My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
862 S Harbor Blvd - Plan
PBA
>
Building
>
ProjectDox
>
H
>
Harbor Blvd
>
862 S Harbor Blvd
>
862 S Harbor Blvd - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:11:10 PM
Creation date
6/1/2025 12:11:01 PM
Metadata
Fields
Template:
Plan
Permit Number
20181780
101117800
Full Address
862 S Harbor Blvd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Santa Ana <br />Building and Safety Department <br />- <br />Santa Ana, CA <br />Subject:Flush-mount PV Installation on New Residences <br />Project: <br />Plan:2A Lot #20 # of Mod 7 <br />862 South Harbor Blvd No. of Stories:3 <br />Santa Ana, CA <br />V&A Project No. 15-3457 <br />The purpose of this letter is to provide a review of the existing single family residential <br />development for the attachment and support of the proposed photovoltaic arrays as outlined in <br />the drawings prepared by Sunnova for City Ventures. The limitation to our review is to <br />the overall support and attachment of the photovoltaic array to the roof system designed by <br />others. The gravity and lateral inpact of the proposed solar system has been accounted for in <br />the original design for the project by the engineer of record for the development <br />The project is to be constructed by City Ventures and has been designed by another licensed <br />engineer per the requirements of the latest edition of the 2022 CBC as amended by the local jurisdiction. <br />Our design includes the assumption that the structure has been designed by a California Licensed <br />engineer and that the structure has been constructed in accordance with that design. <br />The proposed roof structures have been designed for a top chord design dead load of <br />10 psf, which includes 2.5 psf PV allowance. <br />The project has been designed for a wind exposure C, with an basic wind speed of 100 MPH. <br />The roof is to be constructed of composition shingles. <br />The photovoltaic array will mount flush to the roof planes with a maximum of 8" space between <br />the bottom of the panels and the finish roofing. The proposed photovoltaic array consists of <br />7 modules on each roof. Roof pitches may vary between 3:12 & 5:12. <br />Panels shall be setback a minimum of 36" from ridge lines and 19" from valleys for all orientations. <br />The photovoltaic array rails shall run perpendicular to the roof slope. The photovoltaic array <br />mounts shall be Unirac, Solar Mount, L-foot or equivalent and shall be installed at a spacing <br />not more than 48” o.c. Each mount shall connected to the roof truss top chord with a minimum <br />of (1) 5/16” diameter stainless steel lag screw with a minimum of 2-1/2” penetration into the top <br />chord of the truss. Vertically adjacent mounts shall not bear on the same roof trusses, but <br />should be staggered over every other truss wherever possible. Mounts should be within 12” of <br />the ends of all rails. <br />V I N C I & A S S O C I A T E S <br />Structural Engineers <br />October 11, 2023 <br />Santa Ana 7 Multi Family Residential Development <br />175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360 <br />805.496.2100 • VinciSE.com <br />862 S Harbor Blvd <br />1/2/2024
The URL can be used to link to this page
Your browser does not support the video tag.