Laserfiche WebLink
Digitally sealed by RJM on <br />Date: <br />Job #: <br />1/15/24 <br />Structural Analysis Report <br />For <br />Photovoltaic System Addition to Existing Structure <br />At <br />825 N Parkcenter Dr <br />Santa Ana, CA 92705 <br />1/15/24 <br />Designed in Accordance with CBC 2022, ASCE 7-16 <br />23-17006 <br />E.O.R.: Ryan McPherson, P.E. <br />9240 Limonite Ave <br />Jurupa Valley, CA 92509 <br />Mobile: (909) 566-0066 <br />Email: SE@mcpe.group <br />1/15/2024 2:30 PM <br />1 of 7 <br />©McPherson Engineering <br />825 N Parkcenter Dr - <br />101118224 & 201820725/31/2024