Laserfiche WebLink
Project : <br />Project Number: <br />By : <br />Date : <br />Roof Dead Load <br />Roof Slope =: <br />Angle = <br />Roof Live Load <br />Roof Live Load = psf (Refer ASCE 7-16, Table 4.3-1) <br />Roof Live Load with PV Array = psf 2019 CBC, Section 1607.13.5 <br />(Ceiling load and MEP is assumed to be not supported by rafter) <br />20 <br />0 <br />PV Array 3 1.00 <br />2.2 1.00 <br />MEP & Misc.1.5 <br />Rolled Comp 4 1.00 <br />0.6 12 <br />3 <br />Material <br />Material Weight <br />(psf) <br />2.20 <br />1.50 <br />12.31 <br />1/2" Plywood 1.1 1.00 <br />Framing 3 1.00 <br />3.00 <br />1/2" Gypsum Ceiling <br />Eugenio Sanchez <br />PE <br />25-10-2022 <br />DL = <br />Increase due to <br />Roof Slope <br />Plan Projected Materal <br />Weight (psf) <br />4.00 <br />1.10 <br />3.00 <br />0.50Insulation0.5 1.00 <br />306 W Alpine Ave <br />12/27/22