Laserfiche WebLink
PV-1 <br /> PROJECT NO. <br />DATEREVISION <br /> LICENSE <br />NUMBER <br /> 749095 C-10 <br />DATE: //2023 <br />TI <br />R <br />I <br />T <br />I <br />L <br />L <br />I <br />, <br /> <br />G <br />E <br />R <br />A <br />L <br />D <br />82 <br />5 <br /> <br />C <br />L <br />E <br />M <br />E <br />N <br />S <br />E <br />N <br /> <br />A <br />V <br />E <br />. <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br />, <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />PH <br />O <br />N <br />E <br />: <br /> <br />( <br />7 <br />1 <br />4 <br />) <br /> <br />5 <br />0 <br />4 <br />- <br />2 <br />8 <br />9 <br />9 <br />LE <br />G <br />A <br />L <br /> <br />D <br />E <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br />/ <br />A <br />P <br />N <br />: <br /> <br />3 <br />9 <br />6 <br />- <br />4 <br />1 <br />1 <br />- <br />1 <br />9 <br /> DRAWN BY: <br />CLEMENSEN AVE <br />CONDUIT RUN ON ROOF / <br />UNDER EAVE <br />EXISTING 100A MAIN <br />SERVICE PANEL (100A MCB) <br />CAL-FIRE WALKWAY <br />Scale: 1" = 20' <br />SITE MAP 1 <br />00 20' 40' <br />NORTH <br />BATTERY / PV DISCONNECT <br />(NEXT TO MSP) <br />STRING 13 <br />STRING 26 <br />ROOF ACCESS POINT <br />BATTERY W / INTEGRATED INVERTER, <br />RAPID SHUTDOWN FOR PV / ESS, <br />MICRO GRID SUB-PANEL & GATEWAY-2 <br />(EXTERIOR WALL) <br />ARRAY 3 <br />(3) HANWHA QCELLS Q.PEAK DUO <br />BLK ML-G10 405 MODULES MOUNTED <br />FLUSH TO ROOF <br />ROOF SLOPE = 18 AZIMUTH = 245 <br />ROOF ACCESS POINTS SHALL BE PROVIDED PER THE <br />FOLLOWING (CRC R324.6) ROOF ACCESS AND PATHWAYS: <br />ROOF ACCESS, PATHWAYS AND SETBACKS REQUIREMENTS SHALL BE <br />PROVIDED IN ACCORDANCE WITH SECTIONS R324.6.1 THROUGH R324.6.2.1 <br />ACCESS AND MINIMUM SPACING SHALL BE REQUIRED TO PROVIDE <br />EMERGENCY ACCESS TO THE ROOF, TO PROVIDE PATHWAYS TO SPECIFIC <br />AREAS OF THE ROOF, PROVIDE FOR SMOKE VENTILATION OPPORTUNITY <br />AREAS, AND TO PROVIDE EMREGENCY EGRESS FROM THE ROOF. <br />PL PL <br />PLPL <br />1'-6" <br />1'-6"ARRAY 1 <br />(2) HANWHA QCELLS <br />Q.PEAK DUO BLK <br />ML-G10 405 MODULES <br />MOUNTED FLUSH TO <br />ROOF <br />ROOF SLOPE = 18 <br />AZIMUTH = 155 <br />ARRAY 2 <br />(4) HANWHA QCELLS <br />Q.PEAK DUO BLK <br />ML-G10 405 <br />MODULES MOUNTED <br />FLUSH TO ROOF <br />ROOF SLOPE = 9 <br />AZIMUTH = 155 <br />825 E Clemensen <br />Ave04/26/23