Laserfiche WebLink
GENERAL NOTES <br />PV-2.0 <br />CUSTOMER INFORMATION <br />NAME&ADDRESS: <br />34° 7'40.41"N 117°55'50.30"W <br />APN:100-412-12 <br />AHJ:CA-CITY OF SANTA ANA <br />SYSTEM INFORMATION <br />DESIGNER/CHECKED BY: <br />RK/PI <br />PROJECT NUMBER:SSNC-008834 <br />SCALE:AS NOTED PAPER SIZE:17"x11" <br />MARIA CAMACHO <br />4618 W HOLLYLINE AVE, SANTA ANA, CA 92703. <br />ENGINEER OF RECORD <br />DATE:03/02/2023 REV:A <br />DC SYSTEM SIZE: 5680W <br />AC SYSTEM SIZE: 4640W <br />CEC AC SYSTEM SIZE: 5146W <br />MODULES: <br />(16)LONGI LR4-60HPB-355M <br />INVERTER: <br />(16)ENPHASE IQ8PLUS-72-2-US(240V,1PH) <br />BRANCH DETAILS: <br />2 BRANCH OF 8 MICRO INVERTERS (8 MODULES) <br />CONTRACTOR INFORMATION <br />SOLARSUN CO <br />18662 OAK PARK DR, RIVERSIDE, CA 92504. <br />TEL:928-707-2386 <br />LIC:#B C46@1093510 <br />GENERAL NOTES <br />GENERAL NOTES <br />1. MODULES ARE LISTED UNDER UL 1703 AND CONFORM TO THE STANDARDS. <br />2. INVERTERS ARE LISTED UNDER UL 1741 AND CONFORM TO THE STANDARDS. <br />3. DRAWINGS ARE DIAGRAMMATIC, INDICATING GENERAL ARRANGEMENT OF THE PV SYSTEM AND THE ACTUAL <br />SITE CONDITION MIGHT VARY. <br />4. WORKING CLEARANCES AROUND THE NEW PV ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN <br />ACCORDANCE WITH CEC CODE. <br />5. ALL GROUND WIRING CONNECTED TO THE MAIN SERVICE GROUNDING IN MAIN SERVICE PANEL/ SERVICE <br />EQUIPMENT. <br />6. ALL CONDUCTORS SHALL BE 600V, 75°C STANDARD COPPER UNLESS OTHERWISE NOTED. <br />7. WHEN REQUIRED, A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA <br />REGULATIONS. <br />8. THE SYSTEM WILL NOT BE INTERCONNECTED BY THE CONTRACTOR UNTIL APPROVAL FROM THE LOCAL <br />JURISDICTION AND/OR THE UTILITY. <br />9. ROOF ACCESS POINT SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF GROUND <br />LADDERS OVER OPENINGS SUCH AS WINDOWS OR DOORS, AND LOCATED AT STRONG POINTS OF BUILDING <br />CONSTRUCTION WHERE THE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS <br />TREES, WIRES OR SIGNS. <br />10. PV ARRAY COMBINER/JUNCTION BOX PROVIDES TRANSITION FROM ARRAY WIRING TO CONDUIT WIRING <br />EQUIPMENT LOCATION: <br />11. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY CEC CODE. <br />12. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING <br />TEMPERATURE AS SPECIFIED BY CEC CODE AND CEC TABLES. <br />13. JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO CEC CODE. <br />14. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE <br />AC SERVICING DISCONNECT. <br />15. ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO CEC <br />APPLICABLE CODES. <br />16. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE <br />. <br />STRUCTURAL NOTES: <br />17. RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION <br />MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND <br />A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL <br />MANUFACTURER’S INSTRUCTIONS. <br />18. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT <br />SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS. <br />19. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED WITH APPROVED CHEMICAL <br />SEALANT PER CODE BY A LICENSED CONTRACTOR. <br />20. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY <br />THE RACKING MANUFACTURER. <br />21. WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF <br />FRAMING MEMBERS. <br />WIRING & CONDUIT NOTES: <br />22. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE <br />SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. <br />23. CONDUCTORS SIZED ACCORDING TO CEC CODE. <br />24. DC WIRING LIMITED TO MODULE FOOTPRINT. MICRO INVERTER WIRING SYSTEMS SHALL BE LOCATED AND <br />SECURED UNDER THE ARRAY WITH SUITABLE WIRING CLIPS. <br />25. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR <br />OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION <br />NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO <br />BE MARKED ORANGE [CEC CODE]. <br />INTERCONNECTION NOTES: <br />26. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [CEC CODE] <br />27. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT EXCEED 120% OF BUSBAR <br />RATING [CEC CODE]. <br />28. WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV DEDICATED BACKFED BREAKERS <br />MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [CEC CODE]. <br />29. AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVER CURRENT DEVICES SHALL NOT <br />EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVER CURRENT DEVICE MAY BE EXCLUDED <br />ACCORDING TO CEC CODE. <br />30. FEEDER TAP INTER CONNECTION (LOAD SIDE) ACCORDING TO CEC CODE. <br />31. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO CEC CODE WITH SERVICE ENTRANCE CONDUCTORS IN <br />ACCORDANCE WITH CEC CODE. <br />32. BACK FEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT FROM ADDITIONAL <br />FASTENING [CEC CODE]. <br />GROUNDING NOTES: <br />33. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES <br />EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. <br />34. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO CEC CODE AND MINIMUM CEC TABLE. <br />35. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN <br />ACCORD. <br />36. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO CEC CODE AND MICRO INVERTER <br />MANUFACTURER'S INSTRUCTIONS. <br />37. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER <br />DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST <br />BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION <br />REQUIREMENTS. <br />38. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE <br />DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. <br />39. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF <br />#4 AWG OR LARGER [CEC CODE] <br />40. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH CEC CODE AND NEC CODE THROUGH . IF EXISTING <br />SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO <br />CEC CODE AND AHJ. <br />41. GROUND-FAULT DETECTION SHALL COMPLY WITH CEC CODE IN GENERAL AND CEC CODE SPECIFICALLY. <br />42. DISCONNECTION AND OVER-CURRENT PROTECTION NOTES. <br />43. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS <br />REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER <br />TERMINALS). <br />44. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A <br />VISIBLE-BREAK SWITCH <br />45. RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY OR 5 FT INSIDE A BUILDING <br />WITHIN 10 SECONDS. CONTROLLED CONDUCTORS ≤30V AND ≤240VA [CEC CODE]. LOCATION OF LABEL <br />ACCORDING TO AHJ. <br />46. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO CEC CODE. <br />47. MICRO INVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH <br />CEC CODE. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO <br />CEC CODE AND UL1699B. <br />Signed: 03/02/2023 <br />Structural <br />Only <br />4618 W Hollyline <br />Ave03/24/23