Laserfiche WebLink
McPherson Engineering By: N.Y. <br />Date: 1/20/23 <br />Gravity Loads: <br />DEMAND DECREASED BY 6.15% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 2.92% < 10% = OK! <br />Anchorage: <br />DEMAND OF 474.4LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />1/20/2023 12:02 PM <br />7 of 7 <br />©McPherson Engineering <br />509 S Pacific Ave <br />02/10/23