
<br />R
<br />D
<br />
<br />S
<br />T
<br />R
<br />E
<br />E
<br />T
<br />FULL SIZE PRINT: 17"x11"
<br />A
<br />REV
<br />Signature
<br />DRAWINGS PROVIDED BY:
<br />SOLAR MAX DESIGN
<br />Email: solarmax.dsgn@gmail.com
<br />Web: www.solarmaxdsgn.com
<br />Phone: (310) 740-9649(310) 844-7370 &
<br />3805 E 2ND STREET, SUITE C
<br />LONG BEACH, CA 90803
<br />CLIENT INFORMATION:
<br />PROJECT:
<br />The contractor shall provide a written letter
<br />to the building inspector stating that all
<br />inaccessible structural connections have
<br />been installed in conformance with the
<br />requirements of the approved plans.
<br />NOTE:
<br />DESCRIPTION DATE:
<br />B
<br />DATE:
<br />SCALE:
<br />SHEET TITLE:
<br />SHEET
<br />NUMBER:
<br />4/7/2023
<br />Class: C10
<br />Solar Life
<br />7129 Westport Street
<br />Riverside, California 92506
<br />Phone: (626) 353-2838
<br />License: 1073930
<br />CONTRACTOR
<br />Signature
<br />Exp: 03/31/2023
<br />INSPECTION
<br />PLANNING
<br />FIRE PROTECTION
<br />EQUIPMENT FUNCTION
<br />BONDING AND GROUNDING
<br />1. INSPECTOR TO VERIFY EXISTING FIELD CONDITIONS. MODIFICATIONS TO
<br />EXISTING PHOTOVOLTAIC (PV) SYSTEMS INCLUDE VERIFICATION OF EXISTING
<br />GROUNDING SYSTEM, BONDING REQUIREMENTS, ELECTRICAL PANEL SIZE AND
<br />OVER CURRENT PROTECTION.
<br />2. CONTRACTOR TO BE PRESENT FOR FIRST AND FINAL INSPECTIONS.
<br />3. FIRST REQUIRED INSPECTION SHALL BE FOR MODULE RACK SUPPORT BASES.
<br />MODULE RACK SUPPORT BASES SHALL BE INSTALLED PER MANUFACTURER'S
<br />INSTALLATION INSTRUCTIONS.
<br />4. LADDER SHALL BE PROVIDED AND SECURED TO STRUCTURE FOR INSPECTION
<br />PURPOSES.
<br />1. ALL SOLAR ENERGY SYSTEM APPURTENANCES SUCH AS, BUT NOT LIMITED TO,
<br />ELECTRICAL CONDUIT, JUNCTION BOXES, WATER TANKS, SUPPORTS, AND
<br />PLUMBING SHALL BE SCREENED TO THE MAXIMUM EXTENT POSSIBLE WITHOUT
<br />COMPROMISING THE EFFECTIVENESS OF THE SOLAR COLLECTORS, AND SHALL
<br />BE PAINTED A COLOR SIMILAR TO THE COLOR OF THE SURFACE UPON WHICH
<br />THEY ARE MOUNTED. SOLAR COLLECTORS (MODULES, INVERTERS AND RAILS)
<br />ARE EXEMPT FROM THE SCREENING AND COLOR PROVISIONS OF THIS
<br />SUBSECTION.
<br />2. ALL ROOF-MOUNTED SOLAR COLLECTORS CAN BE MOUNTED AT AN OPTIMUM
<br />ANGLE TO THE SUN FOR MAXIMUM ENERGY PRODUCTION. THE MAXIMUM
<br />HEIGHT OF A SOLAR COLLECTOR SHALL BE TWO FEET, MEASURED
<br />PERPENDICULAR TO THE ROOF SURFACE, AND MAY NOT EXCEED THE MAXIMUM
<br />OVERALL BUILDING HEIGHT. THE REMAINDER OF THE SOLAR ENERGY SYSTEM
<br />SHALL BE BELOW THE LEVEL OF THE SOLAR COLLECTOR(S).
