Laserfiche WebLink
PROJECT Pace Supply <br />FOR The Beacon Group <br />SHEET NO. <br />CALCULATED BY <br />DATE <br />ARM ANALYSIS:  <br /> CHECK BENDING <br /> LB  LOAD, I= <br /> * L/2 <br /> LB * (48 IN)/2 <br /> IN‐LB <br /> PSI <br />‐eff= PSI <br /> = IN‐LB/1.68 IN^3  S 3x5.7 <br /> = PSI  IN <br /> IN <br />fb/Fb=0.62 ≤ 1.0 OK  IN^4 <br /> IN^3 <br /> CHECK DEFLECTION  PSI <br /> LB  IN <br /> IN <br /> = IN <br /> DEFLECTION= <br /> = IN OK <br /> CHECK CONNECTION <br /> EFFECT OF ARM MOMENT ON BOLTED CONNECTION <br />  <br /> DIAM= IN <br /> BOLT= <br /> PSI   <br /> PSI <br /> PLATE  <br /> IN <br /> IS MINIMUM OF TENSION AND BEARING CAPACITY <br /> CAP= AREA*2 <br /> PSI*(0.625 IN)^2*(∏/4)*2 <br /> LB <br /> CAP= AREA*2 <br /> PSI*0.625 IN*0.5 IN *2 <br /> LB <br /> LB <br /> * D1  IN <br /> IN‐LB OK  IN <br />MATERIAL HANDLING ENGINEERING <br />TEL: (909) 869‐0989 <br />1130 E. CYPRESS STREET, COVINA, CA 91724 <br />INC. <br />SEIZMIC <br />3421 W Segerstrom Ave - <br />10111647610/31/2023