Laserfiche WebLink
By: J.R. <br />Date: 2/3/25 <br />Gravity Loads: <br />DEMAND DECREASED BY 11.52% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 1.24% < 10% = OK! <br />Anchorage: <br />DEMAND OF 374.8LB. < CAPACITY OF 1702.4LB. = OK! <br />USE (2) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRA <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />2/3/2025  4:32 PM <br />7 of 7 <br />©McPherson Engineering <br />718 W Tribella Ct <br />3/17/2025