Laserfiche WebLink
PROJECT Pace Supply <br />FOR The Beacon Group <br />SHEET NO.42 <br />CALCULATED BY TC <br />DATE <br />Stockroom Shelving <br /> Scope: <br />The purpose of this analysis is to show that the following light duty storage fixtures complies with the specifications <br />set forth in the 2022 CBC. <br />The light duty storage fixtures are prefabricated and are to be field installed only without any field welding. <br /> Parameters: <br />The system will be analyzed for seismic loading utilizing the following equation: <br />V =Cs x Ws <br />Cs =SDS x I / R <br />SDS =2/3 x Fa x Ss <br />I =1 <br />R =4 <br /> Factors: <br />Fa =Fv =2.40 <br />Ss =S1 =0.03 <br /> Specifications: <br />Steel ‐Fy = 36,000 PSI <br />Bolts ‐A307 UNLESS OTHERWISE NOTED <br />Anchors ‐3/8"Ø x 2‐3/8" min. embedment Hilti KB1 (ESR‐678) <br />Slab ‐6 IN x 3000 PSI <br />Soil ‐1,000 PSF <br />Shelving 8 600 LB 4,800 LB <br /> Area <br />38"W x 24"D x 87"H <br />MATERIAL HANDLING ENGINEERING <br />TEL: (909) 869‐0989 <br />1130 E. CYPRESS STREET, COVINA, CA 91724 <br />INC. <br />SEIZMIC <br />3421 W Segerstrom Ave - <br />10111647610/31/2023