<br />1. EFFECTIVE JANUARY 1, 2015, ROOFTOP MOUNTED PV SYSTEMS SHALL BE
<br />TESTED, LISTED AND IDENTIFIED WITH A FIRE CLASSIFICATION IN ACCORDANCE
<br />WITH UL 1703. THE FIRE CLASSIFICATION SHALL COMPLY WITH TABLE 1505.1
<br />BASE ON THE TYPE OF CONSTRUCTION OF THE BUILDING [CALIFORNIA BUILDING
<br />CODE (CBC) SECTION 1505.9].
<br />2. REPLACEMENT ROOFING UNDER SOLAR MODULE PANELS SHALL HAVE A CLASS
<br />A FIRE RATING PER CITY OF IRVINE MUNICIPAL ORDINANCE NO. 16-07 AS WELL
<br />AS COMPLY WITH CBC SECTION 7A CRITERIA WHERE APPLICABLE.
<br />3. PER ORANGE COUNTY FIRE AUTHORITY (OCFA), METALLIC RACEWAYS SHALL BE
<br />MINIMUM 18” BELOW ROOF ASSEMBLY WHEN MEASURED PARALLEL TO THE
<br />SURFACE OF THE ROOF.
<br />1. LISTED AND LABELED EQUIPMENT SHALL BE INSTALLED AND USED IN
<br />ACCORDANCE WITH ANY INSTRUCTIONS INCLUDED IN THE LISTING OR LABELING
<br />PER ART. 110.3(B) OF THE CALIFORNIA ELECTRICAL CODE (CEC).
<br />2. WEEB CLIPS BY WILEY ELECTRONICS/BURNDY TO BE INSTALLED PER
<br />MANUFACTURER'S INSTALLATION INSTRUCTIONS PER CEC ART. 110.3 (B).
<br />3. MAINTAIN PROPER WORKING CLEARANCES FOR SOLAR EQUIPMENT PER CEC
<br />ART. 110.26 & CEC TABLE 110.26(A)(1).
<br />4. CENTER GRIP OF DISCONNECTS SHALL BE NO MORE THAN 6'-7” ABOVE
<br />ADJACENT FLOOR OR GRADE PER CEC ART. 240.24(A).
<br />5. AVOID COVERING PLUMBING VENT OPENINGS WITH SOLAR PANELS.
<br />6. ALL EQUIPMENT USED SHALL BE LABELED AND LISTED BY A NATIONALLY
<br />RECOGNIZED TESTING LABORATORY (E.G. UL). NO FIELD FABRICATION OF
<br />COMPONENTS IS PERMITTED.
<br />7. COMBINING LISTED COMPONENTS TO CREATE A NEW LISTED COMPONENT IS
<br />NOT ALLOWED (E.G. PLACING LISTED FUSE HOLDERS OR PULLS INSIDE A LISTED
<br />JUNCTION BOX DOES NOT MAKE A LISTED COMBINER BOX).
<br />8. DISCONNECTS ON DC SIDE SHALL BE RATED FOR DC AND SERIESING OF BLADES
<br />MAY BE REQUIRED FOR A 600 VDC RATING.
<br />9. INTERCONNECTION PV BREAKER SHALL BE THE SAME BRAND AS SERVICE
<br />PANEL. 10.GROUND LUGS FOR GROUNDING ROOF MODULES AND RAILS ARE
<br />LISTED FOR ONLY A SINGLE GROUND WIRE.
<br />1. ANY SPLICE IN A SOLAR MODULE RAIL SYSTEM SHALL A HAVE BONDING JUMPER
<br />PER CEC ART. 250.ANY SPLICE IN A SOLAR MODULE RAIL SYSTEM SHALL A HAVE
<br />BONDING JUMPER PER CEC ART. 250.
<br />2. ELECTRODE GROUNDING SYSTEM SHALL BE BONDED BACK TO SERVICE'S
<br />ELECTRICAL SYSTEM PER CEC ART. 250.50. AC SERVICE SHALL HAVE A GEC
<br />SYSTEM AND BE BONDED TO METALLIC WATER PIPING.
