My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
589 S Lyon St - Plan
PBA
>
Building
>
ProjectDox
>
L
>
Lyon St
>
589 S Lyon St
>
589 S Lyon St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:08:24 PM
Creation date
6/1/2025 12:07:58 PM
Metadata
Fields
Template:
Plan
Permit Number
20183338
101119958
Full Address
589 S Lyon St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BUILDING AND SAFETY DEPARTMENT <br />City of <br />RE: PLAN CHECK RESPONSE <br />Project Name: <br />Project Address: <br />Project Description: Rooftop Photovoltaic System Individual Permit Package for 717 Lyon ‐ Bldg. 1 ‐ Lot 105 <br />This is in response to the plan check comments dated 6/17/2024 for the project noted above. <br />Should you have any additional questions, please feel free to contact me. <br />Sincerely, <br />_____________________________ <br />Eddielyn Abaño / Permit Coordinator <br />SunPower Corporation / 408‐514‐4114 <br />eddielyn.abano@sunpowercorp.com <br />717 Lyon ‐ Bldg. 1 ‐ Lot 105 <br />589 South Lyon Street, Santa Ana, CA 92701 <br />6/18/2024 <br />Santa Ana <br />Plan Check Number: <br />Structural sheets are already stamped by Engineer. <br />Structural Calculations (if applicable) <br />Structural pages stamped by Licensed Structural Engineer ‐ refer to #10 on the Residential Solar <br />Checklist for pages requiring a structural engineer stamp <br />Comment <br />4 <br />Comment No.Response <br />1 Solar Permit Application including project valuation ‐ missing valuation Valuation has been added to application. <br />Signed Homeowner authorization letter to install solar panels (if DocuSign, must provide <br />confirmation page) ‐ Need a letter from the developer stating they are allowing your company <br />to install solar panels (it can be a letter which includes all addresses or individually) <br />2 <br />3 <br />Electrical solar ABCs forms (Must be completed electronically) ‐ On page 2, Step 1 #2 ‐ is <br />marked no, if the answer is correct plan check is required <br />Signed Homeowner Letter of Authorization has been uploaded. <br />The correct answer is Yes, ABC form has been updated <br />and uploaded. <br />Already part of the plan. Pages PVS-4 to PVS-6. <br />589 S Lyon St- <br />101119958 & 201833387/11/2024
The URL can be used to link to this page
Your browser does not support the video tag.