Laserfiche WebLink
By: J.R. <br />Date: 2/3/25 <br />Project Info 3 <br />Gravity Loads 4 <br />Lateral Loads 5 <br />Wind Uplift Design 6 <br />Summary 7 <br />Table Of Contents <br />*Note:  This engineering report is limited to the information presented to Engineer via plans, site  <br />information, photos, and written correspondence as provided by Client.  On‐site structural  <br />observations and verification of site conditions are not included herein.  Engineering for  <br />manufactured products such as photovoltaic modules or racking systems is excluded from this  <br />report.  Please refer to the manufacturer's specifications, certifications, and pre‐engineered  <br />packages for product engineering.  Installations of solar modules and related equipment must be  <br />performed in accordance with manufacturer recommendations, local codes, local regulations,  <br />industry best practices, and applicable safety standards.  Owner and/or Contractor shall notify  <br />Engineer should any damage, deterioration, or discrepancies between current condition of the  <br />structure or otherwise as this letter describes before proceeding with construction.  This letter  <br />applies only to regions of the structure where solar modules will be supported and the  <br />supporting elements. <br />2/3/2025  4:32 PM <br />2 of 7 <br />©McPherson Engineering <br />718 W Tribella Ct <br />3/17/2025