<br />3. WHEN MORE THAN ONE GROUNDING ELECTRODE EXISTS, ALL GROUNDING
<br />ELECTRODES ARE TO BE BONDED TOGETHER PER CEC ART. 250.50 TO FORM A
<br />GROUNDING ELECTRODE SYSTEM. BONDING JUMPER SIZE TO BE THE LARGER
<br />OF CEC TABLE 250.66 (FOR AC) AND CEC ART. 250.166 (FOR DC).
<br />4. NEW ELECTRODES SHALL BE EMBEDDED IN DIRECT CONTACT WITH SOIL A
<br />MINIMUM OF 8'-0” FEET WITH 10'-0” X ¾” DIAMETER RODS WHERE ATTACHMENT IS
<br />MADE ABOVE GRADE. CEC ART. 250.53(G). SPACE ELECTRODES MIN. 6'-0” APART
<br />PER CEC ART. 250.53(B).
<br />5. BONDING BETWEEN SUPPLEMENTAL AND SERVICE ELECTRODES SHALL BE NO
<br />LARGER THAN #6 AWG PER CEC ART. 250.53(E). BONDING JUMPER TO BE
<br />CONNECTED TO ELECTRODES PER CEC ART. 250.70.
<br />6. BONDING BETWEEN SUPPLEMENTAL AND SERVICE ELECTRODES SHALL BE NO
<br />LARGER THAN #6 AWG PER CEC ART. 250.53(E). BONDING JUMPER TO BE
<br />CONNECTED TO ELECTRODES PER CEC ART. 250.70.
<br />7. GROUNDING ELECTRODE CONDUCTOR (GEC) SMALLER THAN 6 AWG SHALL BE
<br />PROTECTED IN RIGID METAL CONDUIT, INTERMEDIATE METAL CONDUIT, RIGID
<br />NON-METALLIC CONDUIT, ELECTRICAL METALLIC TUBING, OR CABLE ARMOR. 6
<br />AWG GEC FREE FROM EXPOSURE TO PHYSICAL DAMAGE SHALL BE PERMITTED
<br />TO RUN ALONG SURFACE OF BUILDING CONSTRUCTION WITHOUT METAL
<br />COVERING OR PROTECTION IF SECURELY FASTENED TO CONSTRUCTION. 4 AWG
<br />GEC SHALL BE PROTECTED WHERE EXPOSED FROM PHYSICAL DAMAGE. CEC
<br />ART. 250.64(B).
<br />CONDUCTORS AND RACEWAY
<br />1. CONDUCTORS 8 AWG AND LARGER SHALL BE STRANDED WHERE INSTALLED IN
<br />RACEWAYS AND CONDUIT PER CEC ART. 310.106(C).
<br />2. CONDUCTORS SHALL BE LISTED FOR WET LOCATIONS PER CEC ART. 310.10(C).
<br />3. PVC RACEWAYS REQUIRE EXPANSION FITTINGS AND SUPPORT STRAPS (ATTACHED TO
<br />MOUNTING SURFACE WITH TWO FASTENERS) PER CEC ART. 352.30 AND CEC ART. 352.44
<br />AND MANUFACTURER'S INSTALLATION INSTRUCTIONS.
<br />4. EMT SHALL BE SHALL BE FASTENED EVERY 10 FEET AND WITHIN 3 FEET OF BOXES,
<br />CABINETS AND/OR TERMINATIONS PER CEC ART. 358.30(A) AND SUPPORTED EVERY 3
<br />FEET PER CEC ART. 358.30(B).
<br />5. SOURCE CIRCUITS IN ATTIC ARE TO RUN IN METALLIC RACEWAY FROM ROOF
<br />PENETRATION TO THE FIRST READILY ACCESSIBLE DISCONNECT MEANS PER CEC ART.
<br />690.31(E).
<br />MODULE RACK SUPPORT BASES
<br />1. FIELD VERIFY EXISTING FRAMING MEMBER DEPTH WILL MEET PRESCRIBED LAG SCREW
<br />EMBEDMENT.
<br />MARKINGS/LABELS
<br />1. PV WORKING PLACARDS ARE TO BE 3/8" HIGH CAPITALIZED WHITE LETTERS ON RED
<br />BACKGROUND PER CEC ART. 690.31(G)(4).
