My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
909 N Grand Ave - Plan
PBA
>
Building
>
ProjectDox
>
G
>
Grand Ave
>
909 N Grand Ave Unit# EV
>
909 N Grand Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:11:18 PM
Creation date
6/1/2025 12:11:04 PM
Metadata
Fields
Template:
Plan
Permit Number
20180613
101116238
Full Address
909 N Grand Ave Unit# EV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Structural Calculations <br />Charge Ready Program <br />Date: 10/27/2023 <br />Calculated by: MM <br />Checked By: DPB <br />Mh3 Eh3 hg3 <br />2 <br />3 heq3 <br />1.33 kip ft <br />Ev3 Fv DL3 weq3 leq3 239 lb(Vertical Seismic Force, ASCE 7-16 Section 13.3.1.2) <br />IV. Anchor Design <br />Note: Anchor Design is performed in Hilti Profis. The anchors pass all checks. <br />EV SWBD-1 <br />Pu 0.9Weq1 Ω Ev10.89 kip <br />Vu max Wx1 Wz1Ω Eh1 2.05 kipAnchor Loading; Conservatively use envelope loading <br />Mu max M x1 Mz1Ω M h1 10.24 kip ft <br />EV SWBD-2 <br />Pu 0.9Weq2 Ω Ev20.18 kip <br />Vu max Wx2 Wz2Ω Eh2 0.41 kipAnchor Loading; Conservatively use envelope loading <br />Mu max M x2 Mz2Ω M h2 1.46 kip ft <br />150kVA Transformer <br />Pu 0.9Weq3 Ω Ev30.47 kip <br />Vu max Wx3 Wz3Ω Eh3 1.07 kipAnchor Loading; Conservatively use envelope loading <br />Mu max M x3 Mz3Ω M h3 2.66 kip ft <br />V. Foundation Design <br />Note: Foundation Design is performed in RISA Foundation. The foundation passes all checks. <br />Page: 5 of 5 <br />909 N Grand Ave - <br />101116238 & 201806132/15/2024
The URL can be used to link to this page
Your browser does not support the video tag.