Laserfiche WebLink
Sheet: <br />Date: <br />02.23.2023 <br />Residential Roof <br />Mounted <br />Photovoltaic System <br />System Size (DC): <br />Modules: <br />Inverter: <br />Tom Van Aken <br />Project Name and Address: <br />417 S Clara St Unit #2, <br />Santa Ana, CA 92703, <br />Title: <br />x Hyundai 405W HiS-S405YH(BK) 6 <br />Enphase IQ7Plus-72-2-US <br />AWS Electrical & Solar Inc <br />11750 Roscoe Blvd, Suite 7, Sun <br />Valley, CA 91352, USA <br />Phone: (818) 484-3264 <br />AWS-Solar.com <br />License number C10#901196 <br />System Size (AC): <br />x x = 6 381.1 0.97 2.22 KW <br />x =6 405 2.43 KW <br />x6 <br />PV-0 <br />SATELLITE VIEW <br />SCALE: NTS <br />VICINITY MAP <br />SCALE: NTS <br />SHEET INDEX <br />PV-0 COVER SHEET <br />SOLAR INDIVIDUAL PERMIT PACKAGE <br />1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY RECOGNIZED ELECTRICAL TESTING <br />LABORATORY CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETE TEST DATA SUBMITTED BY THE <br />MANUFACTURER ATTESTING TO ITS SAFETY <br />2. OUTDOOR EQUIPMENT SHALL BE AT LEAST NEMA 3R RATED <br />3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED <br />4. ALL SPECIFIC WIRING IS BASED ON THE USE OF COPPER. <br />5.CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO INSTALLATION AND SHALL COORDINATE <br />ALL INSPECTIONS, TESTING <br />COMMISSIONING AND ACCEPTANCE WITH THE CLIENT, UTILITY CO. AND CITY INSPECTORS AS NEEDED. <br />6.THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF SERVICE POINTS AND <br />SERVICE SIZES WITH THE SERVING UTILITY COMPANY AND COMPLY WITH ALL UTILITY COMPANIES <br />REQUIREMENTS. IF THE SOLAR BACK FED BREAKER IS OVER THE BUSS SIZE 20% LIMIT, CONTRACTOR <br />SHALL INCLUDE THE COST TO REPLACE MAIN BREAKER OR ENLARGE MAIN CAPACITY. <br />7. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS SHALL BE OPTION OF THE <br />CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE COORDINATED WITH OTHER TRADES. <br />8. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE FOR PV INSTALLATION, CALL ENGINEER <br />PRIOR TO INSTALL. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THAT THE ROOF IS CAPABLE OF <br />WITHSTANDING THE EXTRA WEIGHT. <br />9. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN SHOWN, THE CONTRACTOR SHALL NOTIFY <br />THE ELECTRICAL ENGINEER TO VALIDATE THE WIRE SIZE. FINAL DRAWINGS WILL BE RED-LINED AND <br />UPDATED AS APPROPRIATE. <br />10. WHENEVER A DISCREPANCY IN QUALITY OF EQUIPMENT ARISES ON THE DRAWING OR <br />SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL <br />MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN <br />THE SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM <br />REQUIRED BY THE ARCHITECT/ENGINEERS. <br />GENERAL NOTES <br />CODE INFORMATION <br />2022 CALIFORNIA BUILDING CODE (CBC) <br />2022 CALIFORNIA RESIDENTIAL CODE (CRC) <br />2022 CALIFORNIA FIRE CODE (CFC) <br />2022 CALIFORNIA ELECTRICAL CODE (CEC) <br />2022 CALIFORNIA MECHANICAL CODE (CMC) <br />2022 CALIFORNIA PLUMBING CODE (CPC) <br />2022 CALIFORNIA ENERGY CODE (CENC) <br />2022 CALIFORNIA ADMINISTRATIVE CODE (CAC) <br />BUILDING INFORMATION <br />MSP INFORMATION <br />1 STORY HOUSE <br />SINGLE FAMILY RESIDENCE <br />CONSTRUCTION TYPE: V-B <br />OCCUPANCY: R3 <br />MAIN SERVICE PANEL BUS SIZE <br />MAIN SERVICE BREAKER SIZE <br />LEGEND <br />INV Solar Inverter <br />DCD DC Disconnect <br />COVER SHEET <br />PV-1 ROOF PLAN <br />PV-2 ELECTRICAL 1 LINE DIAGRAM <br />PV-4 STRUCTURAL INFORMATION <br />PV-5 CODE REQUIRED SIGNAGE <br />IQ IQ Combiner Box <br />J/B Junction Box <br />PM Performance Meter <br />PV PV Load Center <br />MSP Main Service Panel <br />SSP Service Sub Panel <br />ACD AC Disconnect <br />UM Utility Meter <br />EMT / FMT / PVC/ RMC type conduit <br />EXISTING <br />200A <br />200A <br />PV-3 ELECTRICAL CALCULATION <br />BLDG# 101114681 ISS. 4/17/23 <br />ELEC# 20179331 ISS. 4/17/23 <br />The scope of the plans is for the installation of the solar <br />photovoltaic system only and the approval is subject to compliance <br />with all applicable city and state codes and regulations regarding <br />construction. The approval of the plans does not constitute any <br />certification of the accuracy, completeness, or building permit <br />status of the existing buildings and structures as shown. <br /> <br />417 S Clara St #2 <br />04/17/23