<br />2. PROVIDE A DIRECTORY DENOTING ALL ELECTRIC POWER SOURCES ON OR IN THE
<br />PREMISES. DIRECTORY SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION
<br />AND AT LOCATIONS OF ALL ELECTRIC POWER PRODUCTION SOURCES CAPABLE OF
<br />BEING INTERCONNECTED PER CEC ART. 705.10.
<br />RAPID SHUT DOWN
<br />1. PV SYSTEMS SHALL BE INSTALLED WITH LISTED RAPID SHUT DOWN EQUIPMENT PER
<br />ART. 690.12 AND LABELED PER ART. 690.56
<br />THE SITE AUDITOR SHALL VERIFY THE FOLLOWING:
<br />ROOF VISUAL STRUCTURAL REVIEW OF EXISTING CONDITIONS
<br />1. NO VISUALLY APPARENT DISALLOWED RAFTER HOLES, NOTCHES AND TRUSS
<br />MODIFICATIONS.RAFTERS THAT FALL THIS CRITERIA SHOULD NOT BE USED TO
<br />SUPPORT SOLAR ARRAYS UNLESS THEY ARE FIRST STRENGTHENED.
<br />2. NO VISUALLY APPARENT STRUCTURAL DECAY OR UN-REPAIRED FIRE DAMAGE.
<br />3. ROOF SAG, MEASURED IN INCHES. IS NOT MORE THAN THE RAFTER OR RIDGE
<br />BEAM LENGTH IN FEET DIVIDED BY 20.RAFTERS THAT FALL THE ABOVE CRITERIA
<br />SHOULD NOT BE USED TO SUPPORT SOLAR ARRAYS UNLESS THEY ARE FIRST
<br />STRENGTHENED.
<br />SMOKE DETECTOR SHALL BE INSTALLED:
<br />1. NO CENTRALLY LOCATED. IN CORRIDOR (OR AREA) LEADING TO SLEEPING AREAS,
<br />AND INSIDE EACH SLEEPING ROOM.
<br />2. ON CEILING OF UPPER LEVEL IN CLOSE PROXIMITY TO THE STAIRWAY WHEN
<br />SLEEPING AREAS ARE ON AN UPPER LEVEL.
<br />3. ON EACH FLOOR LEVEL AND IN BASEMENT.
<br />4. IN THE ADJACENT ROOM (OR AREA) WHERE THE CEILING HEIGHT EXCEEDS THAT
<br />OF THE HALLWAY BY 24" OR MORE,IN THE ADJACENT ROOM (OR AREA) WHERE THE
<br />CEILING HEIGHT EXCEEDS THAT OF THE HALLWAY BY 24" OR MORE.
<br />5. BATTERY OPERATED SMOKE DETECTOR PERMITTED IN EXISTING CONSTRUCTION.
<br />CARBON MONOXIDE SHALL BE INSTALLED:
<br />1. OUTSIDE OF EACH SEPARATE DWELLING UNIT SLEEPING AREA IN THE IMMEDIATE
<br />VICINITY OF THE BEDROOM(S).
<br />2. ON EVERY LEVEL OF A DWELLING UNIT INCLUDING BASEMENTS.
<br />3. BATTERY OPERATED CARBON MONOXIDE DETECTOR PERMITTED IN EXISTING
<br />CONSTRUCTION.
<br />4. WHERE A FUEL-BURNING APPLIANCE IS LOCATED WITHIN A BEDROOM OR ITS
<br />ATTACHED BATHROOM, A CARBON MONOXIDE ALARM SHALL BE INSTALLED WITHIN
<br />THE BEDROOM.
<br />NOTES
<br />1. PROVIDE ARC FAULT PROTECTION
<br />2. CONDUIT(S) SHALL BE PAINTED TO MATCH SURFACE AND SHALL BE INSTALLED
<br />GREATER THAN 7/8"(INCHES) ABOVE ROOF SURFACE
<br />3. ALL EQUIPMENT TO BE LISTED FOR THE PURPOSE.
<br />4. PROVIDE SOLAR PANEL COPPER LAY·IN GROUNDING LUG, TIN PLATED, 14-4,
<br />STAINLESS STEEL SCREW, SUITABLE FOR DIRECT BURIAL.
