Laserfiche WebLink
(E) GEC <br />240V From Utility <br />GEC IN AC EQUIPMENT <br />GROUNDING BUS, IRREVERSIBLY <br />SPLICED TO EXISTING GEC OR <br />BONDED DIRECTLY TO EXISTING <br />GROUNDING ELECTRODE <br />(E)100 MAIN SERVICE PANEL <br />FED FROM UNDERGROUND <br />WILL BE UPGRADED TO <br />(N)200A MAIN SERVICE PANEL <br />(N)200A MAIN BREAKER END FED <br />(N)30A/2P PV BREAKER TO BE <br />INSTALLED ON THE OPPOSITE <br />END OF MAIN BREAKER <br />CONFIRM ON SITE UFER GROUNDING <br />OR) SHOULD BE TWO SEPARATE <br />GROUND RODS MIN 6'-00" IN BETWEEN <br />(N)30A/2P PV BREAKER <br />-+-+-+-+ <br />STRING 2 <br /> MODULES <br />==== <br />ENVOY COMBINER BOX <br />A 2P <br />PV BACKFEED <br />(N) <br />A 2P <br />PV BACKFEED <br />(N) <br />~ <br />= <br />~ <br />= <br />~ <br />= <br />~ <br />WEATHERPROOF J-BOX/ <br />WIRE TRANSITION POINT <br />NEMA 4X <br />Wires in free air <br />(2) #12 AWG THWN-2 Wire & <br />(1) #6 BARE COPPER <br />[A] <br />[B] 3/4" EMT Conduit <br />(4) #10 AWG THWN-2 Wire <br />(1) #8 AWG THWN-2 EGC/GEC <br />-+-+-+-+ <br />STRING 1 <br /> MODULES <br />==== <br />~ <br />= <br />~ <br />= <br />~ <br />= <br />~ <br />MONITORING <br />(N) <br />[A] <br />Rooftop Array <br />ENPHASE IQ7PLUS-72-2-US <br />QCELL DUO BLK ML-G10 400W <br />(C) <br />MIN. 3/4" EMT <br />(3) THWN-2 #8 OR EQ <br />(1) GEC/EGC THWN-2 #8 <br />60A NON-FUSED <br /> AC DISCONNECT <br />15A/2P <br />08 <br />15 <br />15 <br />08 <br />(E) LOADS <br />(E) LOADS <br />(E) LOADS <br />Rooftop Array <br />ENPHASE IQ7PLUS-72-2-US <br />QCELL DUO BLK ML-G10 400W <br />200A/2P <br />---- <br />Sa <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />a <br />l <br />i <br />f <br />o <br />r <br />n <br />i <br />a <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br /> <br />37 <br />1 <br />7 <br /> <br />S <br />o <br />u <br />t <br />h <br /> <br />O <br />l <br />i <br />v <br />e <br /> <br />S <br />t <br />r <br />e <br />e <br />t <br /> <br />(7 <br />1 <br />4 <br />) <br /> <br />3 <br />1 <br />5 <br />- <br />9 <br />8 <br />6 <br />4 <br /> <br />E5 <br />SHEET NUMBER: <br />DRAWN BY: <br />DATE:10/26/23 <br />Ro <br />s <br />a <br /> <br />F <br />o <br />n <br />s <br />e <br />c <br />a <br /> <br />PR <br />O <br />J <br />E <br />C <br />T <br />: <br />SU <br />N <br />T <br />E <br />R <br />N <br />A <br />L <br /> <br />C <br />O <br />N <br />S <br />T <br />R <br />U <br />C <br />T <br />I <br />O <br />N <br /> <br />I <br />N <br />C <br />56 <br />7 <br />1 <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />T <br />E <br />R <br />E <br />S <br />A <br /> <br />B <br />L <br />V <br />D <br />ST <br />E <br /> <br />1 <br />0 <br />5 <br />SA <br />N <br /> <br />J <br />O <br />S <br />E <br />, <br /> <br />C <br />A <br /> <br />9 <br />5 <br />1 <br />2 <br />3 <br />Li <br />c <br />e <br />n <br />s <br />e <br /> <br /># <br /> <br />1 <br />0 <br />3 <br />6 <br />5 <br />3 <br />6 <br />- <br />B <br />ELECTRICAL LINE DIAGRAM <br />3717 S Olive St- 101118640 & <br />20182388 <br />4/2/2024