Laserfiche WebLink
PROJECT INFORMATION <br />PROJECT DESCRIPTION <br />APPLICABLE CODES <br />INTERIOR TENANT IMPROVEMENT FOR CREDIT UNION. NO WORK TO BUILDING <br />EXTERIOR. <br />ALL WORK SHALL BE IN CONFORMANCE WITH THE LATEST ADOPTED AND <br />EFFECTIVE EDITION OF TITLE 24, CALIFORNIA CODE OF REGULATIONS (CCR), <br />AS APPLICABLE: <br />PART 1 CALIFORNIA ADMINISTRATIVE CODE <br />PART 2 2022 CALIFORNIA BUILDING CODE <br />PART 3 2022 CALIFORNIA ELECTRICAL CODE <br />PART 4 2022 CALIFORNIA MECHANICAL CODE <br />PART 5 2022 CALIFORNIA PLUMBING CODE <br />PART 6 2022 CALIFORNIA ENERGY CODE <br />PART 9 2022 CALIFORNIA FIRE CODE <br />PART 11 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE <br />VICINITY MAP <br />PROJECT LOCATION <br />ADDRESS: 800 W SANTA ANA BOULEVARD <br />SANTA ANA, CA 92701 <br />APN: 398-212-17 <br />ZONING: P (PROFESSIONAL) <br />LOT AREA: 0.4 ACRE <br />GENERAL NOTES <br />1. ASBESTOS CONTAINING MATERIALS MAY BE PRESENT ON SITE OR IN THE <br />EXISTING BUILDING CONSTRUCTION. IF SUSPECT MATERIALS ARE <br />ENCOUNTERED, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE <br />OWNER'S REPRESENTATIVE FOR INSTRUCTIONS PRIOR TO PROCEEDING <br />WITH ADDITIONAL WORK. THE CONTRACTOR SHALL IMMEDIATELY POST <br />NOTICES AND TAKE THE PRECAUTIONS NECESSARY TO ENSURE THE <br />HEALTH AND SAFETY OF ALL WORKERS, THE STAFF AND THE PUBLIC. <br />PROJECT <br />NORTH <br />TRUE <br />NORTH <br />1 <br />PROJECT CONTACTS <br />OWNER INFORMATION <br />CONSULTANT INFORMATION <br />OWNER SANTA ANA FEDERAL CREDIT UNION <br />800 W SANTA ANA BOULEVARD <br />SANTA ANA, CA 92701 <br />PHONE: 714.834.1341 <br />CONTACT: JILL MAHANY, CEO <br />WMB ARCHITECTS <br />5757 PACIFIC AVENUE, SUITE 226 <br />STOCKTON, CA 95207 <br />PHONE: 209.944.9110 <br />FAX: 209.944.5711 <br />EMAIL: mv@wmbarchitects.com <br />CONTACT: MELANIE VIEUX, <br />PROJECT ARCHITECT <br />ARCHITECT <br />4 ACE CONSTRUCTION <br />8423 ROCHESTER AVENUE <br />RANCHO CUCAMONGA, CA 91730 <br />PHONE: 909.945.9100 <br />EMAIL: scooper@4aceconstruction.com <br />CONTACT: STEVE COOPER <br />CONTRACTOR <br />DETAIL <br />DESIGNATION <br />CENTERLINE <br />DESIGNATION <br />BUILDING <br />SECTION <br />WALL <br />SECTION <br />AA <br />A4.1 <br />A <br />A5.1 <br />AA <br />A4.1 <br />1 <br />FINISH <br />DESIGNATION <br />REVISION TO <br />DRAWINGS <br />ROOM NAME <br />& NUMBER <br />NUMBERED <br />NOTE <br />NORTH <br />ARROW <br />1 <br />STRUCTURAL <br />/ GRID LINE <br />ELEVATION <br />MARKER <br />INTERIOR <br />ELEVATION <br />MARKER <br />?00.00 <br />A <br />A6.1 <br />A10.1 <br />1 <br />1 1 <br />1 <br />2 3 <br />4 <br />ROOM