My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3600 W Segerstrom Ave - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Segerstrom Ave
>
3600 W Segerstrom Ave
>
3600 W Segerstrom Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:07:40 PM
Creation date
6/1/2025 12:07:33 PM
Metadata
Fields
Template:
Plan
Permit Number
20181380
101117310
Full Address
3600 W Segerstrom Ave
Document Relationships
101117310 - Permit
(Permit - Plan)
Path:
\Building\Permits\S\Segerstrom Ave\3600 W Segerstrom Ave
20181380 - Permit
(Permit - Plan)
Path:
\Building\Permits\S\Segerstrom Ave\3600 W Segerstrom Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project: Santa Ana -- Job #: 2023-10986 <br />Date: 9/12/2023 Engineer: BV <br />Area covered by the array:9753.2 sq. ft. <br />Area of PV panels:7479.5 sq. ft. <br />% of array area that is covered by panels:76.7% <br />Specified Roof Live Load:Lo =20.0 psf <br />Live Load Replacement Allowed?Yes <br />Roof live load reduction (CBC 1607.12.2.1)R1 =0.60 <br />R2 =1.00 <br />Lr =12.0 psf <br />Uniform Roof Snow Load:0.0 psf <br />Existing Roof Dead Load:12.00 psf <br />Roof Live Load Duration Factor (Wood):1.25 (NDS Table 2.3.2) <br />Dead Load Duration Factor (Wood):0.9 (NDS Table 2.3.2) <br />Existing Roof Load (Total including Duration Factors)22.9 psf <br />Live Load Replacement: 76.7% * (12 / 1.25) =7.4 psf <br />Allowable 5% increase per IBC 3403.3 1.15 psf <br />Allowable Load Increase or Replacement:8.51 psf <br />Max Allowable Added Dead Load:7.66 psf <br />Max Allowable Added Dead Load:7.66 psf <br />Ballasted PV Array Dead Load:4.85 psf <br />4.85 psf < 7.66 psf, Therefore OK <br />Load replacement check <br />Per CEBC 502.4 and by inspection, portions of the roof that are impacted by installation of the array will be <br />subject to a net reduction in design loading. Therefore, the existing structure may remain unaltered. <br />Santa Ana Gravity Check (CEBC 502.4): <br />Due to operational constraints of the PV panels, live loads are not permitted to be placed on the PV panels. <br />Therefore, in the area of the array, the change in loading is as follows: <br />Page 51 of 52 <br />3600 W Segerstrom Ave - <br />101117310 & 201813801/11/2024
The URL can be used to link to this page
Your browser does not support the video tag.