<br />5. MODULE SHALL CANTILEVER A MAX OF 18 INCHES BEYOND THE STANDOFF OR
<br />PROVIDE STRUCTURAL ANALYSIS PREPARED BY A LICENSED CALIFORNIA
<br />ENGINEER OR ARCHITECT. ,
<br />6. STANDOFF SHALL NOT BE ALLOWED TO BE INSTALLED OVER THE EAVE AREAS
<br />WITHOUT A STRUCTURAL ANALYSIS PREPARED BY A LICENSED CALIFORNIA
<br />ENGINEER OR ARCHITECT.
<br />NOTES:8. GROUNDING ELECTRODE CONDUCTOR (GEC) SMALLER THAN 6 AWG SHALL BE
<br />PROTECTED IN RIGID METAL CONDUIT, INTERMEDIATE METAL CONDUIT, RIGID
<br />NON-METALLIC CONDUIT, ELECTRICAL METALLIC TUBING, OR CABLE ARMOR. 6
<br />AWG GEC FREE FROM EXPOSURE TO PHYSICAL DAMAGE SHALL BE PERMITTED
<br />TO RUN ALONG SURFACE OF BUILDING CONSTRUCTION WITHOUT METAL
<br />COVERING OR PROTECTION IF SECURELY FASTENED TO CONSTRUCTION. 4 AWG
<br />GEC SHALL BE PROTECTED WHERE EXPOSED FROM PHYSICAL DAMAGE. CEC
<br />ART. 250.64(B).
<br />9. GEC SHALL BE INSTALLED IN ONE CONTINUOUS LENGTH WITHOUT JOINT OR
<br />SPLICE. SPLICING SHALL BE PERMITTED ONLY BY IRREVERSIBLE
<br />COMPRESSION-TYPE CONNECTORS LISTED AS GROUNDING AND BONDING
<br />EQUIPMENT OR BY THE EXOTHERMIC WELDING PROCESS PER CEC ART.
<br />250.64(C)(1). NOTE: IF EXCEPTION IS USED, INSPECTOR IS TO FIELD VERIFY
<br />ATTACHMENT FROM EXISTING GEC TO UFER.
<br />10. MICROINVERTERS: #6 AWG GEC (FREE FROM PHYSICAL DAMAGE) SHALL BE
<br />INSTALLED IN ONE CONTINUOUS LENGTH WITHOUT JOINT OR SPLICE FROM ALL
<br />MICROINVERTERS TO ELECTRODE; AND GROUND FOR ALL MODULES AND
<br />RAILING TO BE CONTINUOUS. GEC SHALL NOT BE BROKEN AT BUS BAR. CEC ART.
<br />250.64(B) & (C). SPLICING SHALL BE PERMITTED ONLY BY IRREVERSIBLE
<br />COMPRESSION-TYPE CONNECTORS LISTED AS GROUNDING AND BONDING
<br />EQUIPMENT OR BY EXOTHERMIC WELDING PROCESS PER CEC ART. 250.64(C)(1).
<br />11. EACH END OF FERROUS RACEWAYS ENCLOSING THE GEC SHALL BE BONDED
<br />PER CEC ART. 250.64(E).
<br />12. GEC SHALL BE #6 AWG FOR SERVICES LARGER THAN 125A. #8 AWG OKAY FOR
<br />100A SERVICE OR LESS. PER CEC TABLE 310.15(B)(7); CEC TABLE 250.66 & CEC
<br />ART. 250.66(A).
<br />13. EMT TO BE BONDED AT EACH END OF RACEWAY WHERE ENCOUNTERING
<br />ECCENTRIC OR CONCENTRIC KNOCKOUTS PER CEC ART. 250.97.
<br />14. FOR GROUNDING OF MODULES AND RAILS, EQUIPMENT GROUNDING
<br />CONDUCTORS (EGC) SMALLER THAN 6 AWG SHALL BE PROTECTED FROM
<br />PHYSICAL DAMAGE BY A RACEWAY OR CABLE ARMOR EXCEPT WHERE RUN IN
<br />HOLLOW SPACES OF WALLS OF PARTITIONS, WHERE NOT SUBJECT TO PHYSICAL
<br />DAMAGE, OR WHERE PROTECTED FROM PHYSICAL DAMAGE PER CEC ART.
