Laserfiche WebLink
= <br />~ <br />DC- DC- DC+DC+ <br />DC <br />DISCONNECT <br />DC- DC+ <br />MANUAL <br />BYPASS <br />N.O.N.C.AC <br />DISCONNECT <br />N.C.N.O. <br />L1 L2 L1 L2 L1 L2 <br />AUTOMATIC <br />SWITCHOVER <br />CIRCUIT <br />BREAKER <br />FUSES <br />L1 L2 <br />G <br />N <br />L2 <br />L1 <br />L2 <br />L1 <br />(N) AC DISCONNECT, 30A <br />NON-FUSED, LOCKABLE, <br />120/240V, 2P, NEMA 3R, <br />UL-LISTED <br />FE <br />(N)SOLAREDGE ENERGY HUB SE5700H-US <br />INVERTER 99% CEC EFFICIENCY @ 240VAC <br />5760WAC CONTINOUS MAXIMUM OUTPUT <br />CURRENT 24A GROUND-FAULT PROTECTION <br />PROVIDED PER CEC ARTICLE 690.35 <br />(N) JUNCTION BOX: <br />600V, NEMA 3R, <br /> UL LISTED <br />(READILY ACCESSIBLE) <br />- + <br />-++ <br />- + <br />++ +-- - <br />- + <br />- <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />(15)JINKO SOLAR JKM425N-54HL4-B MODULES <br />STRING 1 OF 08 MODULES <br />STRING 2 OF 07 MODULES <br />- + <br />-++ <br />- + <br />++ +-- - <br />- + <br />- <br />1 <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />- + - + <br />- + - + <br />2 3 7 <br />1 2 3 <br />- <br />- <br />= <br />- <br />- <br />= <br />SolarEdge Power Optimizer S500B Rated <br />DC Input Power - 500 watts <br />Maximum Input Voltage - 125 Vdc <br />MPPT Range - 12.5 to 105 Vdc <br />Maximum Input Current - 15 Adc <br />Maximum Output Current - 15 Adc String <br />Limitations - 6 to 25 Optimizers, <br />5700 watts STC per string maximum <br />B <br />A <br />SOLAREDGE <br />ENERGY BANK <br />10 KW BATTERY, <br />350V LITHIUM <br />BATTERY <br />+- <br />(N) SOLAREDGE ENERGY <br />BANK 10 KW BATTERY <br />(BAT-10K1PS0B-02) <br />D <br />L2L1 <br />L2L1 <br />(N) ESS DC DISCONNECT, <br />30A,LOCKABLE, 600V, <br />NEMA 3R, UL LISTED <br />C <br />G <br />8 <br />6 7 <br />6' MAX <br />POINT OF INTERCONNECTION, <br />30A LOAD SIDE BREAKER <br />EXISTING GROUNDING <br />ELECTRODE CONDUCTOR <br />MM <br />TO UTILITY GRID <br />(N) 200A/2P <br />BI-DIRECTIONAL <br />UTILITY METER #222013-150780 <br />1-PH, 3-W, 120V/240V <br />UTILITY COMPANY - SCE <br />(N) 200A EXTERIOR <br />METER-MAIN SERVICE PANEL <br />UPGRADED FROM (E) 200A <br />RATED, 1-PH, 3-W, 240V <br />(N)200A/2P MAIN BREAKER <br />UPGRADED FROM (E) 200A <br />MAIN BREAKER TO HOUSE, 240V <br />20A/2P 30A/2P <br />30A/2P 20A/2P <br /> FAU <br />FRIDGE <br />20A/2P <br />20A/2P <br /> EV CHARGER <br />AC <br />GARAGE <br />LIGHTS <br />20A/2P <br />LIGHTS <br />20A/2P <br />ROOM <br />LIVING ROOM <br />20A/2P <br />KITCHEN <br />50A/2P <br />50A/2P 20A/2P <br />20A/2P20A/2P <br />(N) 20A/2P <br /> FISHPOND <br /> OVEN <br />UPSTAIRLIGHTS <br />20A/2P <br />KITCHEN <br />(N) 30A/2P <br />SURGE PROTECTION DEVICE <br />TRANG DO RESIDENCE <br />5402 W LEHNHARDT AVE., SANTA ANA, CA 92704 <br />SIGNED & STAMP BY <br />DATE 10/14/2024 <br />PROJECT ID OPS 034-874 <br />CREATED BY SS <br />CHECKED BY RB <br />SCALE <br />SHEET SIZE <br />11"X 17" <br />ANSI B <br />#REVISION/UPDATE DATE <br />B REVISION 11/04/2024 <br />SHEET INFORMATIONHOMEOWNER INFO <br />SHEET NO. <br />APN NUMBER: 10859132 <br />E-1 <br />PHONE NO: (714) 548-0899 <br />Luxor Energy, Inc <br />11740 Sterling Ave, Riverside, CA 92503 <br />C10 LICENSE <br />Lic No. #1102673 <br />www.myluxorenergy.com <br />ELECTRICAL <br />DIAGRAM & <br />CALCULATIONS <br />NTS <br />120% RULE CEC 705.12 (B)(2)(3)(b) <br />(BUS BAR RATING X 120%) - MAIN BREAKER <br />RATING = MAX. PV OCPD <br />(200A x 120%) - 200A = 40A <br />INSTALLED PV BREAKER = 30A <br />SOLAR MODULE SPECIFICATIONS <br />MANUFACTURER / MODEL JINKO SOLAR JKM425N-54HL4-B <br />VMP 32.37V <br />IMP 13.13A <br />VOC 38.95V <br />ISC 13.58A <br />TEMP. COEFF. VOC -0.25 %/°C <br />MODULE DIMENSION 67.79" (L) x 44.65" (W) <br />PANEL WATTAGE 425W <br />EQUIPMENT DETAILS <br />(#) PV MODULES (15)JINKO SOLAR JKM425N-54HL4-B <br />(#) OPTIMIZERS (15)SOLAREDGE POWER OPTIMIZER S500B <br />(#) INVERTER (1)SOLAREDGE ENERGY HUB SE5700H-US <br />(#)BATTERY (01) SOLAREDGE ENERGY BANK BATTERY (10KW) <br />(BAT-10K1PS0B-02) <br />SYSTEM OUTPUT CURRENT 24.00A <br />STRING 1 STRING OF 08 MODULES & 1 STRING OF 07 <br />MODULES <br />POINT OF <br />INTERCONNECTION <br />30A LOAD SIDE BREAKER IN EXTERIOR NEW <br />METER-MAIN SERVICE PANEL WITH 200A MAIN <br />BREAKER, 200A BUSBAR, 120/240V, 3W, 1ΙΈ <br />UTILITY SCE <br />AHJ SANTA ANA CITY <br />PV SYSTEM DETAILS <br />[ DC ] SYSTEM SIZE [ AC ] SYSTEM SIZE <br />(15) MODULES x 425W (1) INVERTER x 5760W <br />6.375 kW 5.760 kW <br />NOTE: NONE OF THE BACKUP LOAD <br />CIRCUIT EXCEEDS THE MAXIMUM ESS <br />SOURCE OF CURRENT. <br />NOTE: IT IS ASSUMED THAT THE CONDUIT OR RACEWAY CONTAINING <br />THE RELOCATED LOADS CONDUCTORS IS 24" OR LESS IN LENGTH. IF NOT, <br />THEN THE CONDUCTORS MUST BE ADJUSTED FOR AMPACITY DUE TO <br />THE NUMBER OF CURRENT-CARRYING CONDUCTORS IN CONDUIT. 2022 <br />CALIFORNIA ELECTRICAL CODE (CEC) TABLE 310.15(C)(1), TABLE 310.16 <br />NOTE: ANY CIRCUITS EXTENDED BY <br />MORE THAN 6 FEET IN A RACEWAY <br />MUST FOLLOW THE CURRENT AFCI <br />REQUIREMENTS OF CEC 210.12. <br />NOTES: BATTERY SHOULD BE INSTALLED 3FEET <br />DISTANCE FROM ANY ENTERING DWELLING UNIT. <br />REV_A : 11/04/2024 <br />5402 W Lehnhardt <br />Ave11/25/2024