NAME <br />101 <br />A <br />P1 <br />ALTERATION TO EXISTING BUILDING <br />ADDITION TO EXISTING BUILDING <br />B <br />7,100 S.F. <br />2,700 S.F. <br />VB <br />EXISTING FIRE SPRINKLERS <br />1 <br />CHANGE OF USE <br />(E), UNCHANGED <br />TYPE OF CONSTRUCTION <br />YES <br />NUMBER OF STORIES <br />BUILDING AREA <br />NO <br />OCCUPANCY GROUP <br />BUILDING HEIGHT <br />AREA OF WORK <br />X <br />X <br />X <br />X <br />77TOTAL BUILDING <br />OCCUPANCY <br />ACCESS COMPLIANCE <br />DATE OF PREVIOUS ALTERATION <br />CLAIM OF HARDSHIP UNDER <br />CBC 11B-202.4 EXCEPTION 8 <br />VALUATION <br />YES <br />$95,000 <br />[N/A] <br />PROJECT DATA <br />1 <br />L <br />ROFIEFAOT <br />C <br />NO. C 30857 <br />REN. 3−31−23ATS <br />ICE <br />L <br />AIN <br />TC <br />TEI <br />ADNSE HCR <br />MELANIE A .VIEUX <br />Copyright WMB, Inc. <br />DATE PURPOSE <br />PUBLISH HISTORY: <br />No. <br />2000 L Street <br />Suite 125 <br />Sacramento, CA 95811 <br />T 209.944.9110 <br />F 209.944.5711 <br />www.wmbarchitects.com <br />5757 Pacific Avenue <br />Suite 226 <br />Stockton, CA 95207 <br />WMB Project No. <br />4/6/2023 9:21:08 AM <br />T1.1 <br />TITLE SHEET <br />03.03.23 PERMIT SUBMITTAL <br />04.06.23 PLAN CHECK 011 <br />Santa Ana Federal <br />Credit Union Tenant <br />Improvement <br />23-014 <br />800 W Santa Ana Blvd <br />Santa Ana, CA 92701 <br />T1.1 TITLE SHEET <br />T2.1 OCCUPANCY PLAN <br />T2.2 CALGREEN CODE COMPLIANCE <br />T3.1 POSTED SIGNAGE PLAN + DETAILS <br />D2.1 DEMOLITION FLOOR + CEILING PLANS <br />A1.1 SITE PLAN <br />A2.1 FLOOR PLANS <br />A6.1 DETAILS <br />A8.1 DOOR SCHEDULE <br />A9.1 REFLECTED CEILING PLAN <br />A9.2 CEILING DETAILS <br />A10.1 CASEWORK ELEVATIONS + DETAILS <br />E1.1 ELECTRICAL LIGHTING + POWER PLAN <br />@ AT <br />A.F.F. ABOVE FINISH FLOOR <br />ABV. ABOVE <br />ADJ. ADJUSTABLE <br />ALT. ALTERNATE <br />ALUM. ALUMINUM <br />APPL. APPLICABLE <br />APPROX. APPROXIMATE <br />B.O. BOTTOM OF <br />BD. BOARD <br />BLDG. BUILDING <br />BLK. BLOCK <br />BLKG. BLOCKING <br />BLW. BELOW <br />BTWN. BETWEEN <br />C.I. CAST IRON <br />C.I.P. CAST-IN-PLACE <br />C.J. CONTROL JOINT <br />C.L. CENTER LINE <br />CBC CALIFORNIA BUILDING CODE <br />CLG. CEILING <br />CLR. CLEAR <br />CMU CONCRETE MASONRY UNIT <br />COL. COLUMN <br />COMP. COMPACTED <br />CONC. CONCRETE <br />CONT. CONTINUOUS <br />D.F. DOUGLAS FIR / DRINKING <br />FOUNTAIN <br />D.S. DOWNSPOUT <br />DBL. DOUBLE <br />DIA. DIAMETER <br />DN. DOWN <br />DWG. DRAWING <br />E.I.F.S. EXTERIOR INSULATION & <br />FINISH SYSTEM <br />E.J. EXPANSION JOINT <br />E.W. EACH WAY <br />EA. EACH <br />ELEV. ELEVATION <br />EQ. EQUAL <br />EXIST. / <br />(E) <br />EXISTING <br />EXP. EXPANSION <br />EXT. EXTERIOR <br />F.D. FLOOR DRAIN <br />F.E. FIRE EXTINGUISHER <br />F.G. FIBERGLASS / FINISH GRADE <br />F.H. FIRE HYDRANT <br />F.O.F. FACE OF FINISH <br />F.O.S. FACE OF STUD <br />F.R.P. FIBER REINFORCED <br />POLYMER <br />F.S. FIRE SPRINKLERS <br />FIN. FINISH <br />FLR. FLOOR <br />FT. FOOT / FEET <br />FTG. FOOTING <br />G.B. GRADE BREAK <br />G.I. GALVANIZED IRON <br />G.L.B. GLUE LAMINATED BEAM <br />GA. GAUGE <br />GALV. GALVANIZED <br />GD. GRADE <br />GYP. BD. GYPSUM BOARD <br />H.M. HOLLOW METAL <br />HD. HEAD <br />HDR. HEADER <br />HDWR. HARDWARE <br />HORIZ. HORIZONTAL <br />HR. HOUR <br />HT. HEIGHT <br />I.D. IDENTIFICATION <br />I.S.A. INTERNATIONAL SYMBOL OF <br />ACCESSIBILITY <br />INSUL. INSULATION <br />INT. INTERIOR <br />JB. JAMB <br />JT. JOINT <br />LAV. LAVATORY <br />LTWT. LIGHT WEIGHT <br />MAX. MAXIMUM <br />MECH. MECHANICAL <br />MIN. MINIMUM / MINUTE <br />MTD. MOUNTED <br />MTL. METAL <br />(N) NEW <br />N.I.C. NOT IN CONTRACT <br />N.T.S. NOT TO SCALE <br />N/A NOT APPLICABLE <br />NO. / # NUMBER <br />O.C. ON CENTER <br />OPP. OPPOSITE HAND <br />ov/ OVER <br />OZ. OUNCE <br />P.F. PREFINISHED <br />P.O.C. POINT OF CONNECTION <br />P.T. PRESSURE TREATED <br />PL. PLATE <br />PLAM. PLASTIC LAMINATE <br />PROP. PROPERTY <br />PSI POUNDS PER SQUARE INCH <br />PW PLYWOOD <br />R.W.L. RAIN WATER LEADER <br />RDWD. REDWOOD <br />REF. REFER TO <br />REINF. REINFORCED <br />REQ'D. REQUIRED <br />RM. ROOM <br />S.C. SOLID CORE <br />S.D. STORM DRAIN <br />S.F. SQUARE FOOTAGE / <br />STOREFRONT <br />S.M. SHEET METAL <br />S.M.S. SHEET METAL SCREW <br />S.P. SINGLE PLY <br />S.S. SANITARY SEWER LINE / <br />STANDING SEAM / <br />STAINLESS STEEL <br />SCH. SCHEDULE <br />SDST SELF-DRILLING <br />SELF-TAPPING <br />SHT. SHEET <br />SIM. SIMILAR <br />SPEC. SPECIFICATION <br />SQ. SQUARE <br />STD. STANDARD <br />STL. STEEL <br />SUSP. SUSPENDED <br />T & B TOP & BOTTOM <br />T & G TONGUE & GROOVE <br />T.J.I. TRUS JOIST I-JOIST <br />T.O. TOP OF <br />T.S. TUBE STEEL <br />TEMP TEMPORARY <br />TYP. TYPICAL <br />U.O.N. UNLESS OTHERWISE NOTED <br />V.B. VAPOR BARRIER <br />V.I.F. VERIFY IN FIELD <br />V.T.R. VENT THROUGH ROOF <br />VERT. VERTICAL <br />W.C. WATER CLOSET <br />W.H. WATER HEATER <br />W.I. WROUGHT IRON <br />W.W.F. WOVEN WIRE FABRIC <br />w/ WITH <br />w/o WITHOUT <br />WD. WOOD <br />ABBREVIATIONS <br />SYMBOLS <br />SHEET INDEX <br />Santa Ana Federal Credit Union Tenant Improvement <br />APN: 398-212-17 <br />800 W Santa Ana Blvd, Santa Ana, CA 92701 <br />800 W Santa Ana <br />Blvd. - 10111445404/06/23