Laserfiche WebLink
PROJECT Pace Supply <br />FOR The Beacon Group <br />SHEET NO.49 <br />CALCULATED BY TC <br />DATE <br />LRFD Load Combination ‐ Slab System <br />Load combination per RMI 2.2 Resultant Load combination <br />1 1.4DL + 1.2PL 1.4DL + 1.2PL <br />2 1.2DL + 1.6PL + 1.6LL + 0.5(Lr or SL or RL)1.2DL + 1.6PL + 1.6LL <br />3 1.2DL + 0.85PL + (0.5LL or 0.8WL) + 1.6(Lr or SL or RL)1.2DL + 0.85PL + 0.5LL <br />4 1.2DL + 0.85PL + 0.5LL + 1.6WL + 0.5(Lr or Sl or RL)1.2DL + 0.85PL + 0.5LL <br />5 (1.2+0.2SDS)DL + (0.85+0.2SDS)PL + 0.5LL + EL + 0.2SL (1.2+0.2SDS)DL + (0.85+0.2SDS)PL + 0.5LL + EL <br />6 (0.9‐0.2SDS)DL + (0.9‐0.2SDS)PLapp ‐ EL (0.9‐0.2SDS)DL + (0.9‐0.2SDS)PLapp ‐ EL <br /># of LEVELS = <br />DL‐total/col =40 LB <br />PL‐total/col =2,400 LB <br />LL‐total/col =0 LB <br />EL =2,207 LB <=== Movt. / Depth <br /> combination 1 <br />Pmax =1.4DL + 1.2PL <br />=1.4 x 40 LB + 1.2 x 2400 LB <br />=2,936 LB <br /> combination 2 <br />Pmax =1.2DL + 1.6PL + 1.6LL <br />=1.2 x 40 LB + 1.6 x 2400 LB +1.6 x 0 LB <br />=3,888 LB <br /> combination 3 & 4 <br />Pmax =1.2DL + 0.85PL + 0.5LL <br />=1.2 x 40 LB + 0.85 x 2400 LB + 0.5 x 0 LB <br />=2,088 LB <br /> combination 5 <br />Pmax =(1.2+0.2SDS)DL + (0.85+0.2SDS)PL + 0.5LL + EL <br />=(1.2+0.2*1.05) x 40 LB + (0.85+0.2*1.05) x 2400 LB + 0.5 x 0 LB + 1.0 x 2207 LB <br />=4,807 LB <br /> combination 6 <br />Pmax =(0.9‐0.2SDS)DL + (0.9‐0.2SDS)PLapp ‐ EL <br />=(0.9‐0.2*1.05) x 40 LB + (0.9‐0.2*1.05) x 1608 LB ‐ 2206.672 LB <br />=‐1,159 LB <br />MATERIAL HANDLING ENGINEERING <br />TEL: (909) 869‐0989 <br />1130 E. CYPRESS STREET, COVINA, CA 91724 <br />INC. <br />SEIZMIC <br />3421 W Segerstrom Ave - <br />10111647610/31/2023