My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
317 E Berkeley St - Plan
PBA
>
Building
>
ProjectDox
>
B
>
Berkeley St
>
317 E Berkeley St
>
317 E Berkeley St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:06:49 PM
Creation date
6/1/2025 12:06:37 PM
Metadata
Fields
Template:
Plan
Permit Number
20179350
101114710
Full Address
317 E Berkeley St
Document Relationships
101114710 - Permit
(Permit - Plan)
Path:
\Building\Permits\B\Berkeley St\317 E Berkeley St
20179350 - Permit
(Permit - Plan)
Path:
\Building\Permits\B\Berkeley St\317 E Berkeley St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project : <br />Project Number: <br />By : <br />Date : <br />UNIRAC <br />1411 Broadway Blvd, NE <br />Albuquerque, NM 87102 <br />RE: Solar Array Installation at 317 E Berkeley St, Santa Ana, CA, 92707, USA <br />To Whom it May Concern, <br />CODE REFERENCES: <br />BUILDING CODE: 2022 CALIFORNIA BUILDING CODE <br />2021 INTERNATIONAL BUILDING CODE <br />ASCE 7-16 <br />SCOPE OF WORK: <br />DESIGN PARAMETERS <br />RISK CATEGORY : <br />DESIGN WIND SPEED :mph <br />WIND EXPOSURE : <br />GROUND SNOW LOAD :psf <br />SEISMIC DESIGN CATEGORY : <br />EXISTING ROOF STRUCTURE <br />ROOF : 2x4 Rafters @ 24" O.C. <br />ROOF MATERIAL : Asphalt Shingles <br />CONNECTION TO ROOF STRUCTURE <br />MOUNTING CONNECTION : <br /> Gabriel Zacatelco <br />PE <br />21-03-2023 <br />Roof structural framing plan has been reviewed for additional loading due to installation of the roof mounted <br />solar PV addition. The structural review that follows, including plans and calculations, only apply to the section <br />of the roof that is directly supporting the solar PV system and its supporting elements. <br />21 March 2023 <br />Per your request, we have reviewed the existing structure at the above referenced site. The purpose of our <br />review was to determine the adequacy of the existing structure to support the proposed installation of solar <br />panels on the roof per layout plan. <br />(1) 5/16" SS LAG BOLT w/ MIN. 2.5" EMBEDMENT INTO (E) 2x FRAMING <br />MEMBER @ MAX. 48" O.C. ALONG RAILS <br />(2) RAILS PER ROW OF PANELS, EVENLY SPACED. PANEL LENGTH <br />PERPENDICULAR TO RAIL NOT TO EXCEED 67.79" <br />II <br />95 <br />B <br />0 <br />*null <br />317 E Berkeley St <br />04/18/23
The URL can be used to link to this page
Your browser does not support the video tag.