Laserfiche WebLink
PROJECT Pace Supply <br />FOR The Beacon Group <br />SHEET NO. <br />CALCULATED BY <br />DATE <br />BASE ANALYSIS:  <br /> CHECK BASE MEMBER <br /> IN‐LB <br /> = IN‐LB/17.1 IN^3 <br /> = PSI BASE <br /> 12x16 <br /> IN <br /> = PSI  IN <br /> IN <br />fb/Fb =0.51  ≤  1.0  OK  IN^3 <br /> PSI <br /> CHECK BASE TO COLUMN CONNECTION  Ø = IN <br /> Area = IN^2 <br />CAPACITY OF 2 LINE (2) 3/4"Ø GRD. 5 BOLTS AT 2" O.C. of Bolts/Line = <br /> = PSI <br /> = x AREA x # of BOLTS  = PSI <br /> PSI x 0.442 IN^2 x 2  = PSI <br /> LB  = <br /> = IN <br />Mcap = x ( d1 + d2^2/d1 + d3^2/d1 + d4^2/d1 + d5^2/d1) = IN <br /> LB x (11 + 0.1 + 0 + 0 + 0) IN  = IN <br /> IN‐LB >  Mbase, OK  = IN <br /> = IN <br /> =0.61  ≤  1.0  OK <br />MATERIAL HANDLING ENGINEERING <br />TEL: (909) 869‐0989 <br />1130 E. CYPRESS STREET, COVINA, CA 91724 <br />INC. <br />SEIZMIC <br />3421 W Segerstrom Ave - <br />10111647610/31/2023