<br />690.46 AND CEC ART. 250.120 (C).
<br />GENERAL NOTES:
<br />VICINITY MAP
<br />SCALE: NONE
<br />INSTALLATION SITE
<br />SCALE: NONE
<br />SHEET INDEX:
<br />PV-1
<br />PV-2
<br />PV-3
<br />PV-4
<br />PV-5
<br />PV-6
<br />PV-19
<br />COVER SHEET
<br />SITE PLAN
<br />ARRAY LAYOUT
<br />SYSTEM SIGNS
<br />SINGLE LINE DIAGRAM
<br />DATA SHEETPV-7 to
<br />SYSTEM SIGNS
<br />THE PLANS WILL COMPLY WITH ALL 2022 PER CODE AND REQUIREMENTS OF THE
<br />CITY DEPARTMENT WHERE IT IS SUBMITTED: CBC, CRC, CEC, CALGREEN & STATE
<br />TITLE 24 ENERGY STANDARDS
<br />2022 CALIFORNIA BUILDING CODE
<br />2022 CALIFORNIA RESIDENTIAL CODE
<br />2022 CALIFORNIA MECHANICAL CODE
<br />2022 CALIFORNIA ELECTRICAL CODE
<br />2022 CALIFORNIA PLUMBING CODE
<br />2022 CALIFORNIA FIRE CODE
<br />2022 CALIFORNIA ENERGY CODE
<br />2022 CALIFORNIA GREEN BUILDING STANDARDS CODE
<br />2022 CALIFORNIA HISTORICAL BUILDINGS CODE
<br />CURRENT MUNICIPAL CODE
<br />MINCHACA, JOSE LUIS
<br />PHOTOVOLTAIC EQUIPMENT:
<br />1.MODULES:
<br />INSTALLATION TYPE:
<br />AZIMUTH:
<br />TILT:
<br />SANTA ANA CA 92707-1830
<br />APN: 403-193-16
<br />RESIDENTIAL PHOTOVOLTAIC
<br />MOUNTED ON:
<br />10°
<br />315 E STANFORD STREET
<br />0°, 180°
<br />SYSTEM DESCRIPTION
<br />OVERALL SYSTEM:
<br />DC RATING:
<br />CEC RATING:
<br />6.400 kW DC
<br />5.844 kW AC
<br />ROOF
<br />PROPERTY DATA:
<br />SQ.FT. OF ARRAY:
<br />% OF ARRAY COVERAGE:
<br />SQ.FT. OF ROOF:
<br />NUMBER OF STORIES:
<br />SPRINKLERS:
<br />ZONING:
<br />1
<br />337.93
<br />899 SQ.FT.
<br />38%
<br />NO
<br />R1
<br />RACKING INFORMATION:
<br />MOUNTING:
<br />RAILING:
<br />FLAT ROOF SYSTEM
<br />XR-10
<br />MANUFACTURER:IRONRIDGE
<br />MANUFACTURER:
<br />QTY:
<br />HANWHA Q CELLS
<br />16
<br />MODEL:Q.PEAK DUO BLK ML-G10 400
<br />2.INVERTER:
<br />MANUFACTURER:
<br />QTY:
<br />ENPHASE
<br />16
<br />MODEL:IQ8PLUS-72-2-US
<br />JURISDICTION:SANTA ANA
<br />COVER SHEET
<br />PV-1
<br />ROOF
<br />The scope of the plans is for the installation of the
<br />solar photovoltaic system only and the approval is
<br />subject to compliance with all applicable city and state
<br />codes and regulations regarding construction. The
<br />approval of the plans does not constitute any
<br />certification of the accuracy, completeness, or building
<br />permit status of the existing buildings and structures
<br />as shown.
<br />Bldg# 101117843
<br />Elec# 20181796
<br />
<br />Approvals:
<br />ELEC - MSmith
<br />315 E Stanford St -
<br />201817961/30/2024
|