Laserfiche WebLink
Date: 06/01/2023 <br />Job Number: 14230 <br />Prepared for : Eco Force Electric Inc., 17415 Villa Corta St, La Puente, CA 91744 <br />Project.: Gregorio Corona , 421 S Huron Dr, , Santa Ana, CA, 92704, <br />The following calculations are for the structural engineering design of the photovoltaic panels and are <br />valid only for the structural info referenced in the stamped plan set. The verification of such info is the <br />responsibility of others. After review, I certify that the roof structure has sufficient structural capacity for <br />the applied PV loads. All PV mounting equipment shall be designed and installed per manufacturer's <br />approved installation specifications. <br />Engineerinc.io <br />303 N Glenoaks Blvd Suite 200 <br />Burbank, CA 91502 <br />(747) 333 - 5991 <br />new@engineerinc.io <br />303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io <br />421 S Huron Dr - <br />2018016207/03/23